Terminal 5 Gatehouse Roof Replace and Internal Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Terminal 5 Gatehouse building will undergo extensive roof replacement and internal repairs to address structural degradation and safety concerns. The scope includes installing a roof overlay assembly, replacing all damaged roofing materials, and renewing critical components such as coping, flashing, scuppers, and drains. Three existing skylights will be removed and replaced, and a comprehensive fall protection system will be installed to ensure worker safety during and after construction. Approximately 2000 square feet of damaged wallboard will be replaced, with additional structural reinforcements added at door openings and corners, including tension ties at the southeast corner of the Server Room. A new 2x6 frame will be constructed to accommodate a cable ladder, and necessary load-bearing supports will be reestablished at the Server Room door. Damaged glazing panels will be replaced with additional shims installed above the relite frame, and two solid core doors with their frames will be swapped out along with resealing of all joints. The acoustical ceiling system will be entirely renewed, including replacement of both damaged panels and the mounting grid to restore noise control and visual integrity.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Replace approximately 2000 SF of damaged wallboard. Add blocking at doors and corners, including tension ties at southeast corner of Server Room. Frame (2x6) opening for cable ladder and reestablish necessary bearings at Server Room door. Replace damaged glazing panel and provide additional shims above relite frame. Replace 2 solid core doors and frames and reseal joints. Replace damaged acoustical ceiling panels and grid.
Similar Contracts
Same NAICS industry code
