Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - SFO Recycled Water System Project - TP 4004 -Structural Steel, Canopy-AC, Misc. Metals (Pre-Qualification Only)

Closed
11431.66 - TP 4004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Walsh Construction Co. II, LLC has been contracted to design and build the Recycled Water Systems Project at the Mel Leong Treatment Plant, which involves creating an Advanced Water Treatment Plant (AWTP) capable of meeting Title 22 standards and removing PFAS contaminants from effluent. The project includes constructing a 250,000-gallon storage tank, pump station, and approximately three miles of pipeline to connect to airport facilities. Additionally, upgrades will be made to three existing Sequence Batch Reactors (SBR) and the construction of a new SBR to ensure permit compliance. This is a progressive Design-Build effort, with incremental trade work authorization, aiming to complete design, permitting, construction, activation, commissioning, and project closeout within the existing treatment plant infrastructure. The project also encompasses upgrades to the plant’s parallel treatment processes, including the Industrial Wastewater Treatment Plant and Sanitary Wastewater Treatment Plant, to handle various wastewater streams from airport operations. A specific trade package, TP-4004, focuses on structural steel, canopies, and miscellaneous metals, primarily involving the furnishing and installation of canopies, awnings, structural steel members, roof and decking systems, and associated supports and finishes for two masonry buildings within the AWTP. The scope includes providing all necessary embeds, anchor bolts, ladders, grating, and pipe supports, with a bid deadline of May 30, 2025. Pre-qualification is required for interested subcontractors, with Walsh seeking firms that meet specific criteria to participate in the bidding process. The project is valued between 50 and 100 million dollars, with primary contact through Tiffany Gonzalez-Ruiz at SFO Construction, California.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A

Full Description

Show more
Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250,000-gallon storage tank, pump station, and distribution system of roughly three miles of pipeline and connections to some of the Airport's facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No.: TP-4004Trade Package Title: Structural Steel, Canopy-AC, Misc. Metals (Pre-Qualification Only)Description of the Trade Package Scope of Work:Furnish and install canopy, awnings above doors and entrances, and structural steel members for roof and decking system. Roof and decking system will be installed on two separate masonry buildings within the Advanced Water Treatment Plant.Contractor shall provide all embeds and anchor bolts necessary to install structural steel systems including canopy bracing. Installation shall include HSS posts, welded and bolted beam connections, and metal deck for the roof system. Furnish steel finishes appropriate for water treatment plant environment.Misc. metal scope shall include furnish and install CAL OSHA compliant ladders and landings for roof access. As well as covers or grating for trenches including rebate embeds. Also include pipe supports outside of process building.Trade Package Bid Due Date and Time: 5/30/2025 by 2:00 PM PSTMain Trades of the Trade Package: Iron workersSBE Participation Requirement: 1.7%Design-Builder requirements or prequalification criteria: Walsh is seeking pre-qualification submissions only and firms that successfully meet the pre-qualification criteria for their applicable scope of work will be invited to submit a bid for the Trade Package. Vendors that do not submit the required pre-qualification information will not be allowed to submit a bid for the Trade Package. Please allow up to 2 weeks for Walsh to award the pre-qualified bidders.Contact for Trade Package information: Dominic C Fung, Sign up to see this detail web link to the Trade Package or more information: Please contact the email above if you are interested in pre-qualifying for this trade package. Walsh will share pre-qualification link to interested subcontractors via email and/or BuildingConnected.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS