Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arkansas was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Town Branch Basin Sewer Improvements - Alignment 3 (TB-40.1)

Closed
IFB-26-43State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Key electrical deliverables include new SCE electrical services and the installation of a standby generator. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids and proposals are due by October 29, 2025, at 2:00 PM. Primary contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 3 hours

AI Contract Overview

Show more

The City of Bentonville is soliciting bids for the Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1), a construction project focused on upgrading approximately 1,600 linear feet of gravity sewer with 24-inch diameter ductile iron and PVC mains and installing approximately 501 linear feet of 36-inch steel encasement via multiple auger bores at key crossings. The work is divided into two distinct work zones, involving upsizing the existing sewer, replacing appurtenances, and all associated tasks necessary to deliver a fully operational system for the City’s Water Utilities Department. The project requires strict compliance with CSI MasterFormat™, ASTM, and Corps of Engineers standards, with all work performed in coordination with existing infrastructure and other contractors. Performance is governed by the EJCDC C-700 contract template, not federal FAR clauses, with responsibilities clearly defined for inspections, quality control, substitutions, and corrections under Article-based provisions. Bids are due June 4, 2026, and will be evaluated using a Lowest Price Technically Acceptable (LPTA) methodology, where the lowest responsive and responsible bidder will be selected without trade-offs. The contract requires full compliance with technical submittals in PDF, DWG, DOC, EXC, and DB formats through Procore, with payment applications processed via the same platform. The project is located in Bentonville, Arkansas, with substantial completion required within 105 days for Zone 1 and 140 days for Zone 2, and final completion within 170 days of commencement. Bidders must submit detailed qualifications, financial statements, safety certifications, and diverse business documentation if applicable, along with bonded bids and insurance certificates naming the City and Engineer as additional insureds. No contract value is specified in the solicitation due to incomplete pricing data, and no federal accounting, invoicing, or payment office details are provided; instead, the City administers the contract through its local procurement framework. All materials must be protected during transport and storage using manufacturer guidelines, with labeling requirements mandating agency-approved identification and legibility throughout the project lifecycle, while prohibiting manufacturer logos on public surfaces.

General Info

Bentonville seeks bids for 1,600 ft sewer upgrade with auger bores, LPTA selection, 105–170 day completion, Procore submittals, bonded bids due June 4, 2026.

Agency

Arkansas → City of Bentonville

Place of Performance

AR, USA

Set-Aside

NONE

Documents

3

PIIP26-0001 Town Branch Basin Sewer Improvements Alignment 3 Bid Tab

XLSX, High priority: read this firstbid-tab
High

Town Branch Basin Sewer Improvements - Alignment 3 (TB-40.1) Specifications and Bid Documents

PDF, High priority: read this firstspecifications
High

2026-05-08 TOWN BRANCH BASIN SEWER IMPROVEMENTS - ALIGNMENT 3 (TB-40.1) - PLANS.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArkansas → City of Bentonville
Contacts1 person available
OfficeAR, USA
Organization / Agency
Arkansas → City of Bentonville
Office AddressAR, USA
Contacts

Full Description

Show more
The project includes the following work: The work generally includes the installation of approximately 1,600 linear feet of gravity sewer, consisting primarily of 24 ‑ inch diameter ductile iron and PVC sewer main and approximately 501 linear feet of 36 ‑ inch steel encasement installed via multiple auger bores at select crossings. The construction of this interceptor improvement project is divided into two separate Work Zones and includes upsizing the existing gravity sewer, replacing associated appurtenances, and all other related work. All work shall be performed as required by the Contract Documents for a complete and operational system, for the City of Bentonville Water Utilities Department.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS