This Solicitation opportunity from California was posted on February 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - Cargo Building 626.1 - TP 0027 - Overhead Doors, Loading Dock Equipment

Closed
11918.66 -TP-0027State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Clark Construction has been contracted for a core-and-shell development of a two-story cargo building (Building 626.1) at the airport to replace aging cargo facilities. The project includes a cargo warehouse spanning two floors with 28 truck docks plus provisions for 7 future docks, office space featuring light wells and two handicap-accessible parking stalls, and enhanced sidewalk and landscaping elements. The warehouse exterior will be primarily insulated metal panels with glass and translucent polycarbonate, while the office facade will consist mainly of glass and metal panels. The building will be equipped with two elevators, and preparatory work includes demolition of an existing building (624) and relocation of infrastructure such as a vault and pad-mounted equipment. This cargo building is part of a broader redevelopment of the West Field Area, aimed at creating a consolidated office campus and cargo district at San Francisco International Airport (SFO). Trade Package No. TP-0027 covers the supply, furnishing, and installation of all overhead doors and loading dock equipment for the project. This package is open for bidding until March 20, 2026, with no Local Business Enterprise (LBE) participation requirement. The primary trade involved is overhead door installation. Key contacts for this package include Nicolette Madonna from Clark Construction and Tiffany Gonzalez-Ruiz from SFO procurement. The project involves coordination with multiple disciplines and serves as a critical component of the airport’s larger cargo and office expansion efforts.

General Info

Clark Construction to build two-story cargo warehouse with docks, offices, elevators, and landscaping at SFO.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Design-Builder
Contacts1 person available
OfficeSan Francisco, CA, 94128, USA
Organization / AgencyCalifornia → Design-Builder
Office AddressSan Francisco, CA, 94128, USA
Contacts
Tiffany Gonzalez-RuizProcurement Officer I

Full Description

Show more
Design-Builder Firm Name: Clark Construction Project Overview: The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is primarily insulated metal panel with glass and translucent polycarbonate with a durable concrete base. The office facade is primarily glass and metal panel with a glass and concrete base. The project is served by two elevators per phase. Prior to occupancy, demolition of building 624 and relocation of some existing infrastructure such as an existing vault and pad-mounted equipment will be performed. The 626 Cargo Building is part of the larger West Field Area which includes multiple cargo buildings, parking garages, additional office space and a new hotel. The West Field is collectively being re-planned to establish a new consolidated office campus and cargo district at SFO. Trade Package No.: TP-0027 Trade Package Title: Overhead Doors, Loading Dock Equipment Description of the Trade Package Scope of Work: Scope of work includes supply furnish and install of all project overhead doors and loading dock equipment. Trade Package Bid Due Date and Time: 3/20/2026 at 2:00 pm CMD LBE Participation Requirement %: 0% Main Trades of the Trade Package: Overhead door installation Best contact for Trade Package information (Name and Email): Nicolette Madonna, contact@example.gov Design-Builder web link to the Trade Package or more information: https://app.buildingconnected.com/public/5579ca47675b720a008b2c5a

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS