Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Terminal 3 West Modernization - TP 245 - East: Foundations / Piles

Active
10071.76 - TP 245State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Turner Construction Company is managing the Terminal 3 West Modernization project at San Francisco International Airport, which involves expanding the facility by approximately 631,022 gross square feet and renovating 516,644 gross square feet. A key component of this effort is the Courtyard 4 Connector, a new seven-story building designed to link Terminal 3 and the International Terminal through secure passenger corridors and baggage handling systems. The project requires extensive phasing to ensure the terminal remains operational while implementing seismic retrofits, building system upgrades, and passenger experience enhancements. Trade Package TP-245 specifically covers the East Foundations and Piles, with an estimated cost of 4.3 million dollars. The scope of work includes the installation of 20-inch diameter steel pipe piles, micro piles, and foundation piles to support building expansions, passenger boarding bridges, and high mast light foundations. This package also encompasses pile testing, corrosion protection, and spoil handling. Bids are due by October 6, 2026, at 5:00 PM, and the contract requires a 15 percent LBE participation rate. Interested parties should contact Briana Padilla for prequalification criteria.

General Info

Turner Construction seeks bids for SFO Terminal 3 East Foundations and Piles project.

Agency

California → Design-BuilderView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Design-Builder
Contacts1 person available
OfficeSan Francisco, CA, 94128, USA
Organization / Agency
California → Design-Builder
View Agency Profile
Office AddressSan Francisco, CA, 94128, USA
Contacts
Tiffany Gonzalez-RuizProcurement Officer I

Full Description

Show more
Design-Builder Firm Name: Turner Construction Company Project Overview: Terminal 3 West Modernization The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility. Courtyard 4 Connector (C4C) The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions. Trade Package No.: TP-245 Trade Package Title: East: Foundations / Piles Description of the Trade Package Scope of Work: The deep foundations scope for the East Addition include furnishing and installing 20-inch diameter steel pipe piles, micro piles, and foundation piles required to support the building expansion, passenger boarding bridges, and high mast light foundations. The scope also includes mobilization, pile testing, pile cutoffs, spoil and slurry handling, corrosion protection requirements, and all labor, equipment, materials, and testing necessary for a complete deep foundation system. Trade Package Bid Due Date and Time: 10/6/2026 by 5:00 PM Estimated Cost: $4.3M Main Trades of the Trade Package: Foundation, Piles, Concrete CMD LBE Participation Requirements % : 15% Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@tcco.com for SFO and Turner prequalification criteria for this package. Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
Sidewalk Repair at Little Rock Job Corps Center
Solicitation # sidewalk-repair-little-rock-job-corps-center
This subcontracting opportunity is for sidewalk repairs at the Little Rock Job Corps Center in Arkansas, specifically focusing on Building 0006 Women’s Dorm. The scope of work involves mitigating trip hazards and elevated slab conditions by grinding elevated areas level at the vestibule entrance and Willow Wing exit, infilling a 6 by 6 inch hole near the Magnolia Wing with 3000 psi concrete, and installing yellow safety warning strips on elevated exit slabs to comply with NFPA 101 standards. The project is governed by the Federal Acquisition Regulation and requires adherence to EPA, OSHA, and Arkansas state regulations. The contract is a fixed-price award based on the most advantageous proposal considering price and price-related factors. Qualified offerors must provide a detailed fixed-price quote, a sequenced project schedule, proof of a valid Arkansas Contractor's License, and evidence of at least five years of relevant experience. Additional requirements include SAM eligibility, a 90-day bid guarantee, and compliance with Davis-Bacon prevailing wage rates via form SF-1413. The project is sales and use tax exempt, and the contractor must provide a certificate of insurance naming Serrato Corporation. Work is expected to commence within five business days of the award.
Little Rock Job Corps 6900 Scott Hamilton Drive Little Rock AR 72019

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details

More opportunities from California → Design-Builder

Same awarding agency