Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Control Plan Implementation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract outlines the full implementation of a temporary traffic control plan requiring comprehensive measures to ensure safety and compliance during all phases of work. This includes the strategic placement of signage, cones, flaggers, and controlled lane closures to manage vehicular and pedestrian movement effectively. The scope is designed to be fully executed as work progresses, with no phase exempt from adherence to established traffic control protocols. The subcontract is categorized under NAICS code 561320, indicating it pertains to support activities for truck transportation and related services. It was posted on April 29, 2026, with a response deadline of May 21, 2026, and is being managed by the California Public Works agency. The work is scheduled to take place within California, though specific city or zip details are not provided. Interested parties must respond before the deadline to be considered for award.

General Info

Implement temporary traffic control with signage, flaggers, and lane closures for safe, efficient flow.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 40170.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Rancho Cordova Surface Treatment Project - South White Rock and Stone Creek

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DYS03CES - Teacher Staffing Services for Educational Teachers in SEIS and DYS SettingOpen now, due in 21 days
  • Dental HygienistsOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full implementation of temporary traffic control including signage, cones, flaggers, and lane closures during all work phases.

More opportunities from California → Public Works

Same awarding agency

New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
West Linda Multi-Use Basin Phase II Project
Solicitation # 3260070
The West Linda Multi-Use Basin Phase II Project (Contract No. 3260070) is a general construction solicitation issued by the Yuba County Public Works agency in California. With an estimated cost of $1,121,293.00, the project involves infrastructure improvements at the West Linda Detention Basin, including the construction of parking lot improvements, a multi-use path, a ramp to the basin, workout and bench areas, storm drains, and landscape enhancements. The work must be performed in accordance with 2025 Caltrans Standard Plans and Yuba County Improvement Standards. The project timeline is divided into three milestones: general work must be completed within 60 working days, plant establishment within 90 working days, and total project completion within 150 working days. Bids are due by 2:00 p.m. on November 19, 2026, and will be awarded to the lowest responsive and responsible bidder. Submissions must be sealed and include a bid bond or cashier's check for 10 percent of the total bid price. The successful contractor is required to provide separate performance and payment bonds, maintain insurance for the contract duration plus five years, and adhere to prevailing wage laws. Key compliance requirements include a Quality Assurance Program for material testing, a Worker Environmental Awareness Program for tribal cultural resources, and strict adherence to environmental commitments regarding dust control and biological protections. There is no DBE goal for this project, and no pre-bid meeting is scheduled.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
SLED
Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1
Solicitation # 80121
The City of Rancho Cordova Public Works Department is soliciting competitive bids for the Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1. This project involves furnishing all labor, materials, and equipment for pedestrian improvements, specifically the construction of sidewalks and driveways across numerous designated streets within the Lincoln Village neighborhood. Key deliverables include the creation of progress schedules, Traffic Control Plans, and Erosion and Sediment Control Plans. The contractor is required to adhere to the Americans with Disabilities Act (ADA) Title 24 and City of Rancho Cordova standards, and must provide permanent stamped concrete storm drain messages stating No Dumping – Flows to Creek. The contract must be completed within 145 working days, with work commencing only after a Notice to Proceed is issued. Award selection is based on the lowest responsive and responsible bidder. Bidders must provide a bid security of at least 10 percent of the aggregate bid sum, and the successful contractor must execute Material and Labor Payment and Performance Bonds for 100 percent of the contract price. Compliance requirements include adhering to California Department of Industrial Relations prevailing wage determinations, the Copeland Act, and Equal Employment Opportunity programs. Bids are due by December 10, 2026, and must be submitted using the official Public Works Department proposal forms.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 24 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS