Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TOS No. 21-024 - West Los Angeles Maintenance Yard Project - Limited Phase II Environmental Site Assessment

Closed
230293State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 19 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Los Angeles Bureau of Engineering is soliciting proposals from the top three pre-qualified firms—Converse Consultants, WSP USA, Inc., and Ninyo & Moore—for services related to the West Los Angeles Maintenance Yard Project. The contract involves preparing a health and safety plan, conducting geophysical investigations, performing environmental drilling with four borings, laboratory analytical testing, and producing a limited Phase II Environmental Site Assessment (ESA) report. Any subconsultants added to the contract must be registered with the City's RAMP system to comply with contract requirements. This solicitation, identified as TOS No. 21-024, is specifically designated for geotechnical and environmental engineering services under NAICS code 541620. The work will take place in Los Angeles, California, and responses to the solicitation are due by June 17, 2026. The point of contact for this opportunity is Easton Forcier from the Bureau of Engineering, who can be reached via the provided email. The contract aims to ensure thorough environmental assessment and safety planning essential for ongoing maintenance yard operations.

General Info

City of Los Angeles seeks proposals for environmental, geotechnical services at West LA Maintenance Yard.

Agency

California → Engineering Bureau, Public WorksView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Los Angeles, CA, USA

Set-Aside

NONE

Documents

(3)

Non-Collusion Affidavit for City of Los Angeles Proposal

PDFaffidavit

BIP Schedule B - Task Work Order List of Subconsultants

XLSschedule-b

TOS 21-024 West LA Maintenance Yard Project Limited Phase II ESA

PDFtask-order-solicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Bureau, Public Works
Contacts1 person available
OfficeN/A
Organization / Agency
California → Engineering Bureau, Public Works
View Agency Profile
Office AddressN/A
Contacts
Easton ForcierPoint of Contact

Full Description

Show more
The City of Los Angeles, Bureau of Engineering (BOE), is seeking a consultant to provide preparation of a health and safety plan, geophysical investigation, environmental drilling and sampling (4 borings), analytical laboratory testing, and preparation of a limited Phase II ESA report.*Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP.**This TOS is only applicable to the top three firms on the Pre-Qualified On-Call Geotechnical and Environmental Engineering Services Consultants List: Converse Consultants, WSP USA, Inc., Ninyo & Moore.

More opportunities from California → Engineering Bureau, Public Works

Same awarding agency

NAICS: 237310
New
SLED
SIDEWALK REPAIR PROGRAM PACKAGE NO. 89 (LA 28)
Solicitation # E1909538
The Sidewalk Repair Program Package No. 89 (W.O. E1909538) is a Design-Bid-Build construction project managed by the City of Los Angeles Engineering Bureau, Public Works. The primary objective is to remediate pedestrian facilities at six LA28 Program Access Improvements sites to ensure full compliance with current Americans with Disabilities Act (ADA) standards. The comprehensive scope of work includes the replacement of sidewalks, driveways, curbs, and gutters, as well as asphalt concrete patch repairs, tree canopy trimming, root pruning, and landscape restoration. Additionally, the project requires remodeling catch basin lids, adjusting utility boxes and vaults to grade, and the removal and reinstallation of water meters. To be eligible for the award, bidders must possess a valid State of California Contractor's License Classification of A at the time of the bid. The contract utilizes the City's Local Business Preference Program for bid evaluation, offering significant bid reductions for certified entities. Local Business Enterprises (LBE) receive a 6% reduction, while City Business Enterprises (CBE) receive a 10% reduction, with both eligible for additional 2% reductions for Local Small Business (LSB) or Local Transitional Employer (LTE) certifications, up to a maximum of 12%. Non-LBE/CBE bidders may receive up to a 5% reduction based on the percentage of work performed by qualified subcontractors. All official bid documents and submissions are managed through the Regional Alliance Marketplace for Procurement (RAMPLA).
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS