Timber Trails Tank and Pump Station Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Timber Trails Tank and Pump Station Project, managed by the Calaveras County Water District, involves the replacement of a deteriorating redwood potable water storage tank with a new, upsized ignition-resistant steel tank and the relocation of an existing pump station to a modern, energy-efficient facility with emergency power capabilities. The scope of work includes demolition and removal of existing infrastructure, electrical improvements, water quality enhancements, and the upgrading of inlet, outlet, overflow, and drain piping. Additionally, the project incorporates site-hardening measures, such as implementing defensible space and wildfire fuel reduction to protect critical community facilities. Construction is scheduled to begin in April 2028 and is expected to be completed by December 2029, spanning a 20-month period. The storage tank will be located on a CCWD easement on U.S. Forest Service land, while the pump station work will occur on the right-of-way adjacent to Sheep Ranch Road. Technical requirements specify the use of Class 2 aggregate base and engineered fill compacted to 95 percent relative density. Compliance measures include adhering to Calaveras County noise ordinances by limiting work to 7:00 a.m. to 6:00 p.m. daily, following federal and state hazardous materials laws, and conducting public outreach through website updates, brochures, and at least one public meeting. The project is categorized as exempt from CEQA requirements under Section 15302(c).

General Info

Replace aging tank with steel one, upgrade pump station, add emergency power, and harden site against wildfires in Calaveras County.

Agency

California → Calaveras County Water District

Place of Performance

Valley View Dr and Sheep Ranch Rd in unincorporated Calaveras County, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Calaveras County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Calaveras County Water District
Office AddressN/A
Contacts
Kevin WilliamsDistrict Engineer

Full Description

Show more
The proposed project would replace an existing deteriorating redwood potable water storage tank with a new, upsized ignition-resistant steel potable water tank; relocate and replace an existing pump station with a modern, energy efficient pump station with emergency power capability, and implement defensible space and site-hardening measures.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS