This Solicitation opportunity from California was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - Cargo Building 720.1 & GSE Building 742 Project - TP-03A1 - Foundations/Concrete

Closed
11984.66 - TP-03A1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Skanska USA Building has issued a contract for the construction of a new cargo facility at an airport in California, involving the demolition of an existing building. The project encompasses a single-story structure covering approximately 120,000 square feet, with about 95,000 square feet dedicated to cargo operations and 25,000 square feet allocated for mezzanine office space. Additionally, an ancillary Ground Service Equipment (GSE) Maintenance Facility of around 17,000 square feet will be constructed nearby but not physically connected to the main cargo building. The project also includes landside maneuvering space capable of accommodating approximately 30 trucks. A key component of the contract is the Foundations and Concrete Trade Package (TP-03A1), which involves prequalification for approximately 120,000 square feet of foundation and concrete work, including truck ramps, equipment pads, pile caps, slabs, walls, and grade beams. The estimated cost for this scope is approximately $14.7 million. Bidders must complete a qualification process prior to submitting their bids, with the deadline set for October 10, 2025. The project emphasizes diversity participation, requiring a 16% LBE (Limited Business Enterprise) involvement. Interested parties can contact Skanska via email for qualification details and must be approved before submitting bids. The contract is managed under the SFO Construction agency, with primary contact Tiffany Gonzalez-Ruiz available for further inquiries.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Rough/Finish Carpentry and Architectural CaseworkOpen now, due in 30 days
  • General Carpentry and Interior Renovation ServicesOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A

Full Description

Show more
Design-Builder Firm Name: Skanska USA BuildingProject Overview:This replacement 120,000 square feet, single-story cargo facility has been planned with approximately 95,000 square feet of cargo area, and 25,000 square feet of mezzanine office space along with landside maneuvering depth from West Field Road for approximately 30 trucks. The Project also has an ancillary Ground Service Equipment (GSE) Maintenance Facility (Building 742) of approximately 17,000 square feet on site, but not physically connected, to the cargo facility. In order to construct the new facilities, demolition of the existing Building 730 will be required.Trade Package No.: TP-03A1Trade Package Title: Foundations / ConcreteDescription of the Trade Package Scope of Work: PREQUALIFICATION ONLY (RFP AT LATER DATE): Approximately 120,000 SF of foundations / concrete work, including, but not limited to, truck ramps, equipment pads, pile caps, slab on grade, walls, grade beams, and structure excavation.Trade Package Bid Due Date and Time: By 4PM, 15 business days after posting. Estimated Cost: $14,700,000Main Trades of the Trade Package: Carpenters, Laborers, OperatorsCMD LBE Participation Requirement: 16%Design-Builder requirements or prequalification criteria: Qualification information and Building Connected invite will be made available within 1 business day of request to contact below. Bidders must complete qualifications and be approved prior to the Bid Due Date. Any bids received from unapproved bidders will not be considered.Contact for Trade Package information: Sign up to see this detail

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS