Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Traffic Control

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with Filanc focuses on providing comprehensive traffic management and safety controls for prime contractors working on Fallbrook Public Utility District projects. The scope of work includes the deployment of signage, cones, and flaggers, as well as the implementation of traffic diversion plans to ensure continuous road access during pipeline installation. The primary objective is to maintain safe traffic flow and secure the site perimeter. The solicitation was posted on September 6, 2026, with a response deadline of September 29, 2026. This opportunity is designated for various small business set-asides, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, and Veteran-Owned Small Businesses, falling under NAICS code 561990.

General Info

Filanc seeks traffic management and safety controls for Fallbrook Public Utility District projects.

Agency

NAICS

561990 - All Other Support ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

SBA

Documents

This scope was carved out of 3274.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Gum Tree and Knoll Park Pipeline Replacement; Project No. 3274

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFilanc
ContactsNo contacts available
OfficeN/A
Organization / Agency
Filanc
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides traffic management and safety controls for prime contractors on Fallbrook Public Utility District projects. Deploys signage, cones, flaggers, and traffic diversion plans to maintain road access during pipeline installation. Delivers safe traffic flow and site perimeter security.

Similar Contracts

Same NAICS industry code

NAICS: 561990
New
Federal
R--JEFF - Utility Mapping
Solicitation # 140P6226Q0007
The National Park Service is seeking quotes for a firm-fixed-price contract to perform non-invasive subsurface utility locating and mapping of irrigation systems and utility lines across approximately 45 acres of landscaped and turf areas at Gateway Arch National Park. The primary objective is to create a general reference for park maintenance staff to diagnose irrigation failures and identify utility locations. Deliverables include non-survey-grade digital and paper maps, with a preference for GIS ESRI file geodatabase format projected to UTM Zone 15, NAD83 (2011). The contractor must utilize industry-standard methods such as Ground-Penetrating Radar and Electromagnetic locating equipment. This procurement is a total small business set-aside under NAICS 561990. Performance is expected to occur within 60 to 90 days of award, and the contractor is provided a one-year workmanship warranty following project acceptance. Key operational restrictions include a prohibition on using UTVs or vehicles off paved surfaces and a general ban on drones unless a specific exception is granted and the pilot is FAA certified. Marking paint is permitted but must be limited and avoided on improved surfaces. Quotes must be submitted on company letterhead via email to the contracting officer by September 10, 2026, and must include the offeror's SAM UEI and completed FAR 52.212-3 representations. Award will be based on the most advantageous combination of price and technical factors.
Mwr Missouri MABO(62000)

POSTED

1 day ago

DEADLINE

in 4 days
View Details

More opportunities from Filanc

Same awarding agency

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Water and Sewer Line and Related Structures Construction

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details