Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on January 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tiny Home

Closed
W911S226U2309Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 321991
New
SLED
REBID - ONE (1) TIME PURCHASE OF ONE (1) TWELVE (12) FOOT SINGLE-WIDE MODULAR TRAILER INCLUDING A (1) YEAR MANUFACTURER’S WARRANTY FOR PHILADELPHIA GAS WORKS (PGW) RICHMOND PLANT LOCATED AT 3100 E. VENANGO STREET, PHILADELPHIA, PA 19134
Solicitation # 36015
Philadelphia Gas Works (PGW) is soliciting bids for the one-time purchase, delivery, and onsite setup of one 12x56 foot single-wide modular trailer for the Richmond Plant located at 3100 East Venango Street, Philadelphia, PA. The trailer will serve as a shop for instrument technicians, providing space for equipment storage, training, and daily meetings. Key requirements include the installation of a restroom and an HVAC system, as well as necessary blocking and leveling upon delivery. The successful vendor must provide a one-year manufacturer's warranty and assist PGW in obtaining required building permits for structures remaining onsite for more than 180 days. Bids must be submitted electronically via PGW's Procureware portal by 2:00 PM EST on October 22, 2026, with a clarification deadline of October 20, 2026. The required delivery date is December 10, 2026, and bidders must confirm their ability to meet this timeline. Award will be granted to the lowest responsive and responsible bidder, with lead time and best and final offers used as tie-breakers. To be deemed responsive, bidders must provide pricing and lead times for all items, accept all PGW terms and conditions without exception, and submit a detailed floor plan for approval. Payment terms are Net 30 days, with shipping and setup costs included in the lump sum bid price.
Philadelphia Gas Works

POSTED

5 days ago

DEADLINE

in 2 days
NAICS: 321991
SLED
Purchase, Delivery, and Set up of a Modular Home
Solicitation # 2139746
The Herkimer County Land Bank Corporation is soliciting proposals for a complete turnkey solution for the purchase, delivery, and installation of a new modular home located at 386 West Main Street, Little Falls, New York. The project requires a high-quality, energy-efficient 3-bedroom, 2-bathroom residence, approximately 1,500 to 2,000 square feet, in either a Ranch or Cape style. The scope of work encompasses factory construction, transportation, crane setting, utility connections for electrical, plumbing, and HVAC, and all necessary interior and exterior finishing to provide a move-in-ready home on a permanent foundation. All work must comply with the New York State Uniform Fire Prevention and Building Code and current NY State Energy Code, with a final completion deadline and issuance of the Certificate of Occupancy by July 31, 2027. Proposals are due by 4:00 PM EDT on November 2, 2026, and must be submitted as PDF files or as two hard copies to the land bank office in Herkimer. Submissions must include detailed company information, a project approach, floor plans, a project schedule, and warranty details. Bidders are required to provide an itemized cost proposal covering the home, delivery, site work, utility connections, and permits, with optional pricing for foundations and upgrades such as garages or solar panels. Evaluation of proposals will be weighted based on cost (40%), quality (25%), experience (20%), completeness (10%), and schedule/warranty (5%). Minority and Women-Owned Business Enterprises and Veteran Business Enterprises are encouraged to apply.
Herkimer County Land Bank Corporation

POSTED

13 days ago

DEADLINE

in 13 days
NAICS: 321991
SLED
Modular Offices/Trailers for Police Range
Solicitation # 2026-IFB-LM-0466
The City of Pasadena is soliciting bids for the purchase, delivery, and installation of three modular office units to provide additional workspace for the Pasadena Police Department. The project requires two units measuring at least 36 by 64 feet and one unit measuring at least 44 by 40 feet. Each unit must be equipped with ADA-compliant restrooms, septic tanks, metal ADA ramps with canopies, commercial-grade flooring, HVAC, energy-efficient lighting, and a monitored security alarm system. All work must comply with the California Building Standards Code Title 24 and local fire and safety regulations. Eligible bidders must hold a valid California CSLB C-61/D-34 Prefabricated Equipment Contractor or B General Building Contractor license. The contract will be awarded to the lowest responsive and responsible bidder based on factors including material quality, financial resources, and past performance. Bids must be submitted electronically via the City's eProcurement Portal by 4:00 pm on October 28, 2026. Required documentation includes a Unique Entity Identifier, relevant experience forms, and various certifications regarding lobbying and non-collusion. As a FEMA-funded project, the contract incorporates specific federal requirements, including the Buy America Requirement, Davis-Bacon Act compliance, and prohibitions on covered telecommunications equipment under 2 C.F.R. Part 200. The selected vendor is responsible for the full project lifecycle, from design and permitting to final installation in Pasadena, CA. Financial security is mandated through Faithful Performance and Material and Labor bonds. Final acceptance is contingent upon a City inspection, with the contractor maintaining risk of loss until written approval is granted.
Police Department

POSTED

14 days ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract involves the provision of a prebuilt modular home designed for four-season use, featuring a screened-in outdoor porch with specific exterior dimensions not exceeding 13 feet 8 inches by 39 feet 7 inches. The structure will include a standing seam metal roof, engineered wood lap siding, insulated low-E vinyl windows, and a lockable steel entry door with a smart programmable lock. Additional exterior features include insulated skirting with access panels, outdoor LED lighting, and an electrical panel box rated for 50-amp service. Interior amenities comprise a fully equipped kitchen with stainless steel appliances, solid surface granite countertops, and tile backsplash; a full bathroom with modern fixtures; and a split system for heating and cooling. The interior outfitting includes wood blinds, vinyl plank flooring, smooth finished ceilings, solid wood trim, and a furniture package with beds, sofas, dressers, nightstands, ceiling fans, and wall-mounted TVs. Plumbing, electrical, and HVAC systems are designed to meet modern standards, including on-demand gas water heating and sufficient electrical capacity. A significant portion of the contract is devoted to comprehensive fire protection measures, including the design, installation, and certification of fire sprinkler, alarm, and mass notification systems in full compliance with multiple UFC and NFPA codes and standards. The contractor must engage a qualified, registered fire protection engineer (FPE) to oversee the entire fire protection design, construction, and testing process, including submitting fully engineered and stamped drawings for government review. These systems will feature addressable fire alarm components, automatic wet-pipe sprinkler systems with precise placement and protection, and specialized equipment such as locking post indicator valves, hose connections, and fire extinguisher cabinets. Rigorous testing protocols with government oversight are mandated before project acceptance. The contract also specifies structural supports using CMU piers and I-beams, concrete stairs with aluminum railings, and water and sewer connections with freeze protection measures. Electrical hookup to existing 50-amp service with a proper twist lock outlet is required. The overall scope covers not only construction but also detailed safety compliance, engineering oversight, and government coordination to ensure a fully functional, code-compliant, and habitable modular home for personnel housing.

General Info

Provision of a fully equipped, code-compliant modular home with fire protection and government-approved systems.

NAICS

321991 - Manufactured Home (Mobile Home) Manufacturing

Place of Performance

4525 Camp Hale Rd Fort Drum, NY 13602, NY, 13602

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jan 8, 2026 to Jan 14, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Drum
Contacts1 person available
OfficeFORT DRUM, NY, 13602-5220, USA
Office AddressFORT DRUM, NY, 13602-5220, USA
Contacts

Full Description

Show more

Reason for amendment is to change the response date from 08 January 2026 to 14 January 2026, to allow additional time due to the holidays.  Contractor shall provide a prebuilt modular home with a screened-in outdoor porch. Exterior dimensions not to exceed 13 feet 8 inched by 39 feet 7. inches Entrance to the building will be from the porch. Building to be built for 4-season use. Building exterior shall include the following (final colors to be determined at a later date, shall be selected from manufacturers standard selection), Standing seam metal roof, 5:12 pitch(with a factory applied finish), Engineered wood lap siding and trims, with textured finish and factory allied primer and finish, LED outdoor lighting near entryway, Insulated single hung low E vinyl windows without grid, Main entryway from porch to have lockable painted 6 panel steel entryway door with smart programmable smart lock, Provide electrical panel box in NEMA rated enclosure for 50 amp service, Insulated skirting, R11 or greater to be supplied along the building that will match building siding and will cover the underside of the building and span to grade. An access door is to be supplied on the skirting large enough to access the underbelly of the building. Building interior shall include the following: Kitchen to include 18 CF stainless steel refrigerator, full size gas range, space saver microwave, single bowl stainless steel drop-in sink, box-built cabinets with adjustable shelves, soft close dovetail drawers, 6-inch tile backsplash, and solid surface granite countertops (final finishes/colors to be determined at a later date, shall be selected from manufacturers standard selection), Full bathroom to include tile shower with glass door and shower road, china lavatory sink with metal faucets, 6-inch tile backsplash, elongated comfort height residential toilet, rainfall and handheld shower heads, and toilet paper holder and towel bar, 18k/24k fully electric split system unit for heating/cooling(one for master bedroom and one in living area, Interior walls and doors, sealed, 1.5 inch wood blinds throughout, 9-10 feet smooth finished ceiling, - inch drywall with - inch luan backer, - inch vinyl plank flooring throughout(stock colors) Solid wood trim and moldings throughout, Furniture package to include sectional sofa for living area, single and double bed base and mattress for bunk room, queen bed base and mattress for master bedroom, and 42 inch wall mounted TV with swivel mounts in living area and master bedroom, Ceiling fan in living room centered with LED lights, Built in 4 drawer dressers in each bedroom, USBC outlets in each room, Nightstands on each side of bed in master bedroom, on demand gas water heater, Standard manifold plumbing system, Standard electrical package sufficient to power building appliances ? 50 amp service required, Deluxe overhead LED can lighting. Fire Protection Requirements: Provide all materials and equipment to include sprinkler system, fire alarm system, and perform all labor required to install complete and operable fire protection and health/safety systems in compliance with the most current editions of UFC 3-600-01, UFC 4-021-01, NFPA 13R, NFPA 24, NFPA 70, NFPA 72, NFPA 101, NFPA 90A, NFPA 10, and the additional standards referenced there in. General Design and Analysis: Provide a complete set of plans and specifications for all aspects of the fire protection design: This project requires the design, review, and oversight services of an FPE and as such the contractor is required to provide those services either directly or through a subcontract. The FPE shall be involved in every aspect of the design, construction, and testing/commissioning as it relates to fire protection and life safety. This includes, but is not limited to, building code analysis, life safety code analysis, design of automatic fire alarm, detection and suppression systems, water supply analysis, a multi-discipline review of the entire project, construction inspections and witnessing of fire protection acceptance testing/commissioning. The contractor shall submit with proposal, a written copy of the FPE resume indicating education, professional registration, and work experience, along with a letter attesting to their compliance with the requirements of this section. The letter must include an imprint of their professional engineering stamp with signature. Fire Protection Engineer Qualifications: The fire protection engineer of record shall be a registered professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES), with a minimum of 5 years experience, dedicated to fire protection engineering that can be verified with documentation. Evidence of qualifications shall be provided to the Government. In the design plans, include a fire protection design analysis, life safety plans, a code compliance summary sheet, code compliance site plan, and preliminary hydraulic analysis in accordance UFC 3-600-01. Final Design: The FPE must review the complete 100 percent design drawings and specification submission (all disciplines) and document in writing that the design complies with this UFC and all applicable fire protection and life safety design criteria. The review must provide verification that all items listed in the design analysis are correctly shown on the drawings and in the specification and list any approved equivalencies or deviations from this UFC. This design compliance document must be submitted prior to construction and must bear the signature and professional seal of the FPE. Fire Alarm and Detection Systems: Design and install fire alarm and mass notification systems as required to meet the required codes and standards. The design and installation shall be in accordance with UFC 3-600-01, UFC 4-021-01; NFPA 72, NFPA 101, NFPA 90A, NFPA 13, UFGS 28 31 76, and the Fort Drum Utility Standard. These buildings are considered personnel housing and similar lodging facilities. The requirements of 4-37 and 4-43 of the fire protection UFC apply. The system shall be designed in accordance with the UFC and NFPA standards by personnel with the qualifications dictated in those standards and this statement of work. Submit prior to construction engineered and stamped construction plans and specifications for the fire alarm systems. Submit as a construction submittal the material and installation instructions for the suppression systems. All submittals for the fire detection and alarm system are for government review. The engineered and stamped construction plans and specifications will require a 15-business day review period versus the usual 10-day review. Incorporate the following paragraphs into the design and construction of the fire FA/MNS systems: The fire alarm and detection system shall be addressable. Fire alarm initiating devices, such as smoke detectors, heat detectors and manual pull stations shall be addressable. When the system is in alarm condition, the system shall annunciate the type and location of each alarm initiating device. Sprinkler water flow alarms shall be zoned by building and by floor. Supervisory alarm initiating devices, such as valve supervisory switches, fire pump running alarm, low-air pressure on dry sprinkler system, etc. shall be zoned by type and by room location.Install a new fire alarm and detection system including but not limited to a new control panel, annunciator, emergency lights, smoke detectors, heat detectors, carbon monoxide detectors, exit lights, audible and visual alarms, and gas detection/shut off. The fire alarm system will be an addressable, self-interrogation alarm/detection system with mass notification. Provide and install a non-proprietary fire alarm control panel such as Fire-Lite Alarms by Honeywell. Provide one panel to service all the buildings. Locate the panel in a temperature-controlled enclosure accessible from the outside of the buildings. Provide class A wiring. A new Monaco transmitter is required for these buildings. A single transmitter can be used for all the buildings and shall be located in a temperature controlled enclosure accessible from the exterior of the buildings. The installation uses Monaco BTX radio transmitter system and MNS. All signals shall be transmitted to the Fort Drum Fire Department fire alarm receiving station. The following applies to all fire alarm systems: Transmitter frequency will be 413.325 UHF. Co-ax cable shall be run from the transmitter to an antenna mounted on an outside wall with long radius conduits or pull boxes so the cable is not damaged. Locate antenna on an exterior wall adjacent to enclosure. Keep co-ax runs as short as possible. System shall be water tight. All alarm wiring shall be in conduit. Wiring from control panel to transmitter shall be 20 gauge. Fire alarm systems shall transmit a supervisory signal, alarm signal and general trouble signal. Manual fire alarm station shall require a key to reset. Testing: Testing of the fire alarm and mass notification systems shall be in accordance with the UFC and NFPA requirements. Government personnel shall witness the testing. Coordinate testing at least 10 business days prior to the testing. Upon successful completion of testing submit the test reports as a construction submittal. Submit as-builts and O and M manuals as post construction submittals. Fire Suppression: Design and install suppression system as required to meet the relevant codes and standards. The design and installation shall be in accordance with UFC 3-600-01, NFPA 13R, NFPA 101, NFPA 24, NFPA 90A, NFPA 72 and UFGS 21 13 17.00 10. The system shall be designed in accordance with the UFC and NFPA standards by personnel with the qualifications dictated in those standards and this statement of work. Submit as a preconstruction submittal engineered and stamped construction plans and specifications for the suppression systems. Submit as a construction submittal the material and installation instructions for the suppression systems. All submittals for the suppression systems are for government review. The engineered and stamped construction plans and specifications will require a 15-business day review period versus the usual 10-day review. Incorporate the following paragraphs into the design and construction of the fire suppression systems: Install a new water main and services for the buildings. Include a new locking post indicator valve (PIV). Items shall be installed in accordance with the requirements of NFPA 24. Ensure that the PIV is installed downstream of the hydrant but before the building. Protect the PIV with bollards. All Fire Department/hose connections shall be a 5 inch Storz type connection. Connections shall be angled downward 30 degrees and installed 3 to 4 feet above grade. Connections on fire hydrants are not required to be angled downward. Facilities requiring sprinkler protection must be provided with sprinkler systems that are designed using the Area/Density Method of NFPA 13, except the discharge requirements for non-storage occupancies must be in accordance with Table 9-3, unless otherwise specified in this UFC. Provide automatic wet-pipe sprinkler systems throughout the entirety of the buildings, complete in all respects and ready for operation including all test and drain lines, pressure gauges, hangers and supports, signs, and other standard appurtenances. All shutoff valves in the sprinkler, standpipe, and combined systems shall be approved, indicating type. Coordinate sprinkler head locations with the architectural reflected ceiling plans, lighting, and other ceiling items, and make minor modifications for suitability purposes. Sprinklers installed in the ceilings of finished areas shall be symmetrical in relation to ceiling system components and centered in the ceiling tile. Provide listed guards where sprinklers will be subject to mechanical damage. Provide and install new metal fire extinguisher cabinets and fire extinguishers IAW NFPA 10. Testing: Inspect and test all fire suppression system equipment and systems, fire pumps, fire alarm and detection systems and mass notification systems in accordance with the applicable NFPA standards. The fire protection engineer of record shall witness the final tests. The fire protection engineer of record shall certify that the equipment and systems are fully operational and meet the contract requirements. Two weeks prior to each final test, the contractor shall notify, in writing, the installation fire department and the installation public works representative of the test and invite them to witness the test Building Supports: Piers are to be constructed on the concrete pads to serve as building supports for the buildings. Piers are to consist of CMU blocks with I-beams to span the entirety of the building. Final layout and design will be per manufacturers recommendations. Contractor is to supply and install proper anchoring of the building to existing 6 inch reinforced concrete slab to resist lateral and uplift forces on the building. Stairs and Railing: Concrete stairs are to be supplied at the entrance of the building. Stairs to have min. 12 inch tread and have enough steps to accommodate rise in grade from parking lot area to building entryway. Stairs to accommodate a 6 feet x 6 feet flat landing area in front of the door. Concrete for stairs to be 4000 PSI minimum. Stairs to have minimum 12 inch aggregate subbase. Stairs to have a metal railing on each side, including encompassing the landing area. Railing to be aluminum with black finish. Water Distribution Systems: Tie into 1 inch HDPE SDR-11 existing stub out service supplied for each building in concrete pad. Water service piping going above grade and underneath the building is to have heat tape installed and be properly insulated so as to prevent freezing of the pipeline. Final connection point of water service to building plumbing is to be determined by the installing contractor. Sewer Systems: Tie into 3 inch existing stub out service supplied for each building in concrete pad. sewer service piping going above grade and underneath the building is to be properly insulated so as to prevent freezing of the pipeline. Final connection point of sewer service to building plumbing is to be determined by the installing contractor. Electrical: Tie into existing 50 amp electrical service with a 30 feet cord for a twist lock outlet.

More opportunities from Department Of Defense → W6QM Micc-Ft Drum

Same awarding agency

NAICS: 331210
New
Federal
STEEL MECHANICAL TUBING
Solicitation # W911S227U0059
Solicitation W911S227U0059 is a Request for Quotation issued by the Department of Defense, specifically the W6QM Micc-Ft Drum, for the procurement of new 4140 steel mechanical tubing. The requirement specifies a 7.0 inch outer diameter and 2.0 inch wall thickness per ASTM A519, with a total requirement of 100 feet per CLIN. Tubing must be provided in increments of 2 feet, with a minimum length of 2 feet and a maximum length of 10 feet. This acquisition is a Total Small Business Set-Aside under NAICS code 331210. The contract is posted as brand name or equal, and any offeror proposing an equal product must provide descriptive literature and detail any modifications made to meet the salient physical and functional characteristics. The award will be granted to the responsible offeror whose proposal is most advantageous to the government based on price and technical evaluations. Delivery is required within 30 days after receipt of order on an F.O.B. destination basis. Mandatory shipment documentation includes a Certificate of Conformance and Certified Material Test Reports. Additionally, materials from multiple heats or lots must be clearly identified and separately palletized by heat/lot number. Proposals must be submitted electronically via the PIEE Solicitation Module and must include a completed Attachment 1 regarding certifications and country of origin to avoid being rejected as nonresponsive.
Iron and Steel Pipe and Tube Manufacturing from Purchased Steel

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
10th CAB Unit Maintained Equipment Maintenance
Solicitation # W911S227QA007
Solicitation W911S227QA007 is a competitive 8(a) set-aside for a Firm-Fixed-Price contract to provide qualified labor, management, and supervision for the 10th Combat Aviation Brigade (10CAB) Unit Maintained Equipment (UME) program and Supply Support Activity (SSA) at Fort Drum, New York. The contractor is responsible for operating and managing equipment repair facilities across four designated motor pools, providing field-level maintenance, technical inspections, and both scheduled and unscheduled repairs to ensure equipment meets Army 10/20 Technical Manual standards. The scope of work includes the use of the GCSS-A LIS system for reporting and dispatch, with a performance metric requiring 98 percent of completed work to meet first-time government acceptance standards. The contract requires a designated Project Manager as key personnel who must be physically on-site and possess full corporate authority. Labor requirements are based on an estimated annual workload of 71,910 productive hours, utilizing various Service Contract Act labor categories including Heavy Equipment Mechanics and SSA Supply Technicians. Award will be based on the most advantageous offer, evaluating technical acceptance through experience and capability statements, price, and past performance via CPARS. The period of performance is 12 months starting December 14, 2026, with quotes due by November 5, 2026, via the PIEE Solicitation Module.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details
NAICS: 331210
New
Federal
8 inch eave beam, C purlin, Z purlin
Solicitation # W911S227U0054
Solicitation W911S227U0054 is a Request for Quotation issued by the Department of Defense, specifically the W6QM Micc-Ft Drum, for the procurement of 8-inch eave beams, C-purlins, and Z-purlins. This is a Total Small Business Set-Aside under NAICS code 331210. The required materials must be in new condition and meet specific technical requirements, including a 14-gauge metal thickness and a red iron or galvanized finish. All items must be delivered as a single shipment to MCCAP, with no partial orders permitted, and drivers must possess a valid real ID for site access. The preferred delivery window is within 30 days, and the contract is established as F.O.B. destination with net 30 payment terms. The government will award the contract to the responsible offeror providing the most advantageous proposal based on price and technical factors. This is a brand name or equal solicitation; those offering equal products must provide descriptive literature, brand and model identification, and details of any modifications made to meet the firm requirements. Submission of Attachment 1 regarding certifications and country of origin is mandatory for a responsive bid. All quotes must be submitted through the PIEE Solicitation module. The contract incorporates several regulatory clauses, including the Buy American Act, cybersecurity reporting requirements, and postaward small business program rerepresentation.
Iron and Steel Pipe and Tube Manufacturing from Purchased Steel

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS