Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on July 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

The Crystal Park Phase I Development Project

Closed
PennBid: 148083State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Crystal Park Phase I Development Project for Dickson City Borough in Lackawanna County, Pennsylvania, involves a comprehensive scope of work including site preparation, demolition, and the installation of various recreational and infrastructural elements. Key tasks encompass mobilization, erosion and sediment control measures, land clearing, grading, and coordination with the borough's Department of Public Works for parking lot improvements. The project also includes installing infiltration trenches, rain gardens, a park sign, asphalt trail, benches, trash receptacles, bike racks, fencing, sports equipment such as basketball hoops and pickleball nets, a frost-free hose bib, and specialized structures like bullpens, a press box, dugouts, a baseball field fence, and a composting restroom. Final grading, seeding, mulching, and site cleanup are also required. Bidders must submit sealed electronic bids via the PennBid Program by August 30, 2024, with a mandatory pre-bid conference scheduled for August 20, 2024. The contract requires a bid guarantee of at least 10% of the bid amount, and the project is subject to Davis Bacon and Pennsylvania Prevailing Wage Rates. The scope may be adjusted or items removed to stay within budget, and the borough reserves the right to reject any proposals or waive irregularities. The project emphasizes adherence to approved plans, proper documentation, and coordination with licensed engineers for certain structures, ensuring comprehensive development of the park facilities within a budget range of $500,000 to $1,500,000.

General Info

Place of Performance

PA, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Grand Jury Court Reporting and Recording ServicesOpen now, due in 11 days
  • FY2027 Grants to Highest State Courts to Improve GuardianshipOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Dickson City Borough, Lackawanna County
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Sealed bids will be received electronically via the PennBid Program by Dickson City Borough, Lackawanna County Pennsylvania until 3:00 pm on Friday, August 30th, 2024. The sealed bids will be opened and read at the offices of Woodland Design Associates, Inc., 119 Lincoln Street, Honesdale, PA 18431, at approximately 3:30 pm on that same day, for the following Contract: The Crystal Park Phase I Development Project Dickson City Borough, Lackawanna County, PA a) Mobilization to the site and staging. b) Material purchase and installation of temporary erosion and sediment control measures per the PA DEP Chapter 102 permit and the approved Erosion and Sediment Control Plan and specifications. c) Demolition and site preparation for proposed project items; including land clearing and rough grading, per the plan drawings and specifications. d) Coordination with Borough DPW so they may install the paved parking area. Contractor shall off-haul excess spoils and install ADA parking sign and paint, per the plan drawings and specifications. e) Material purchase and installation of the infiltration trench, including topsoil, plants, seed, mulch, and compost; per the plan drawings and specifications. f) Material purchase and installation of rain garden 1, including topsoil, plants, seed, mulch, and compost; per the plan drawings and specifications. g) Material purchase and installation of rain garden 2, including topsoil, plants, seed, mulch, and compost; per the plan drawings and specifications. h) Material purchase and installation of the park sign, per the plan drawings and specifications. i) Material purchase and installation of the asphalt trail, per the plan drawings and specifications. Please note that this item must be fully installed and paved by November 1, 2024. j) Material purchase and installation of the bench and trash receptacle concrete pads and receipt, assembly, and installation of the benches and trash receptacles (purchased by the owner) per the plan drawings and specifications. All surface mounting fasteners, drilling, and materials shall be provided by the contractor. k) Material purchase and installation of the bike rack concrete pads and receipt, assembly, and installation of the bike racks (purchased by the owner) per the plan drawings and specifications. All surface mounting fasteners, drilling, and materials shall be provided by the contractor. l) Material purchase and installation of the Chain link Fence (at Pickleball Courts), per the plan drawings and specifications. m) Material purchase and installation of the Pickleball Nets, per the plan drawings and specifications. n) Material purchase and installation of the Basketball Hoops, per the plan drawings and specifications. o) Material purchase and installation of the frost free hose bib near baseball field, per the plan drawings and specifications. p) Material purchase and installation of the bullpens, including chain link fencing, pitching mound, home plate, and mound rubber; per the plan drawings and specifications. q) Material purchase and installation of the press box, including the concrete pad, floor drain(s), frost free hose bib, and electric service, per the plan drawings and specifications. This includes obtaining PA Engineer stamped drawings and providing them to the landscape architect. r) Material purchase and installation of the dug outs, including the concrete pad, floor drain(s), benches, and electric service, per the plan drawings and specifications. This includes obtaining PA Engineer stamped drawings and providing them to the landscape architect. s) Material purchase and installation of the Baseball Field Chain Link Fence and Gates; per the plan drawings and specifications. t) Material purchase and installation of the Composting Restroom; per the plan drawings and specifications. This includes obtaining PA Engineer stamped drawings and providing them to the landscape architect. u) Final topsoil grading, rolling, seeding, and mulching. *Please note: the contractor is responsible for verifying the project layout, all lengths, dimensions, and material amounts. Those provided are for estimate purposes only and do not include any contingencies. Costs and amounts should be provided by the contractor so the project may be built as shown in the drawings and specifications. Contractor is responsible for the off-haul of all debris and excess spoils to a site with an approved E&S plan. The Drawings, Specifications, and other Contract Documents are available at no cost via the PennBid Program (https://pennbid.bonfirehub.com). The bid must be submitted on forms furnished by the Landscape Architect and must be accompanied by a bid guarantee in an amount not less then ten percent (10%) of the amount of the base bid submitted. This sum will serve as a bid security and will be forfeited to Dickson City Borough, Lackawanna County, Pennsylvania as liquidated damages in the event that an award is made, and the Contract and Bonds are not promptly executed as required in the contract documents for required bonds and insurance coverage. A mandatory pre-bid conference will be held on Tuesday, August 20th, 2024, at 10 a.m. (weather pending) at the site. Bidders will meet at Crystal Park in Dickson City, Lackawanna County, PA (Shady Ln & Doloff Dr, Dickson City, PA 18447). No bid may be withdrawn for a period of sixty (60) days after the date specified for opening and reading of the bids, except as provided in accordance with the Pennsylvania Act No. 4 as approved on January 23, 1974. Dickson City Borough reserves the right to reject any and all proposals and to waive any technical defects and irregularities. Dickson City Borough reserves the right to remove any item from the project scope in the base bid form to ensure the project remains within the budget. Davis Bacon Federal Wage Rates and Pennsylvania Prevailing Wage Rates apply to this project. In instances where these wage rates conflict, the more expensive of the two must be used and provided.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS