Terminal Avenue Pumping Station Surge Tower Bypass

Open
terminal-avenue-pumping-station-surge-tower-bypass

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 1 day

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Companies, Inc.
Contacts1 person available
OfficeN/A

Full Description

Show more
Construct a new sanitary sewer force main bypass system at the Terminal Avenue Pumping Station in New Castle, Delaware. The work includes site demolition, installation of new 36-inch, 24-inch, 20-inch, and 14-inch ductile iron force mains and associated fittings, construction of valve vaults and surge relief structures, installation of valves and appurtenances, dewatering operations, removal of portions of the existing force main, testing and startup of the new system, pavement and fence restoration, erosion and sediment control measures, landscaping, and all related site restoration work required to place the bypass system into service. Phase 1 is to locate the existing force main, install Bypass force main, surge relief valve piping, surge relief valve vault, 24" insolation Valve Vault, and backfill. Phase 2 is to establish force main dewatering connection, coordination closure of 36" knife gate valve to isolate the 36" force main, dewater existing Terminal Ave. force main via a 6" tap, then open cut pipe to pump out remaining water. Phase 3 is to remove a portion of the 36" PCCP force main, install remaining force main isolation valve, vault and piping. Close 24" isolation valve, connect to potable water and flush and drain at flushing connection at tapping saddles to flush line and drain at flushing connection in 24" isolation vale vault. Pressure tests the 36" force main and gain acceptance from owner. Phases 2 and 3 will require 24-hour operation and have to be completed in a 72-hour timeframe.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS