Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 10, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CALL 002: F-35 Threat and Friendly (TAF) Visual Display System (VDS) Under CSO FA9302-21-S-C001

Closed
F1S0AX1076A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334118
New
Federal
58--RECORDER,VIDEO, IN REPAIR/MODIFICATION OF
Solicitation # N0038326RHA96
Solicitation N0038326RHA96, issued by NAVSUP Weapon Systems Support, seeks a contractor to provide all facilities, labor, materials, and tooling necessary to overhaul, upgrade, repair, test, and inspect 28 Video Recorders (NSN 5836-01-730-8912). The primary objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for all manufacturing aids, including fixtures and special test equipment, and must adhere to strict material requirements, such as the prohibition of MIL-W-81381 wire in favor of SAE-AS22759 series wire. Work is to be performed at the Mercury Mission Systems LLC facility in Torrance, California, with a required repair turnaround time of 50 days after receipt of each asset. The contract mandates a rigorous quality management system compliant with ISO 9001/SAE AS9100 and calibration standards meeting ANSI/NCSL Z540.3 or ISO-10012-1. Specific protocols are established for items determined to be Beyond Economical Repair, Missing on Induction, or requiring Over and Above Repair, all of which require written concurrence from DCMA and the Procuring Contracting Officer. Packaging must comply with MIL-STD-2073 and MIL-STD-129 for marking and labeling. Award will be made to a single responsible offeror based on the most advantageous combination of price and past performance, with past performance weighted as more important. Proposals are due by November 16, 2026, and payment will be processed electronically via the Wide Area Workflow system.
Navsup Weapon Systems Support

POSTED

4 days ago

DEADLINE

in 27 days
NAICS: 334118
New
Federal
NATO Business Opportunity: Keysight and Juniper Brand Name Equipment
Solicitation # RFQ-CO-42626053-PFE
The NATO Communications and Information Agency is seeking quotations for the procurement of Keysight and Juniper brand name equipment under RFQ-CO-42626053-PFE. The project aims to enhance NATO Communications and Information Systems security services through the acquisition of packet brokers, network TAPs, and firewall/VPN devices, including both COTS and TEMPEST variants. The scope includes Keysight Vision One and 400 packet brokers, various network TAPs, and Juniper SRX1600 and SRX2300 devices, along with necessary auxiliaries. All equipment must be delivered in new condition to Brunssum, The Netherlands, with incremental deliveries scheduled through March 2027. To be eligible to bid, U.S. prime contractors must maintain an active facility within the United States, register with the Neo eProcurement tool, and be pre-approved for NATO Competitive Procurement. Eligible firms must obtain a Declaration of Eligibility from the Department of Commerce, which requires a one-time application supported by a company resume and audited financial documents. Key deadlines include requesting the Declaration of Eligibility by October 23, 2026, with the RFQ planned for distribution on November 9, 2026, and an anticipated bid closing date of November 23, 2026. Contract award is estimated for January 15, 2027.
Bureau Of Industry And Security

POSTED

5 days ago

DEADLINE

in 3 days

General Info

NAICS

334118 - Computer Terminal and Other Computer Peripheral Equipment Manufacturing

Place of Performance

Edwards, CA, 93524, USA

Set-Aside

NONE

Documents

23

21-EWS-0015-Edwards+and+Nellis+drawings.pdf

PDF

21-EWS-0015-Edwards+and+Nellis+drawings+pt.2.pdf

PDF

476928_A-110+room+drawings.pdf

PDF

Aechelon+GFE+USAF+JSE+IG-Displays+Configuration-PUBLIC.pdf

PDF

Call+002+TAF+VDS++15+July+2021-updated+final1.docx

DOCX

Call+002+TAF+VDS+28+July+2021-updated+final1.docx

DOCX

DD14231+CDRL+1+COMPUTER+SOFTWARE+PRODUCT+%28CSP%29.pdf

PDF

DD14231+CDRL+2+ENGINEERING+DRAWINGS.pdf

PDF

DD14231+CDRL+3+INTERFACE+CONTROL+DRAWING+%28ICD%29.pdf

PDF

DD14231+CDRL+4+DESIGN+REVIEW+DATA+PACKAGE.pdf

PDF

DD14231+CDRL+5+TECHNICAL+REVIEWS+AND+AUDITS+ON+DEFENSE+PROGRAMS.pdf

PDF

DD14231+CDRL+6+COMMERCIAL+SUPPORT+DOCUMENTATION+%28CSD%29.pdf

PDF

DI-CMAN-81248+ICD+Revision+B+DID.pdf

PDF

DI-DRPR-81680+Engineering+Documentation+Product+Drawings+DID.doc

DOC

DI-ILSS-81335+Review+Data+Package+DID.pdf

PDF

DI-IPSC-81488+Computer+Software+Product++%28CSP%29+DID.doc

DOC

DI-MISC-80557+Commercial+Support+Documentation+%28CSD%29+DID.pdf

PDF

FA930221SC001+CSO+Posted+June+3+2021+for+Reperence.docx

DOCX

JSE+EDWARDS+AFB+ROOM+171++172-07.21.21.pdf

PDF

JSE+EDWARDS+AFB+ROOM+171++172+update.pdf

PDF

Nellis+drawings+pt.+1.png

PNG

Nellis+drawings+pt.+2.png

PNG

TAF+VDS-07.26.21.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

11 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice type changed from Sources Sought to Special Notice. Response deadline changed from Apr 12, 2021 to Jul 29, 2021. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline time changed from 1:00 PM UTC to 4:00 PM UTC on Jul 29, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 29, 2021 to Aug 5, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 5, 2021 to Aug 12, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9302 Aftc Pzz
Contacts2 people available
OfficeEDWARDS AFB, CA, 93524-1185, USA
Office AddressEDWARDS AFB, CA, 93524-1185, USA

Full Description

Show more
Please remember that this Call is not a request for proposal, but a request for a white paper in accordance with the white paper instructions (provided in Call FA9302SC001 Call 002) and a rough order of magnitude (ROM). The 412th EWG/EWJ has a requirement for Visual Display Systems (VDSs) to support the Threat and Friendly/Virtual Air Threat (TAF/VAT) Joint Simulation Environment (JSE). For the purposes of this document, a VDS is defined as an out-the-window (OTW) display screen, image projectors, auto alignment and calibration system, mechanical edge blending solution, and support structures and interfaces. The VDS contractor will integrate all the VDS components. The Air Force is seeking innovative solutions with regards to the fidelity and Field-OF-View (FOV) of the proposed VDS within this Call. The solution offered will need to consider the human factor relationship or the physical relationship of the primary components of the simulator. The important aspects to retain are the physical relationships of the pilot eye. The overarching Commercial Solutions Opening (CSO) FA9302-21-S-C001 is referenced in title and attached with the Call documents and link proved below for your reference. https://sam.gov/opp/cc93c3cd2c6e416fadad6b149968f3ae/view Call 002 has been updated to remove the projector part number and commonality with the VTTC requirement and the deadline has been extended until August 12, 2021 at noon P.S.T. to give vendors time to submit their white papers due to the updates to Call 002. Also, please Cc John Walker (john.walker.68@us.af.mil) when you submit your white papers. *Update (8/9/21): The actual drawings of the Nellis rooms have been added. *Update (8/5/21): Room drawings for Nellis has been added and Aechelon is creating a simplified slide that we can share with the Mini Dome vendors (see attached pdf. labeled Aechelon GFE USAF JSE IG)- In both rooms there are sloping roof joists that support metal deck above. The joists run east-west. West of grid 9, the joist spacing is either 6-6 or 6-8. East of grid 9, the spacing is half. Dimensions below are approximate. Regards, -Eliot Room 128 (see attached drawing labled Nellis drawing pt. 1): Low end Bottom of Deck: 12-4 Bottom of Joist: 10-4 High end Bottom of deck: 13-8 Bottom of joist: 11-7 Room 129 (see attached drawing labeld Nellis drawings pt. 2): Low end Bottom of Deck: 13-2 Bottom of Joist: 11-2 High end Bottom of deck: 13-11 Bottom of joist: 11-7 There is a girder that runs north-south over the room. Bottom of girder is 11-4 There is a main duct branch that runs east-west over the room. Bottom of duct is 9-7 Also the facility drawings have been further explained to the new rooms 171 and 172. There is also a second possibility that those room might be combined into one large room. So vendors should send options for both. Questions and answers will end on August 9, 2021 at 4:00PM PST. Please direct all questions to the Contracting Officer via email to ryan.coney@us.af.mil and cc Mr. Falilou Diouck at falilou.diouck@us.af.mil. *Updated Question and Answer (08/05/21): 1) Are we to interpret the USAF response of Aechelon IG supplying 12 channels as 12 indivisual projector input channels (that is, not 12 IG hw channels with multiple video outputs per channel)? The Nucleus IG's will be 11 OTW channels. Yes each of those channels should correspond to a projector. 2) Does the Aechelon IG channel count (12 channels) include the HUD projector? Aechelon does not provide any projectors. Aechelon is capable of HUD generation. 3) Does the Aechelon IG channel count (12 channels) support the baseline minimum TAF field of view requirement (220x120) or the target TAF field of view requirement (300x140)? The Aechelon IG channels can be configured for any field of view you desire from 0 to 360 degrees in each direction. The only reason we need more channels is because the projectors have a limited field of view they can project and each projectors gets its own channel in the IG. As long as the dome contractors can provide the required Field of view with no more than 11 projectors then the IG will work just fine. 4) Will the Aechelon IG support projector 4K (per channel) with pixel shifting video inputs, or native UHD 4K video inputs? Theoretically yes. JSE does not have a requirement for 8k displays. Aechelon has done projects before with up to 8k per channel. 4k per channel is very likely doable. 8k might require different hardware. Additionally you would need projectors that actually support 4k or 8k. 5) Does the Aechelon IG support projector 8K video inputs (per channel)? [Answered in Question 4 ^] 1) Are we to interpret the USAF response of Aechelon IG supplying 12 channels as 12 indivisual projector input channels (that is, not 12 IG hw channels with multiple video outputs per channel)? The Nucleus IG's will be 11 OTW channels. Yes each of those channels should correspond to a projector. 2) Does the Aechelon IG channel count (12 channels) include the HUD projector? Aechelon does not provide any projectors. Aechelon is capable of HUD generation. 3) Does the Aechelon IG channel count (12 channels) support the baseline minimum TAF field of view requirement (220x120) or the target TAF field of view requirement (300x140)? The Aechelon IG channels can be configured for any field of view you desire from 0 to 360 degrees in each direction. The only reason we need more channels is because the projectors have a limited field of view they can project and each projectors gets its own channel in the IG. As long as the dome contractors can provide the required Field of view with no more than 11 projectors then the IG will work just fine. 4) Will the Aechelon IG support projector 4K (per channel) with pixel shifting video inputs, or native UHD 4K video inputs? Theoretically yes. JSE does not have a requirement for 8k displays. Aechelon has done projects before with up to 8k per channel. 4k per channel is very likely doable. 8k might require different hardware. Additionally you would need projectors that actually support 4k or 8k. 5) Does the Aechelon IG support projector 8K video inputs (per channel)? [Answered in Question 4 ^] v/r, Q. Can you explain what you mean by +110 degrees vertical? Do you mean you want a 360 degree horizontal top cap? A. The VFOV is defined as 30 degrees below the fuselage reference line and up to 90 degrees - or 110 degrees above the fuselage reference line. These options yield a total of 120 degrees or 140 degrees VFOV The need for a - top cap depends on the type of dome structure being proposed, so we will leave that to the discretion of the offeror. JSE Technical Responses: FL40 projectors do not support NVG stimulation because there is no IR LED in the projectors. Section 2.6 states that NVG compatibility required for F-16 threats - is Simulated NVG acceptable via Image Generator or does it have to be Stimulated NVG. There is no JSE requirement for a particular projector model. NVGs used in the simulation will be F4949G. What is the Simulator Room Height requirements? The limiting ceiling height is nine (9) feet The V.FOV maximum of the target value does not match the offset values in Section 2.6.1? Is it still 120 or 140? The minimum V.FOV is 30 degrees below the fuselage reference line up to 90 degrees above the fuselage reference line, for a total of 120 degrees V.FOV. The target value is 30 degrees below the fuselage reference line to 110 degrees above the fuselage reference line, for a total of 140 degrees. How many channels are available from the Image Generator? The Aechelon Nucleus on contract for JSE has twelve (12) channels Section 2.6.16 states that the solution should fit in Room 171 and Room 172 (476928_A-110 room drawings.pdf) in JSE-E? Is the dimension in section 2.6.17 fit one of these rooms? Edited section 2.6.17 of the CALL -The dome must fit within a nine (9) foot ceiling, not 5m as originally specified in 2.6.17. Dome size 1.3m - 1.5m is valid. Two visual display systems plus two (2) 19 equipment racks per VDS must fit within the two possible room options; 1) the first layout possibility is a two room layout with room 171 having an area of 27ft W x 34ft L x 9ft H, and room 172 having an area of 27ft W x 14ft L x 9ft H. 2) the second possibility is a one room layout combining both rooms 171 and 172 without the dividing wall for an overall layout of 27ft W x 48ft L x 9ft H.. This is the most limiting case for the facility. If these dimensions are not technically feasible for your design, please indicate how your visual display system will fit within the floor plans provided. Is there any solution being hosted in other facility drawings provided (21-EWS-0015-Edwards+and+Nellis+drawings+pt.2.pdf) and if so, in what rooms? At JSE-E there will be four (4) F-35 domes + four (4) F-22 domes, in addition to the TAF visual display systems. At JSE-N, there will be twelve (12) F-35 domes + four (4) F-22 domes in addition to the TAF visual display systems. Is the ceiling height for the VDS 9 or 5m (16)? Nine (9) foot ceiling height Can you provide JSE-Nellis and JSE Wright Patterson room dimensions? Drawings will be provided Is the IG housed in the same rooms? The Aechelon Nucleus racks will be co-located with the visual display systems List of approved Network Switches? We suggest using the Cisco Nexus 9300 product line For MTBCF and MTBF, what is the predicted use time for the VDS? We anticipate using the TAF visual display systems for ten (10) hours per day, five (5) days per week, fifty (50) weeks per year

More opportunities from Department Of Defense → FA9302 Aftc Pzz

Same awarding agency

NAICS: 334220
Federal
URC-300 VHF/UHF Transceiver Assembly and Remote Control Unit (RCU)
Solicitation # ACQ-26-H096
The Department of the Air Force, through the Air Force Test Center (AFTC/PZZF) at Edwards AFB, intends to award a sole-source, Firm-Fixed-Price purchase order to ACG Systems, Inc. under solicitation ACQ-26-H096. This procurement is for one URC-300 VHF/UHF Transceiver Assembly and ten associated auxiliary components, including a Remote Control Unit (RCU), mounting brackets, antennas, and cabling. The equipment is required to expand the capabilities of the Mobile Telemetry Van supporting the B-52 Commercial Engine Replacement Program (CERP) and must integrate with the proprietary CM-350 V2 control protocols. The government has determined that ACG Systems, Inc. is the only responsible source capable of satisfying the requirement because they are the original equipment manufacturer and the hardware must meet mandatory military TEMPEST and EMI shielding standards for classified and unclassified operations. Utilizing non-ACG hardware would result in significant duplication of costs and cause a critical six-to-nine-month delay due to mandatory recertification, which would threaten B-52 engine replacement timelines and operational readiness targets. The award is based on the vendor's unique technical compatibility and the determination that the pricing is fair and reasonable based on historical data from previous contract FA9302-22-F-G596.
Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

POSTED

about 2 months ago

DEADLINE

in almost 2 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS