Temporary Fire Station 9, Project No. WH182A, PD265-2601
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Contra Costa County Fire Protection District
NAICS
N/A
Place of Performance
Sally Ride Drive and Marsh Drive, Concord, CA, 94520Set-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Contra Costa County Fire Protection District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Contra Costa County Fire Protection District
Office AddressN/A
Contacts
Full Description
Show more
The Temporary Fire Station 9 (project) will be
used as interim housing and maintain uninterrupted emergency response services for Fire Station 9 personnel,
apparatus, and equipment during demolition and reconstruction of the existing station located at 209 Center
Avenue, Pacheco, CA 94553. The project will operate 24 hours per day, seven days per week, for approximately
two years during construction of the replacement Fire Station 9.
The project will consist of an approximately 3,000-square-foot prefabricated stressed membrane apparatus
structure; a one-story, approximately 1,500-square-foot, prefabricated modular living quarters building; a
200-square-foot Conex storage container; four parking spaces (one ADA-accessible and three staff parking
spaces); and new chain-link security fencing with vehicle and personnel access gates. The prefabricated stressed
membrane apparatus structure will be used for the storage and protection of two fire engines and
associated emergency response equipment. The prefabricated modular living quarters will contain firefighter
sleeping quarters, a kitchen, dining and dayroom space, restrooms, laundry facilities, office space, and support
areas. The Conex container will serve as supplemental storage for firefighter gear, equipment, and supplies.
Additional site improvements such as utility connections, lighting, and circulation areas will be added as necessary
to support continuous fire station operations.
Construction is anticipated to begin in March 2027 and take approximately 3 months for completion. Real
property transactions, including but not limited to, leases, right-of-way acquisition and permanent and temporary
easements may be needed. Utility relocations may be necessary to support this project. Utility connections to
existing water, sewer, electrical, and stor.m drain lines in the project area will be required. Ground disturbance and
excavations to a maximum depth of 6 feet are anticipated for utility trenching. Appropriate Best Management
Practices for water pollution control will be implemented. Night or weekend work may occur. Emergency vehicles
will have access at all times. Upon completion of the replacement Fire Station 9, operations would transition to
the new facility.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS