Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - Terminal 3 West Modernization Project - TP 70 - West and C4C: Doors, Frames, and Hardware

Closed
10071.76 - TP 70State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
City of Santa Cruz Lifeguard Headquarters Repairs
Solicitation # RFQ No. SCFD-0334
The City of Santa Cruz is soliciting architectural services for the repair of the Lifeguard Headquarters located at 1 Municipal Wharf. The primary objective is to implement necessary repairs to ensure the facility is safe and operationally ready while the city conducts long-term planning for future use and expansion. The scope of work is divided into six key tasks: the preparation of 30 percent and 100 percent building permit plan sets and project specifications, the provision of construction cost estimates, bid support, construction support, and the delivery of final as-built drawings and annotated specifications. The selected architect must coordinate with multiple regulatory agencies, including the California Coastal Commission and NOAA, and ensure all designs comply with ADA standards and professional guidelines from organizations such as the AIA and ASCE. The selection process is qualifications-based, where an evaluation committee ranks the top three respondents based on expertise and experience without initial regard to fee, provided the final cost fits within the project budget. Proposals must be submitted by December 3, 2026, and include a main proposal with firm information, references from similar projects completed within the last five years, and a project schedule, with the fee proposal submitted in a separate sealed envelope. The contract is a Professional Services Agreement requiring compliance with California prevailing wage laws and equal employment opportunity regulations. Performance includes mandatory site visits to monitor quality and progress, culminating in a punch list and final certification of work.
Fire

POSTED

about 20 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves a comprehensive modernization effort at San Francisco International Airport's Terminal 3, specifically focusing on expanding and renovating the West section of the terminal. The project aims to add approximately 631,022 gross square feet and upgrade around 516,644 gross square feet of existing facilities, all while maintaining continuous terminal operations through extensive phased construction. Key improvements include upgrading building systems, seismic retrofitting, optimizing passenger flow, enhancing the overall passenger experience, and installing new gates to increase operational flexibility. A significant component of this modernization is the construction of the Courtyard 4 Connector, a new seven-story core-and-shell building that integrates into the broader Terminal 3 West project, continuing the renovation efforts initiated in other parts of Terminal 3. Within this scope, a specific trade package (Trade Package 70) focuses on the supply and installation of doors, frames, and hardware for the post-security areas of Terminal 3 West and the C4C building. The estimated cost for this package is approximately $3.9 million, with a bid deadline set for April 28, 2025. The project emphasizes participation from small, disadvantaged, and local businesses, requiring a minimum of 15% LBE (Local Business Enterprise) participation. Interested firms must meet prequalification criteria, which can be obtained by contacting Briana Padilla. The contract is managed by SFO Construction under the California agency, with primary contact Tiffany Gonzalez-Ruiz available for further inquiries.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • City of Santa Cruz Lifeguard Headquarters RepairsOpen now, due in 17 days
  • Architectural Design ServicesOpen now, due in 59 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A

Full Description

Show more
Design-Builder Firm Name: Turner Construction CompanyProject Overview:Terminal 3 West ModernizationThe goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.Courtyard 4 Connector The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. Trade Package No.: Trade Package 70Trade Package Title: West and C4C: Doors, Frames, and HardwareDescription of the Trade Package Scope of Work: Supply and install all doors, frames, and hardware for Terminal 3 West Post-Security and C4C. Trade Package Bid Due Date and Time: 04/28/25 by 5:00pmEstimated Cost: $3.9MMain Trades of the Trade Package: Supply and Install Doors, Frames, and Hardware CMD LBE Participation Requirement: 15%Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at Sign up to see this detail for SFO and Turner prequalification criteria for this package. Contact for Trade Package information: Briana Padilla email: Sign up to see this detail

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS