Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on December 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - Cargo Building 626.1 - TP 0021 - Miscellaneous Metals

Closed
11918.66 -TP-0021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332322
New
seeking Small Businesses to supply products and services in support of our USAF Noise Suppressor Sustainment Contract
Solicitation # seeking-small-businesses-supply-products-services-support-our-usaf-noise-suppressor-sustainment
Vital Link Inc. is seeking small businesses across all socioeconomic categories to serve as subcontractors providing products and services in support of the USAF Noise Suppressor Sustainment Contract. The scope of work involves a wide array of industrial supplies and onsite services, including raw materials such as stainless and carbon steel, hardware, bearings, and machined aircraft parts. Additionally, the company is looking for suppliers of specialized materials like insulation, sealants, and paint, as well as electrical and mechanical components including PLC electronics, motors, and gearboxes. Infrastructure support services such as onsite concrete work, structural steel, and exterior sheeting are also required. Interested small businesses should align with relevant NAICS codes, including 332322 for sheet metal work, as well as 335999, 238320, 325520, 332722, and 332999. For those providing freight, crating, and packaging, the nonmanufacturer rule applies, deeming businesses small if they have fewer than 500 employees. The response deadline for this solicitation is December 31, 2026. Primary points of contact for further information include Ashley Barry, Ashley Aguilar, and A.C. Kujawa.
Vital Link Inc.

POSTED

about 1 hour ago

DEADLINE

in 2 months

AI Contract Overview

Show more

Clark Construction is the design-builder for a core-and-shell project involving a two-story cargo building at the airport, intended to replace aging cargo facilities. The building includes a cargo warehouse with two floors, 28 active truck docks plus 7 future docks, structural accommodations for material handling systems such as an elevating transfer vehicle, and associated leasable office mezzanine space. The office area incorporates light wells, two handicap accessible parking stalls, and is designed with substantial glazing and metal paneling for the facade, contrasting with the warehouse’s insulated metal panels and translucent polycarbonate features. The project also includes improvements to sidewalks and landscaping. The construction phase will require demolition of an existing building and relocation of certain infrastructure elements prior to occupancy. This cargo building is part of a larger redevelopment plan for the West Field Area, aiming to create a consolidated campus including multiple cargo buildings, office spaces, parking garages, and a hotel at the airport. The trade package labeled TP-0021 covers all miscellaneous metal work required for this project, including fabrication and installation of ironwork. Bids are due by January 8, 2026, with a mandate that 15% of the work participation comes from local business enterprises. The package will be managed by Clark Construction, with Chalino Gurrola as the primary contact. The building will be served by two elevators per construction phase, adding to the infrastructure supporting efficient cargo and office operations. The contract focuses specifically on the structural and metal components critical to the building’s core and shell, while the interior fit-out will be completed by future tenants. This package represents a key element in the phased development of the airport’s new cargo district.

General Info

Design-Builder Firm Name: Clark Construction Project Overview: The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is primarily insulated metal panel with glass and translucent polycarbonate with a durable concrete base. The office facade is primarily glass and metal panel with a glass and concrete base. The project is served by two elevators per phase. Prior to occupancy, demolition of building 624 and relocation of some existing infrastructure such as an existing vault and pad-mounted equipment will be performed. The 626 Cargo Building is part of the larger West Field Area which includes multiple cargo buildings, parking garages, additional office space and a new hotel. The West Field is collectively being re-planned to establish a new consolidated office campus and cargo district at SFO. Trade Package No.: TP-0021 Trade Package Title: Miscellaneous Metals Description of the Trade Package Scope of Work: Scope of work includes fabrication and install of all project miscellaneous metals. Trade Package Bid Due Date and Time: 1/8/2026 at 2:00 pm CMD LBE Participation Requirement %: 15% Main Trades of the Trade Package: Ironwork Best contact for Trade Package information (Name and Email): Chalino Gurrola, [email hidden] Design-Builder web link to the Trade Package or more information: https://app.buildingconnected.com/public/5579ca47675b720a008b2c5a

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Design-Builder
Contacts1 person available
OfficeSan Francisco, CA, 94128, USA
Organization / AgencyCalifornia → Design-Builder
Office AddressSan Francisco, CA, 94128, USA
Contacts
Tiffany Gonzalez-RuizProcurement Officer I

Full Description

Show more
Design-Builder Firm Name: Clark Construction Project Overview: The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is primarily insulated metal panel with glass and translucent polycarbonate with a durable concrete base. The office facade is primarily glass and metal panel with a glass and concrete base. The project is served by two elevators per phase. Prior to occupancy, demolition of building 624 and relocation of some existing infrastructure such as an existing vault and pad-mounted equipment will be performed. The 626 Cargo Building is part of the larger West Field Area which includes multiple cargo buildings, parking garages, additional office space and a new hotel. The West Field is collectively being re-planned to establish a new consolidated office campus and cargo district at SFO. Trade Package No.: TP-0021 Trade Package Title: Miscellaneous Metals Description of the Trade Package Scope of Work: Scope of work includes fabrication and install of all project miscellaneous metals. Trade Package Bid Due Date and Time: 1/8/2026 at 2:00 pm CMD LBE Participation Requirement %: 15% Main Trades of the Trade Package: Ironwork Best contact for Trade Package information (Name and Email): Chalino Gurrola, contact@example.gov Design-Builder web link to the Trade Package or more information: https://app.buildingconnected.com/public/5579ca47675b720a008b2c5a

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS