Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Telemetered Gaging Station Installation (Instream & Diversion Sites)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the design, supply, and installation of automated systems to measure water level, flow, and diversion at up to 125 instream and diversion sites across California. Each system will include sensors, data loggers, solar power units for energy independence, and communication modules to transmit real-time data remotely. The work is intended to support water rights monitoring and management by the California State Water Resources Control Board, Division of Water Rights, ensuring accurate and continuous data collection for regulatory compliance and resource allocation. The project falls under NAICS code 221320, indicating it is related to water supply and irrigation systems, and is structured as a subcontract to support broader state water monitoring initiatives. The systems must be rugged, reliable, and capable of operating in remote and diverse environmental conditions with minimal maintenance. Site-specific installation requirements may vary depending on terrain, accessibility, and hydrologic conditions. All equipment must be integrated to ensure seamless data transmission, power efficiency, and long-term durability under outdoor exposure. The contract does not specify a solicitation number or detailed set-aside provisions, but performance is expected to align with state water monitoring standards and timelines set by the agency. The project is posted with a future date of July 31, 2026, suggesting planned award and implementation will occur in that timeframe.

General Info

Design, supply, and install rugged automated water measurement systems at up to 125 California sites for real-time monitoring.

Agency

California → SWRCB, Division of Water Rights

NAICS

221320 - Sewage Treatment FacilitiesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Water Rights
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Water Rights
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, supply, and installation of automated water level, flow, and diversion measurement systems at up to 125 sites, including sensors, data loggers, solar power, and communication modules.

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
Sewer Bypass PumpingThe contract titled Sewer Bypass Pumping involves the temporary rerouting of wastewater flow to enable the safe and uninterrupted replacement of an existing pipeline, ensuring continuous sewer service during construction. This subcontract is issued under the Small Business Administration’s set-aside program, specifically targeting small businesses including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. The NAICS code 221320 indicates the work falls under wastewater collection systems, reflecting the specialized technical nature of the task requiring expertise in temporary pumping infrastructure and wastewater management. The contract is set to close for responses on September 16, 2026, and is associated with the Filanc organization, which is responsible for managing the project. Although specific location details for the place of performance and agency office are not provided, the project is linked to the Buccaneer Lift Station through a designated online portal, suggesting the work will occur at or near this municipal infrastructure site. The work is structured as a fixed-price design-build effort, meaning the contractor is responsible for both designing and constructing the temporary bypass system to meet performance requirements within a predetermined cost, with no cost overruns permitted. All participants must comply with SBA-certified business eligibility requirements to qualify for this opportunity.
Filanc

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Rim Village
Solicitation # 140P2026R0101
The contract is for the complete replacement of the wastewater treatment plant at South Rim Village, with performance expected to begin on February 1, 2027, and conclude by February 1, 2030, within a 1,095-day timeline after notice to proceed. The scope includes construction of the new WWTP, a companion compost facility, operational and maintenance support services, and access road improvements, with two optional line items for radon gas testing and active mitigation. Work is subject to strict sequencing requirements, including commencement within 10 days of notice, diligent prosecution, and completion without undue delay. The solicitation requires proposals to be submitted via email in two volumes—one technical and one business/price—each adhering to strict formatting, labeling, and size limits of 38 MB per attachment and 100 MB per email. Key personnel, including the Project Manager, Superintendent, Quality Control Manager, and Safety Manager, are critical to履约, with substitutions prohibited for the first 30 days and requiring detailed justification and approval thereafter. Offerors must demonstrate relevant technical experience in wastewater plant installations, a realistic technical approach, and qualified key staff, with past performance evaluated based on subcontractor track records. Small business participation is a formal evaluation factor, with full credit automatically awarded to small business offerors. The government will conduct a best-value tradeoff, considering technical merit, past performance, and pricing equally, and may select a higher-priced proposal if its technical advantages are substantial. Compliance with FAR clauses governs labor standards, including minimum wages under Executive Order 14026, diversity and inclusion requirements, bio-based product reporting, hazardous material handling, ozone-depleting substances, Buy American provisions, and inspection of construction. The contractor is required to submit invoices electronically through the Invoice Processing Platform, and the use of all-terrain vehicles is prohibited on site in the Intermountain Region. Drawings, specifications, geotechnical reports, hazardous materials investigations, and wage determinations are included as attachments totaling over 5,000 pages, forming the complete technical baseline. All submissions must be sent to three designated email addresses with a strict subject line format, and no hard copies are accepted. The contract is being procured as a sealed bid under a firm-fixed-price structure with no identified contract value due to unpopulated pricing fields, though the full scope is detailed through a comprehensive set of technical specifications and compliance obligations.
Dsc Contracting Services Division

POSTED

3 days ago

DEADLINE

in 3 months
View Details