Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Terminal 3 West Modernization - TP 245 - East: Foundations / Piles

Closed
10071.76 - TP 245State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
SLED
Traditional Territories Program, Concrete Slab Construction – Omak Fish and Wildlife Bullpen (Saint Mary’s Mission Campus)
Solicitation # tradTerConSlab.pdf
The Confederated Tribes of the Colville Reservation, Traditional Territories Program, is soliciting proposals for the construction of a six-inch thick, 60-foot by 40-foot concrete slab at the north end of the bullpen adjacent to the Omak Fish and Wildlife office on the Saint Mary’s Mission campus in Nespelem, Washington. The project aims to create a durable, level surface to accommodate an electric boat. The selected contractor will be responsible for all site preparation, grading, forming, reinforcement, concrete placement, finishing, and cleanup, ensuring the final product meets all applicable building codes and load-bearing requirements. Proposals must be submitted by 3:00 p.m. PST on November 26, 2026, and should include a detailed project cost, anticipated timeline, materials and methods, and resumes for assigned personnel. Award preferences are heavily weighted toward Tribal enterprises through a TERO scoring system, with a specific provision allowing a responsible Indian Offeror to be awarded the contract if their price is within 10 percent of the lowest non-Indian offer. Financial security for the project requires either a 25 percent retainage or a performance bond, with a mandatory performance bond required for any contract exceeding 100,000 dollars. All payments are subject to the Colville Tribes' appropriation process and the availability of funds in the tribal treasury. Proposals are limited to 30 pages and must include a title page, transmittal letter, contractor profile, and a detailed approach to the work. Hard copy submissions must be delivered in sealed envelopes to the designated office in Nespelem or sent electronically to the primary point of contact.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Turner Construction Company is managing the Terminal 3 West Modernization project at San Francisco International Airport, which involves expanding the facility by approximately 631,022 gross square feet and renovating 516,644 gross square feet. A key component of this effort is the Courtyard 4 Connector, a new seven-story building designed to link Terminal 3 and the International Terminal through secure passenger corridors and baggage handling systems. The project requires extensive phasing to ensure the terminal remains operational while implementing seismic retrofits, building system upgrades, and passenger experience enhancements. Trade Package TP-245 specifically covers the East Foundations and Piles, with an estimated cost of 4.3 million dollars. The scope of work includes the installation of 20-inch diameter steel pipe piles, micro piles, and foundation piles to support building expansions, passenger boarding bridges, and high mast light foundations. This package also encompasses pile testing, corrosion protection, and spoil handling. Bids are due by October 6, 2026, at 5:00 PM, and the contract requires a 15 percent LBE participation rate. Interested parties should contact Briana Padilla for prequalification criteria.

General Info

Turner Construction seeks bids for SFO Terminal 3 East Foundations and Piles project.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Design-Builder
Contacts1 person available
OfficeSan Francisco, CA, 94128, USA
Organization / AgencyCalifornia → Design-Builder
Office AddressSan Francisco, CA, 94128, USA
Contacts
Tiffany Gonzalez-RuizProcurement Officer I

Full Description

Show more
Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Courtyard 4 Connector (C4C) The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions. Trade Package No.: TP-245 Trade Package Title: East: Foundations / Piles Description of the Trade Package Scope of Work: The deep foundations scope for the East Addition include furnishing and installing 20-inch diameter steel pipe piles, micro piles, and foundation piles required to support the building expansion, passenger boarding bridges, and high mast light foundations. The scope also includes mobilization, pile testing, pile cutoffs, spoil and slurry handling, corrosion protection requirements, and all labor, equipment, materials, and testing necessary for a complete deep foundation system. Trade Package Bid Due Date and Time: 10/6/2026 by 5:00 PM Estimated Cost: $4.3M Main Trades of the Trade Package: Foundation, Piles, Concrete CMD LBE Participation Requirements % : 15% Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@tcco.com for SFO and Turner prequalification criteria for this package. Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS