Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - Cargo Building 626.1 - TP 0015 - Waterproofing, VIMS

Closed
11918.66 - TP-0015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 17 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

Clark Construction has been awarded the contract to design and build a new core-and-shell cargo building at San Francisco International Airport, replacing aging infrastructure in the West Field Area. The project involves constructing a two-story cargo warehouse with a leasable office mezzanine, including features such as 28 truck docks, future expansion docks, structural provisions for material handling systems, and accessible parking and office spaces. The building’s exterior features insulated metal panels, glass, translucent polycarbonate, and durable concrete bases, with two elevators serving the facility. Prior to occupancy, demolition of an existing building and relocation of infrastructure will be completed. This development is part of a broader initiative to create a consolidated cargo and office campus, which also includes additional cargo buildings, parking structures, and a new hotel. A key component of the project is the waterproofing and vapor barrier work, designated as Trade Package No. TP-0015, with a bid deadline of October 29, 2025. This package covers the fabrication and installation of below-grade waterproofing, vapor barriers, and exterior silicone coatings, with a participation requirement of at least 5% for local small, disadvantaged, or emerging small businesses. The scope emphasizes below-grade waterproofing, and interested contractors can find more details through the provided online link or by contacting Nicolette Madonna. The overall contract size is estimated between five and fifteen million dollars, with the project managed by SFO Construction under the California agency, aiming to enhance the airport’s cargo infrastructure and operational capacity.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → SFO Construction
Office AddressN/A
Contacts

Full Description

Show more
Design-Builder Firm Name: Clark ConstructionProject Overview:The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is primarily insulated metal panel with glass and translucent polycarbonate with a durable concrete base. The office facade is primarily glass and metal panel with a glass and concrete base. The project is served by two elevators per phase. Prior to occupancy, demolition of building 624 and relocation of some existing infrastructure such as an existing vault and pad-mounted equipment will be performed.The 626 Cargo Building is part of the larger West Field Area which includes multiple cargo buildings, parking garages, additional office space and a new hotel. The West Field is collectively being re-planned to establish a new consolidated office campus and cargo district at SFO. Trade Package No.: TP-0015Trade Package Title: Waterproofing, VIMSDescription of the Trade Package Scope of Work: Scope of work includes fabrication and installation of all below grade waterproofing, vapor barrier, and exterior silicone coatingTrade Package Bid Due Date and Time: 10/29/2025 at 2:00 pmCMD LBE Participation Requirement %: 5%Main Trades of the Trade Package: Below Grade WaterproofingBest contact for Trade Package information (Name and Email): Nicolette Madonna, contact@example.gov web link to the Trade Package or more information: https://app.buildingconnected.com/public/5579ca47675b720a008b2c5a

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS