Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trade Package - Terminal 3 West Modernization - TP 92 - Ceramic Tile

Closed
10071.76 - TP 92State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332312
New
Federal
Steel and Other Metal Materials for the Marietta Repair Station: Stamford De-Watering Box Material PH 1
Solicitation # W9123727QA011
Solicitation W9123727QA011 is a firm-fixed price commercial supply contract issued by the US Army Corps of Engineers, Huntington District, for the procurement of various steel and metal materials to support the Stamford De-Watering Box project at the Marietta Repair Station in Ohio. This procurement is a 100 percent small business set-aside under NAICS code 332312. The required materials include a wide array of ASTM standard products, specifically ASTM 1018 CR round bars, ASTM A434 CL bc, ASTM A53 seamless pipe, ASTM 1026 seamless tubing, ASTM A36 plates and bars, ASTM A709 Gr 50 plates, T-beams, and flat bars, as well as ASTM A325 fasteners. Specialized fabrication is required for certain ASTM 709 Gr 50 plates, including 1/8 inch tolerances and 45-degree double bevels as specified in the technical drawings. The selected vendor is responsible for arranging shipping to the Marietta Repair Station, with the government handling the unloading of materials upon arrival. All deliveries must be completed within eight weeks of the award date and must be accompanied by traceable mill certifications and testing reports. To be eligible for award, firms must be registered in the System for Award Management and comply with DFARS clauses 252.225-7001 and 252.225-7002 regarding the Buy American and Balance of Payments Program and Qualifying Country Sources as Subcontractors. The contract will be awarded using simplified acquisition procedures, and final invoicing is to be submitted via email once all materials are delivered onsite.
W072 Endist Huntington

POSTED

about 18 hours ago

DEADLINE

in about 14 hours

AI Contract Overview

Show more

The contract involves a comprehensive modernization of Terminal 3 West at San Francisco International Airport, undertaken by Turner Construction Company. The project aims to significantly expand the terminal by approximately 631,022 square feet and renovate around 516,644 square feet of existing space, all while maintaining continuous airport operations. Key aspects include upgrading building systems, seismic retrofitting, improving passenger flow, and adding new gates to enhance flexibility and passenger experience. The project also features the construction of the Courtyard 4 Connector, a new seven-story core-and-shell building, which is part of the broader Terminal 3 West modernization effort, continuing the enhancements initiated in previous terminal projects. Within this scope, a specific trade package has been identified for the supply and installation of ceramic tile systems across various areas of the terminal, including pre-security, post-security, and the new C4C area. The scope encompasses substrate preparation, installation of mortars, adhesives, grout, and expansion joints, as well as trims, mockups, and final cleaning. The selected contractor will be responsible for supervision, coordination with other trades, LEED documentation, safety measures, and timely deliveries. The bid deadline for this package is November 7, 2025, with an estimated cost of approximately $5.3 million. Interested parties are advised to contact Briana Padilla for prequalification criteria and further details.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → SFO Construction
Office AddressN/A
Contacts

Full Description

Show more
Design-Builder Firm Name: Turner Construction CompanyProject Overview:Terminal 3 West ModernizationThe goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.Courtyard 4 Connector The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects. Trade Package No.: TP-92Trade Package Title: Ceramic TileDescription of the Trade Package Scope of Work: Turner seeks a single trade partner to furnish and install complete ceramic tile systems for floors and walls in pre-security, post-security, and C4C areas of the Terminal 3 West Modernization project. Scope includes substrate prep; mortars/adhesives; grout; movement/expansion joints; trims/edge protection; shop/layout drawings and mockups; protection and final cleaning; procurement of attic stock; and just-in-time deliveries with contractor offloading/hoisting. The contractor is expected to provide supervision, layout/survey, LEED v4.1/CALGreen documentation, coordination with adjacent trades, and safety controls for adhesive application, including unplanned out-of-sequence/leave-out areas across the various locations of the project.Trade Package Bid Due Date and Time: 11/07/25 by 5:00 pm Estimated Cost: $5.3MMain Trades of the Trade Package: Ceramic Tile Furnish and InstallDesign-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at contact@example.gov for SFO and Turner prequalification criteria for this package.Contact for Trade Package information: Briana Padilla contact@example.gov 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS