Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Temporary Traffic Control and Fencing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the California Department of Transportation involves the supply and installation of temporary traffic control devices and safety fencing for prime contractors on highway projects in Sacramento. The scope of work includes the deployment of high-visibility fencing, construction signage, portable radar speed feedback signs, and automated flagger assistance devices to ensure an active traffic control system is in place. All services must strictly comply with Caltrans flagging and temporary traffic control requirements. The solicitation was posted on November 2, 2026, with a response deadline of December 2, 2026. The project falls under NAICS code 561990.

General Info

Subcontract for supplying and installing temporary traffic control and safety fencing in Sacramento.

Place of Performance

Sacramento, CA, 95814, USA

Set-Aside

NONE

Documents

This scope was carved out of 02-0J53U4.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Trinity County At And Near Burnt Ranch From 0.5 Mile East Of Gray Creek Road To 1.0 Mile East Of Trinity River Bridge No. 05-0006

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs temporary traffic control devices and safety fencing for prime contractors on Caltrans highway projects. Installs high-visibility fencing, construction signage, portable radar speed feedback signs, and automated flagger assistance devices. Complies with Caltrans flagging and temporary traffic control requirements. Delivers an active traffic control system and safety fencing.

Similar Contracts

Same NAICS industry code

NAICS: 561990
New
WOJC - Fire Protection Systems Inspection, Testing, and Maintenance - December 1, 2026 to November 30, 2027
Solicitation # WOJC - Fire Protection Systems Inspection, Testing, and Maintenance (December 1, 2026 to November 30, 2027)
Education & Training Resources is seeking quotes for a subcontracting opportunity to provide comprehensive inspection, testing, and maintenance of fire protection and life safety systems at the Westover Job Corps Center in Chicopee, Massachusetts. The period of performance runs from December 1, 2026, through November 30, 2027. The scope of work includes annual inspections and testing of fire alarms across 23 buildings, annual and quarterly maintenance of automatic sprinkler systems in three specific buildings, annual flow testing for 21 fire hydrants, professional servicing of approximately 173 portable fire extinguishers, and semi-annual maintenance of kitchen fire suppression systems in two buildings. All services must comply with NFPA standards, the Massachusetts Comprehensive Fire Safety Code, and the Massachusetts State Building Code. Bids are due by November 6, 2026, and will be evaluated based on best overall value rather than the lowest price. Required submission materials include a completed bid sheet with a detailed cost breakdown, a proposed service schedule, Massachusetts licensing and credentials, and a full vendor packet containing a W-9, SAM.gov UEI number, business licenses, and certificates of insurance. The contract incorporates various Federal Acquisition Regulation clauses, including the Service Contract Act and Buy American requirements. Depending on the project value, performance and payment bonds may be required for construction-related tasks exceeding 35,000 dollars. Award eligibility is open to small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses.
Westover Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County At Leggett From 0.1 Mile North Of Route 1 To The Humboldt County Line Near Piercy
Solicitation # 01-0J9904
Solicitation 01-0J9904 is a construction project issued by the California Department of Transportation for improvements to a State Highway in Mendocino County. The scope of work covers the segment from 0.1 mile north of Route 1 to the Humboldt County line near Piercy, specifically between Post Mile T91.3 and T106.8. Key activities include placing hot mix asphalt, replacing signs, and improving drainage systems. The estimated cost of the project is 24 million dollars, with a required bid range of 140 to 200 working days. Job site activities must commence within 55 days of contract approval, and work within drainage channels is restricted to the window between June 15 and October 15 annually. The contract is governed by 2025 Standard Specifications and Standard Plans, with extensive modifications detailed in the Special Provisions across multiple divisions, including general provisions, earthwork, surfacings, and electrical work. Strict quality assurance standards are in place for precast concrete and equipment, including specific ASTM requirements for compressive strength, slump, and air content. The contractor must designate an on-site safety representative and adhere to prevailing wage rates as determined by the California Department of Industrial Relations. Additionally, the project mandates compliance with Buy America/Build America standards for manufactured products and requires specific marking and identification for precast barriers, steel segments, and laminated wood box posts.
Highway, Street, and Bridge Construction

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS