Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - SFO Recycled Water System Project - TP 4017 -Build Out and Interior Finishes

Closed
11431.66 - TP4017State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221310
New
Federal
Water Treatment Chemicals, Testing, Monitoring, and Reporting- Sources Sought Notice / Request for Information
Solicitation # 15B70027PR000089
The Federal Bureau of Prisons (FBOP) is conducting market research to establish a Blanket Purchase Agreement (BPA) for comprehensive water treatment chemicals, testing, monitoring, and reporting services for its correctional institutions nationwide. The scope includes the supply of treatment chemicals and the provision of technical support for steam and hot water boilers, chiller water loops, cooling towers, and domestic water systems. Key requirements include monthly testing and reporting for boiler and chiller systems, as well as quarterly domestic water testing for Legionella, E. coli, lead, arsenic, nitrates, and PFAS. The contractor must be capable of implementing treatment recommendations and delivering chemicals within 15 calendar days of test results. A critical component of the requirement is the maintenance of a secure, web-based online reporting portal that provides institution-level, regional, and central office access for tracking water quality dashboards, chemical usage, and compliance trends. All services and materials must adhere to a rigorous set of standards, including EPA, CDC, OSHA, NFPA, ASHRAE Standard 188, and various federal, state, and local codes. Deliveries to institutions must be made between 8:00 a.m. and 2:00 p.m., Monday through Friday. The government is seeking capable vendors who can manage large-scale, multi-site programs and maintain a valid SAM.gov status, with payments processed via Purchase Order or government credit card.
National Acquisitions - Co

POSTED

5 days ago

DEADLINE

in 16 days
NAICS: 221310
New
Federal
4610--FY27 Portable Reverse Osmosis (RO) Water Purification System
Solicitation # 36C24827Q0114
The Department of Veterans Affairs, Network Contracting Office 8, intends to award a sole-source, firm-fixed-price contract to Evoqua Water Technologies LLC for the procurement and installation of brand-name only EON portable reverse osmosis water purification systems. This requirement is specifically for eight EON Portable RO and ROVER ALX transport system kits to be installed on Government-owned EON rover carts at the Orlando VA Veterans Hospital. The scope of work includes the delivery, installation, and start-up of the kits, the provision of two spare carbon block filter cartridges per kit, and the delivery of onsite clinical and technical training and orientation. The contractor is responsible for providing all necessary labor, tools, materials, supervision, and transportation to complete the turnover to the Government. The contract falls under NAICS Code 221310, which has a small business size standard of 41 million dollars. Delivery is requested within 90 days after receipt of order. As this is a brand-name-only requirement based on the determination that only one responsible source can provide the specialized equipment, this notice serves as an intent to award rather than a solicitation for quotes. Interested parties wishing to challenge the sole-source determination must submit a capabilities statement providing clear and convincing evidence that competition is in the best interest of the Government to Susan Rodriguez-Perez by November 20, 2026.
248-NETWORK Contract Office 8 (36C248)

POSTED

5 days ago

DEADLINE

in 3 days

AI Contract Overview

Show more

Walsh Construction Co. II, LLC has been awarded a contract for the Recycled Water Systems Project at San Francisco International Airport, which involves designing and constructing an Advanced Water Treatment Plant (AWTP) to meet regulatory standards and remove PFAS from effluent. The project includes building a 250,000-gallon storage tank, pump station, and approximately three miles of pipeline, along with upgrades to existing treatment facilities to ensure permit compliance. This is a Progressive Design-Build effort, allowing incremental trade work authorization, with the overall goal of completing design, construction, permitting, activation, commissioning, and project closeout within the scope of existing treatment plants. The specific trade package, valued at approximately $400,000, focuses on Build Out and Interior Finishes, covering work inside the Electrical & Control Building, including painting, signage, lockers, joint sealant and fire stopping, casework, drywall, acoustic ceilings, metal framing, fire extinguishers, safety equipment, tiling, window treatments, and miscellaneous metals. Bidders must be pre-qualified to submit proposals, with a deadline of September 12, 2025. The contract emphasizes strict adherence to project specifications, quality standards, and organized procurement, storage, and installation processes, with a comprehensive closeout involving inspections, documentation, and punch list completion. The project aims to enhance water treatment capabilities at the airport, ensuring environmental compliance and operational efficiency.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Water Retail ServicesOpen now
  • Sector NOLA Water Treatment for HVACOpen now, due in 8 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A

Full Description

Show more
Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250,000-gallon storage tank, pump station, and distribution system of roughlythree miles of pipeline and connections to some of the Airport's facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No: TP-4017Trade Package Title: Build Out and Interior FinishesDescription of the Trade Package Scope of Work:1.1 SCOPE OF WORKSubcontractor shall provide all labor, materials, equipment, and supervision necessary to complete this scope of work in accordance with the construction drawings and technical specifications. Build out and interiorfinishes are applicable to the following spaces inside the Electrical & Control Building (912): Washing Room, Locker Room, Control Room, and Break Room.Subcontractor shall procure, manage, and coordinate the trades described below.PAINTING ON DRYWALLMobilization:Mobilize all necessary equipmentProcurement:Procure all coatings, paints, primers, and related materials.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Apply primers, coatings, paints, and any other necessary coatings per project drawings and specifications to the following items:o Gypsum BoardCloseout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.RESTROOM ACCESSORIESMobilization:Mobilize all necessary equipmentProcurement and Installations:Furnish and install all mirrors, toilet paper dispensers, paper towel dispensers, soap, grab bars, and any related materials.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Subcontractor responsible for Storing materials in a secure and organized manner at the jobsite to prevent damage and contamination.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.SIGNAGEMobilization:Mobilize all necessary equipmentProcurement:Procure all interior signage and related materialsEnsure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Furnish and install all permanent interior plastic and interior metal signage per project drawings and specifications including but not limited to:o Room identification panel signageo Hazard Signageo Safety Signageo Accessibility Signage (Access/Egress, ADA and General Parking)Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.LOCKERSMobilization:Mobilize all necessary equipmentProcurement:Procure all lockers and related equipmentEnsure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Install all HDPE lockers with curbs, and benches per project drawings and specificationsInclude anchors to floorCloseout: Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.JOINT SEALANT & FIRE STOPPINGMobilization:Mobilize all necessary equipment.Procurement:Procure all joint sealants and related materials.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Mockups:Build mockups to verify selections of materials per project specifications.Installation:Install joint sealants at interior joints in vertical surfaces and horizontal non-traffic surfaces (JS-3) per project drawings and specifications.Perform field quality control per project specifications.Perform caulking for door frames and drywall per detail 6, 8 on sheet A8.07 of the drawings.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.CASEWORKMobilization:Mobilize all necessary equipmentProcurement:Procure all casework, countertops, shelving, finishes, and any related materialsProcure all office furniture in accordance with the furniture schedules on the project drawings (A9.06) and more.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Furnish and install all casework and office furniture per project drawings and specifications (06 40 00)Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.DRYWALLMobilization:Mobilize all necessary equipmentProcurement:Procure all interior gypsum boards, insulation, tile backing panels, and any related materials.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Furnish and install all finishing panels, interior gypsum boards, tile backing panels, trim accessories, and any related materials per project drawings and specifications.Furnish and install cement particle boards with matching tape and groutSubcontractor responsible for sanding and any prep work of the drywallFurnish and install gypsum board ceilings, stud spacing to coordinate with access panels.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.ACOUSTIC CEILINGSMobilization:Mobilize all necessary equipment.Procurement:Procure all acoustical materials and related equipment.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Install acoustic panels, insulation, and metal suspension systems per project drawings and specifications.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.METAL FRAMINGMobilization:Mobilize all necessary equipment.Procurement:Procure all metals and related equipment.Subcontractor to coordinate with MEP trades.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Provide calculations if required by the Engineer of Record.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Install all metals and fasteners per project drawings and specifications.Furnish and install backing for bathroom accessories and wall mounted equipment and casework.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.FIRE EXTINGUISHERS & CABINETSMobilization:Mobilize all necessary equipment.Procurement:Procure all fire protection materials and related safety equipment.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Install fire extinguishers (2 in process building, 2 in control building, and 1 in blower building), mounting brackets, and fire-protection cabinets per project drawings and specifications.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues. SAFETY EQUIPMENTMobilization:Mobilize all necessary equipment.Procurement:Procure all fire protection materials and related equipment.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Furnish and install including but not limited to: fire blanket kits, first aid kits, and emergency repair kits per project drawings and specifications.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.TILINGMobilization:Mobilize all necessary equipment.Procurement:Procure all ceramic tiling materials and related equipment.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Install all tiling and crack isolation membranes per project drawings and specifications.Subcontractor responsible for waterproof membrane testing.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.WINDOW TREATMENTSMobilization:Mobilize all necessary equipment.Procurement:Procure all shades and related equipment.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Install shades and rollers per project drawings and specifications.Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.o Complete any punch list items and address any remaining issues.MISC METALSMobilization:Mobilize all necessary equipment.Procurement:Procure all bike racks and related equipment per drawing A1.00.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.Installation:Install all bike racks and any related miscellaneous metals per project drawings and specifications (Drawing A1.00)Closeout:Final Inspections:o Coordinate with Walsh for third party inspections.Documentation:o Provide as-built drawings and documentation.Complete any punch list items and address any remaining issuesTrade Package Bid Due Date and Time: 09/12/2025 @ 2:00PM PSTEstimated Cost: $400,000Main Trades of the Trade Package: Painting, Signage, Lockers, Joint Sealant & Fire Stopping, Casework, Drywall, Acoustic Ceilings, Metal Framing, Fire Extinguishers, Safety Equipment, Tiling, Window Treatments, and Misc MetalsSBE Participation Requirement: 15%Design-Builder requirements or prequalification criteria: Only pre-qualified bidders will be allowed to submit bids. If you did not previously pre-qualify during the pre-qualification timeframe, you will not be able to bid on this project.Contact for Trade Package information: Dominic C Fung, Sign up to see this detail web link to the Trade Package or more information: Please contact the email above if you were previously pre-qualified with Walsh and are interested in bidding for this trade package. Walsh will share the bid documents to pre-qualified subcontractors via email and/or BuildingConnected upon request.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS