Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on August 8, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tractor Trailer Headache Rack

Closed
FA4626-14-RFI-0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
Federal
35K lb. Base Capacity 4-wheel Sit-Down AC Electric Lift Truck, including Options, Battery, Charger, and Freight
Solicitation # W911S227U0101
Solicitation W911S227U0101 is a total small business set-aside for the procurement of one new, heavy-capacity, four-wheel sit-down AC electric lift truck with a base capacity of 35,000 pounds. The equipment must be current production and is intended for indoor industrial material-handling operations at the McAlester Army Ammunition Plant in Oklahoma. Key technical requirements include a rated lifting capacity of at least 28,700 pounds at a 24-inch load center, a maximum fork height of 103.5 inches, and a 72-volt electrical system or better. The forklift must be delivered fully assembled and include a compatible battery, charger, and all necessary accessories. The contract is awarded on a fixed-price basis to the responsible offeror whose proposal is most advantageous to the government, evaluating both price and technical compliance. Delivery is required on an FOB Destination basis no later than September 30, 2027, with a preferred delivery window of 30 days. The award includes a minimum 12-month or 2,000-hour general warranty and a 36-month or 6,000-hour powertrain warranty. The successful contractor must also provide on-site operator orientation and furnish comprehensive electronic and hard-copy manuals. All quotes must be submitted via the PIEE Solicitation module and include a completed certification of country of origin.
W6QM Micc-Ft Drum

POSTED

about 13 hours ago

DEADLINE

in 10 days

General Info

NAICS

333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing

Place of Performance

MALMSTROM AFB, MT, 59402, USA

Set-Aside

NONE

Documents

1
DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4626 341 Cons Lgc
Contacts2 people available
OfficeMALMSTROM AFB, MT, 59402-6863, USA
Office AddressMALMSTROM AFB, MT, 59402-6863, USA
Contacts
George M. McGrawContract Administrator
Alexander E. SmithContracting Officer

Full Description

Show more
THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSAL OR QUOTE. This Request for Information (RFI) is issued solely for information and planning purposes and does not constitute a solicitation. Responses to this RFI will not be returned. Not responding to this sources sought does not preclude participation in any future and potential solicitation. It is the intent of the Contracting Office to use this for market research purposes only. If a formal solicitation is released, it will be via the Federal Business Opportunities (http://www.fbo.gov). The Government shall not reimburse the costs of preparing responses to this request for information. Description: 3 EACH: 3-Door Enclosed Headache Rack with Diamond Plate Doors 3 Each: 19 Inch U-Bolt Mounting Kit for Headache Rack CAPABILITIES STATEMENT Interested parties must submit a Capabilities Statement, with brief and concise information, yet clearly demonstrating ability to meet the stated requirements. The Capabilities Statement should clearly present evidence that the interested party feels is relevant. Fill out and include the attached Capabilities Statement Cover Sheet. POINT OF CONTACT: George McGraw @ +1 (555) 000-0000, contact@example.gov. Submit Capabilities Statements (email preferred) by 12:00 pm 08/15/2014. If faxing capabilities statements, please email to verify receipt. FAX +1 (555) 000-0000 Please see the attachment

More opportunities from Department Of Defense → FA4626 341 Cons Lgc

Same awarding agency

NAICS: 236220
Federal
Vertical Construction Multiple Award Contract (MAC)
Solicitation # FA4626-26-R-0007
The Vertical Construction Multiple Award Contract (MAC) is an indefinite-delivery indefinite-quantity (IDIQ) vehicle established by the 341st Contracting Squadron to provide design-bid-build and design-build services for military renovation and construction projects. The scope primarily supports Malmstrom Air Force Base, including its Launch Facilities, Missile Alert Facilities, and Weapons Storage Area in Montana. Work includes the repair, renovation, alteration, and demolition of vertical structures and critical building systems such as HVAC, plumbing, electrical, and fire suppression. The contract is a total small business set-aside under NAICS code 236220, with an estimated overall ceiling of 99,999,999.99 and an aggregate capacity not exceeding 50,000,000. The government intends to award approximately eight contracts with individual task order values ranging from 2,000 to 3,000,000. The contract structure consists of a five-year initial ordering period with a two-year option, allowing for a total potential duration of seven years. An initial seed project is planned for the DSN/CSN Repair Bldg. 1082 HVAC project at Malmstrom AFB, which involves developing conceptual courses of action for backup cooling and humidification, progressing to a 100 percent Type B design. The seed project has a performance period of 242 calendar days from the notice to proceed, with construction beginning after the acceptance of the 65 percent design. Inspection and acceptance will be conducted by the government at the destination sites within Montana.
Commercial and Institutional Building Construction

POSTED

2 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS