Tepee Work Center Well Pump Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The USDA Forest Service-Spoc Im is awarding a small business set-aside contract under FAR 19.5 for the Tepee Work Center Well Pump Project, a lump sum procurement for the removal and replacement of a 921-foot deep-well pump system with a new 5 HP submersible pump and associated controls, to be performed in Custer County, South Dakota, near Edgemont. The contract is solicited as a commercial item under FAR Part 12 with a deadline for offers on July 15, 2026, at 9:00 a.m. CDT, requiring submissions via email to both the Contract Specialist and Contracting Officer with a mandatory subject line. All offers must be submitted on the prescribed Excel Schedule of Items, with pricing rounded to the nearest whole dollar and no Adobe formats permitted; failure to meet these requirements renders a bid non-responsive. The offeror must be a certified small business under the NAICS code 237110 with a size standard of $45 million and must provide complete representations and certifications including Buy American compliance, anti-trafficking, security prohibitions, SAM registration, and DEI-related attestations affirming adherence to federal anti-discrimination laws and Executive Orders 14168 and 14173. The scope includes not only equipment installation but also diagnostics, inspection of cabling and drop pipe, connection to the existing pumphouse, and submission of extensive documentation such as design data, manufacturer certifications, disinfection and bacteriological test results, quality control reports, an O&M manual, and as-built drawings. Work must be performed by personnel holding a South Dakota well driller or pump installer license in accordance with state code 46-6-9.2 and must include a licensed pump installer, qualified electrician, and a well technician with proven experience in deep-well installations over 800 feet, whose resumes must be submitted for review. The period of performance runs from July 30 to August 31, 2026, with final acceptance contingent upon successful completion of performance testing, submission of all required reports, and approval of the O&M manual by the Contracting Officer before any payment is authorized. The contract includes mandatory clauses addressing whistleblower rights, prohibitively restrictive confidentiality agreements, accelerated payments to small business subcontractors, trafficking in persons, and security exclusions, and requires strict adherence to site access protocols including checking in with USDA representatives upon arrival. Offer
General Info
Contract Value
$0Place of Performance
Custer, SD, 57730, USASet-Aside
Awardee
SKINNY CORPAward Issued Date
Timeline
Organization & Contact Information
Full Description
PROJECT: TEPEE WORK CENTER WELL PUMP PROJECT - BLACK HILLS NATIONAL FOREST- CUSTER COUNTY, SD
JUNE 11, 2026: AMENDMENT TWO (A0002) - Please read this AMENDMENT (A0002) in its entirety. This Amendment (A0002) provides responses to Contractor's questions. This information is found in the Attachments/Links section. Quotes are due by JUNE 17, 2026, at 9:00 a.m. Central Daylight Time. Submit Quotes by the due date/time to the POCs: Janice King, Contract Specialist, at contact@example.gov and to Lucas Dahlman, the Contracting Officer, at contact@example.gov.
JUNE 3, 2026: AMENDMENT ONE (A0001) - Please read this AMENDMENT (A0001) in its entirety as it moves the due dates up for questions and quote submissions. In addition, the POP has been amended and a site visit added for this project. AMENDMENT ONE (A0001) is located in the Attachments/Links.
Please read each of the attached documents (found in the Attachments/Links section) in their entirety. Questions were due by June 11, 2026, at 9:00 a.m. Central Daylight Time and Quotes are due by JUNE 17, 2026, at 9:00 a.m. Central Daylight Time.
Description of Work: The contractor shall provide all labor, materials, equipment, testing, and documentation necessary for the removal of the existing and replacement of a new deep-well pump system for a 921-foot well, including the installation of a new 5 HP submersible pump and associated controls. See the SOW, SPECS, and SOI for additional information.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Agriculture → USDA Forest Service-Spoc Im
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
