Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on November 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

The Collective Off Rome Development Infrastructure Work

Closed
PE-62250-NONST-2026-000000011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The City of Carrollton, Georgia, is soliciting sealed proposals for The Collective Off Rome Development Infrastructure Work, a project focused on the demolition and installation of critical utility networks along two new local streets connecting W. White St and Abby Lane. The scope of work includes the removal of approximately 201 linear feet of storm sewer and 1,207 linear feet of sanitary sewer pipe. New construction requirements consist of 1,900 linear feet of storm sewer with 27 structures, 1,343 linear feet of sanitary sewer with 10 structures, and 1,633 linear feet of public water main featuring 4 fire hydrants and 56 service lines and meters. The contractor is responsible for implementing and removing erosion, sedimentation, and pollution control measures and must maintain close coordination with the City and Project Engineers. Proposals are due by 10:00 a.m. on December 22, 2025, and must be submitted in triplicate in sealed envelopes to Carrollton City Hall. A pre-bid conference on December 9, 2025, is mandatory. Award selection will be based on a best-value trade-off process, weighted equally between the total bid price (50%) and the quality of work and references (50%). Bidders must provide a bid bond for 5% of the bid amount, and the successful contractor will be required to furnish performance and payment bonds for 100% of the contract value. All work must comply with the Georgia Open Records Act and Title VI of the Civil Rights Act nondiscrimination regulations.

Documents

1
PDF, High priority: read this first2 pages · rfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 15 days
  • Lift Station No. 85 ReplacementOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Carrollton
Contacts1 person available
OfficeN/A

Full Description

Show more
This project consists of demolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. These improvements will be constructed along two new local streets that will connect W. White St and Abby Lane. The demolition and removal of storm sewer networks consist of approximately 201 LF of pipe and 3 structures. The installation of proposed storm sewer networks consists of approximately 1900LF of pipe, and 27 structures. The demolition and removal of sanitary sewer networks consist of approximately 1207 LF of pipe and 4 structures. The installation of sanitary sewer networks consists of approximately 1343 LF of pipe and 10 structures. The installation of public water main consists of approximately 1633 LF of pipe, 4 fire hydrants, and 56 water service lines and meters. Erosion, Sedimentation and Pollution control measures must be implemented, maintained, and removed post-installation. The contractor will be required to maintain good communication and coordination with the Project Engineer and City Engineer through the entire duration of construction activity.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS