Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - SFO Recycled Water System Project - TP 4006 -Doors (Pre-Qualification Only)

Closed
11431.66 - TP 4006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Recycled Water Systems Project at SFO involves designing and constructing an Advanced Water Treatment Plant (AWTP) to comply with Title 22 standards and effectively remove PFAS from wastewater effluent. The project includes building a 250,000-gallon storage tank, a pump station, and approximately three miles of pipeline to connect the new system with existing airport facilities. Additionally, upgrades will be made to three existing Sequence Batch Reactors (SBRs), and a new SBR will be constructed to ensure permit compliance. The project is a Progressive Design-Build effort, with trade work authorized incrementally by the airport, aiming to complete design, construction, permitting, activation, commissioning, and project closeout within the current Mel Leong Treatment Plant, which handles wastewater from various airport facilities. The current solicitation focuses on a pre-qualification process for the Doors trade package, designated as TP-4006. This scope involves furnishing and installing interior, exterior, and storefront doors, along with hardware and hollow metal door frames for process and control buildings. The bid deadline is set for May 30, 2025, and the main trade involved is carpentry. Walsh Construction is seeking pre-qualified firms that meet specific criteria to submit bids, with non-compliant vendors excluded from participation. Interested subcontractors must contact the designated project representative for pre-qualification details and will be provided with further instructions via email or the project portal. The contract size is substantial, estimated between $50 million and $150 million, emphasizing the project's scale and significance within the airport’s infrastructure upgrades.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A

Full Description

Show more
Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250,000-gallon storage tank, pump station, and distribution system of roughly three miles of pipeline and connections to some of the Airport's facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No.: TP-4006Trade Package Title: Doors (Pre-Qualification Only)Description of the Trade Package Scope of Work:Furnish and install interior doors, exterior doors, storefront doors and hardware for the process and control buildings. Furnish and install all hollow metal door frames.Trade Package Bid Due Date and Time: 5/30/2025 by 2:00 PM PSTMain Trades of the Trade Package: CarpentersSBE Participation Requirement: 0%Design-Builder requirements or prequalification criteria: Walsh is seeking pre-qualification submissions only and firms that successfully meet the pre-qualification criteria for their applicable scope of work will be invited to submit a bid for the Trade Package. Vendors that do not submit the required pre-qualification information will not be allowed to submit a bid for the Trade Package. Please allow up to 2 weeks for Walsh to award the pre-qualified bidders.Contact for Trade Package information: Dominic C Fung, Sign up to see this detail web link to the Trade Package or more information: Please contact the email above if you are interested in pre-qualifying for this trade package. Walsh will share pre-qualification link to interested subcontractors via email and/or BuildingConnected.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS