Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Traffic Control & Maintenance of Traffic (MOT) Provider

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 25-SQ-67SR.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Professional Construction, Engineering and Inspection Services for the Ponce Inlet Mobility for the County of Volusia, Florida

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 42 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 7 documents on the prime contractFrom Professional Construction, Engineering and Inspection Services for the Ponce Inlet Mobility for the County of Volusia, Florida
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Engineering & Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides traffic control and safety barriers for prime contractors on County of Volusia projects. Installs and maintains traffic control devices, 6,000 LF of sediment barriers, and 28 inlet protection systems. Adheres to the Manual on Uniform Traffic Control Devices (MUTCD) and FDOT standards. Delivers safe traffic flow and environmental sediment control during construction.

Similar Contracts

Same NAICS industry code

More opportunities from Florida → Engineering & Construction

Same awarding agency

NAICS: 541330
New
SLED
Professional Construction, Engineering and Inspection Services for the Ponce Inlet Mobility for the County of Volusia, Florida
Solicitation # 25-SQ-67SR
The County of Volusia is soliciting professional Construction Engineering and Inspection (CEI) services for the Ponce Inlet Mobility project in the Town of Ponce Inlet, Florida. The scope of work focuses on safety improvements along a 3.1-mile stretch of S. Peninsula Drive, primarily involving the replacement of sub-standard sidewalks with new 8-foot concrete sidewalks, the installation of curb ramps and marked crosswalks, and the re-grading of driveways to meet ADA cross slope standards. The selected CEI Consultant will serve as an extension of County staff, coordinating with the Engineer of Record, the Florida Department of Transportation (FDOT), and the County Construction Administrator to administer the construction contract. The procurement process utilizes a two-phase evaluation. Phase one focuses on staff and technical expertise, while short-listed firms are evaluated in phase two based on their project approach, the quality of presented information, and their strategies for mitigating project challenges. The contract is subject to Federal-Aid funds, requiring compliance with FDOT/FHWA standards, the FDOT Local Agency Program, and the use of the U.S. Department of Homeland Security’s E-Verify system. All work must be performed under the supervision of a Florida-registered Professional Surveyor and Mapper. There is no specific set-aside status for this solicitation.
Engineering Services

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
SLED
Beresford Ave Extension Phase 2B: S Kepler Rd/ Dr MLK Beltway to SR 44
Solicitation # 27-B-17JD
The Beresford Avenue Extension Phase 2B project, under solicitation 27-B-17JD (Contract C2103), involves the construction of Beresford Avenue from S. Kepler Road/DR. MLK Beltway to SR 44 in Volusia County, Florida. The scope includes extending the roadway from approximately 1,100 feet east of Kepler Road to the intersection of SR 44 and Summit Avenue, along with the realignment of 1,600 feet of Summit Avenue. The design features two 11-foot travel lanes in each direction, 6-foot paved shoulders, roadside ditches, drainage structures, and a 12-foot concrete trail on the south side. The estimated construction cost is $4,911,975.00, and the contract will be awarded to the single lowest responsive and responsible respondent. Key technical requirements include the use of thermoplastic for all striping and pavement markings, adherence to FDOT 2025-2026 Standard Plans, and compliance with the 2023 Florida Green Book. The project has already undergone environmental screenings, with a Gopher Tortoise survey and USFWS Scrub Jay concurrence confirming no protected species or habitats are present on-site. Contractors must meet stringent insurance requirements, including Commercial General Liability with a $1M occurrence and $5M aggregate limit, and provide a bid bond of at least 5% of the bid amount. Performance is subject to liquidated damages of $2,529.00 per day for delays. Payments are processed within 30 days of receipt of an undisputed invoice, contingent upon the submission of a County-provided affidavit.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

in 11 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS