Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Temecula Parkway Residential Development Project (TTM39073 and TTM38995)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Riverside County

NAICS

237210 - Land SubdivisionView NAICS

Place of Performance

7Temecula Parkway, south of De Portola Road and west of Anza Road, Temecula, CA, 92592

Set-Aside

NONE

Documents

(7)

Temecula Parkway Residential Development Project NOP Final 12-22-2025

PDFnotice-of-preparation

2026010057 NAHC Comment on Temecula Parkway Residential Development Project

PDFcomment-letter

Notice of Completion for Temecula Parkway Residential Development Project

PDFnotice-of-completion

Temecula Parkway Residential Development NOP Spanish 2025

PDFpresolicitation

NOP Exhibits - Regional and Project Location Maps

PDFother

DTSC Comments on NOP for Temecula Parkway Residential Development Project

PDFcomment

Temecula Parkway Residential Development Project CEQA Summary Form

PDFceqa-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Tim WheelerPrincipal Planner
Brandon BarnettRepresentative with KWC Engineers, President

Interested Companies (1)

Show more
Carlson Strategic Land Solutions
San Juan Capistrano, CA

Full Description

Show more
The Applicant proposes to construct a total of 324 single-family detached residential units on approximately 84.09 acres in two phases. The northern phase (TTM 38995), which is north of Temecula Parkway, includes the construction of 278 single-family detached residential homes on approximately 61.49 acres. The southern phase (TTM 39073), which is south of Temecula Parkway, includes the construction of 46 single-family detached residential homes on approximately 22.60 acres. Site improvements would include infrastructure, open space, bio-retention basins, park areas, and landscaping. In addition, the Project includes the following off-site improvements. Re-align Temecula Parkway along the Project frontage (2,272 linear feet) within existing right-of-way consistent with the County’s General Plan proposed alignment. Improve De Portola Road from the western Project boundary to Anza Road (3,235 lineal feet). Install 1,000 linear feet of off-site storm drain improvements within De Portola Road. Install 3,045 linear feet of off-site sewer pipe within Temecula Parkway west of the Project site. Approval of Tentative Tract Map 38995 and 39073, Zone Change 2400037 and 2400043, Plot Plan 250064 and 250065.

Similar Contracts

Same NAICS industry code

NAICS: 237210
New
SLED
PLNP2024-00105 435 W. Delano Street Parcel Map
Solicitation # PLNP2024-00105
This project, identified as PLNP2024-00105 and located at 435 West Delano Street in the Rio Linda/Elverta community of Sacramento County, involves the division of a 5-acre lot into two residential parcels under AR-2 Agricultural-Residential zoning. Parcel 1 will be approximately 2.8 net acres, and Parcel 2 will be approximately 2.0 net acres, featuring a 1.4-acre designated buildable area for a residential homestead. Both lots will utilize individual private water wells and septic systems, and each will include one shipping container for private storage. The project requires a Parcel Map for the division and a Design Review to ensure compliance with Sacramento County Countywide Design Guidelines. To facilitate the new configuration, the project includes the removal of several trees and the relocation or removal of existing accessory structures. Access to Parcel 2 will be established via a 20-foot-wide ingress/egress easement through Parcel 1, and a fire department turnaround will be constructed on Parcel 2 according to SacMetro Fire District standards. A 10-foot-wide Public Utility Easement will also be established along the project frontage. The project has been granted a Notice of Exemption from further environmental review under CEQA Guidelines Section 15183, as it remains consistent with existing zoning and the General Plan Update EIR.
Sacramento County

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237210
New
SLED
Harvest Estates Residential Project; TSM 2025-01, ANX 2025-01, GPA 2025-01, REZ 2025-01, ENV 2025-02
Solicitation # ENV 2025-02
The Harvest Estates Residential Project is a comprehensive land-use development in Kerman, California, managed by the City of Kerman Community Development Department. The project involves the annexation of approximately 88.89 acres from Fresno County into the city limits, incorporating a General Plan Amendment, rezoning, and a vesting tentative subdivision map. The primary development consists of a 180-lot single-family residential subdivision on 31.28 acres, including internal streets, sidewalks, utility improvements, and drainage facilities. Additionally, the project includes a commercial remainder parcel and a 1.1-acre neighborhood park authorized via a conditional use permit, which will feature picnic areas, a shaded play structure for children, lawn areas, and pedestrian paths. The project has undergone environmental review under CEQA, resulting in a Mitigated Negative Declaration and a subsequent Notice of Determination certifying that the project will not have a significant effect on the environment. Key administrative actions include the detachment of approximately 38.93 acres from the Kings River Conservation District as approved by Fresno LAFCo. The development is bounded by West Nielsen Avenue to the north, North Del Norte Avenue to the west, West Whitesbridge Road to the south, and North Vineland Avenue to the east. Project coordination is led by City Manager John Jansons and the Community Development Department, with technical support from Precision Civil Engineering.
City of Kerman

POSTED

4 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS