Temporary Traffic Control and Signage
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the implementation of temporary traffic control measures, signage, and steel plate protection at construction access points to maintain uninterrupted traffic flow during non-working hours. This work is critical for ensuring public safety and minimizing disruptions to road users while construction activities are pending or ongoing. The scope is focused on temporary measures designed to guide and protect vehicles and pedestrians around active work zones, with an emphasis on visibility, durability, and compliance with transportation safety standards. The contract is classified as a subcontract under NAICS code 238910 for other foundation, structure, and building exterior contractors, and is administered by Caltrans District 4 in the Bay Area/Oakland region. The performance location is specifically centered in Mill Valley, California, indicating this effort is tied to localized infrastructure projects requiring precise traffic management. The solicitation was posted on July 2, 2026, and while no solicitation number or set-aside details are provided, the work must align with state transportation protocols and maintain continuous operational access even outside standard work hours.
General Info
Agency
NAICS
Place of Performance
Mill Valley, CASet-Aside
Documents
This scope was carved out of 04-25-6-BB-2014.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Middle-Mile Broadband Network Project: ADF-F18-CD4-UG5; 04-25-6-BB-2014
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
