Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Traffic Signal & Electronic Safety Installation (RRFB)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of Rectangular Rapid Flashing Beacons and related electrical components for prime contractors working on City of El Centro Department of Public Works projects. The primary objective is to enhance pedestrian safety by installing flashing beacons at designated intersections in El Centro, California, ensuring all work adheres to the electrical standards set by the City of El Centro and Caltrans. The project requires the delivery of a fully operational RRFB system under NAICS code 238210. Interested parties must submit their responses by October 1, 2026, for this opportunity posted by the City of El Centro.

General Info

Subcontract for installing pedestrian flashing beacons in El Centro, California, by October 1, 2026.

Agency

California → City of El CentroView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

El Centro, CA, 92243, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260922003.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ATP Cycle 6 Improvements Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of El Centro
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of El Centro
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs Rectangular Rapid Flashing Beacons (RRFB) and associated electrical components for prime contractors on City of El Centro Department of Public Works projects. Installs flashing beacons at designated intersections to improve pedestrian safety per City of El Centro and Caltrans electrical standards. Delivers an operational RRFB system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing emergency power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture, and secured to existing concrete slabs using Grade 5 or higher galvanized anchor bolts. The project also includes the installation of two new NEMA 3R automatic transfer switches, integration with existing fuel and electrical systems, and the performance of load bank testing for both units. The work must comply with NFPA 70, the International Building Code, and NEC Article 445. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) with an estimated magnitude between $250,000 and $300,000. The period of performance is 270 calendar days from the Notice to Proceed, with a requirement to submit a project schedule within 15 days of that notice. Award will be based solely on the lowest total evaluated price. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for Puerto Rico, and the provision of performance and payment bonds. Personnel must meet specific security requirements, including the signing of DHS non-disclosure agreements and obtaining PIV cards for IT system access. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
SLED
B4213 Replace Fire Alarm System
Solicitation # N400857504546
Solicitation N400857504546 is a task order for the replacement and upgrade of the complete fire alarm and mass notification system in Building 4213 at MCAS Cherry Point, North Carolina. The project involves the demolition of existing components and the installation of a new fully addressable fire detection and notification system, including VESDA panels and associated electrical modifications across both floors. The facility will remain occupied during construction, and the system must meet specific intelligibility and audibility standards in accordance with UFC, IBC, and NFPA regulations. The estimated cost for the project is between 500,000 and 1,000,000 dollars, with a total performance period of 270 calendar days from the date of award. The contract will be awarded based on the lowest price. Proposals are due by September 24, 2026, and must include bid, payment, and performance bonds for projects exceeding 150,000 dollars. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific cybersecurity and security prohibition standards. The contractor is required to host a partnering session within 45 days of the award and maintain a quality control system compliant with FAR 52.246-12. Final acceptance is contingent upon a joint pre-final inspection by the government and the contractor's quality control manager to verify the facility is complete and ready for occupancy.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in about 12 hours
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This solicitation is for a firm-fixed-price task order to provide and install two 40ft by 8ft steel FLEXTAINER conex offices for forensic personnel at the HSI facility in St. Thomas, US Virgin Islands. The project includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and connection to the nearest electrical circuit via PVC conduit. Each office must be equipped with R-11 insulation, vinyl flooring, four security windows, a steel door with a Cypher lock, and a 5-pound ABC fire extinguisher. The estimated magnitude of the project is between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. The contract is set aside for 8(a) Multiple Award Construction Contract (MACC) holders and is subject to the Buy American Act and union prevailing wage rates per determination VI20260001. Award will be based on the lowest total evaluated price, considering the technical approach, safety and quality control plans, and total proposed cost. Key requirements include a mandatory site survey prior to proposal submission, adherence to NFPA 70 and International Building Code standards, and strict security protocols, including the signing of DHS non-disclosure agreements and potential PIV card requirements for personnel. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
The Earle C. Clements Job Corps Center, operated by Management and Training Corporation (MTC) for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to replace existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling. The project involves removing retired aerial fiber lines and splice boxes from utility poles and building 2436, and installing new 12 strand single mode aerial fiber to provide network connectivity between the building 2436 network closet (MDF) and the building 2443 maintenance office (IDF). The contractor is responsible for providing all labor, equipment, and materials, including Belden FS3L0024NS 12 strand OS2 OSP fiber or an equivalent brand, fiber supports, rack-mounted enclosures, and lift rentals. Bids are due by October 5, 2026, and must be submitted via email using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout and proof of insurance. A physical site visit and signature on the attendance roster are mandatory prerequisites for bidding. Award selection is based on overall best value, and bidders must provide a bid bond, cashier's check, or money order. If the base bid is $25,000 or greater, performance and payment bonds from a surety company with at least an A- rating are required. The contract is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB classifications. Compliance with the Davis-Bacon Act, Executive Order 14026 regarding minimum wages, and FAR regulations concerning foreign purchases and the Buy American Act is required.
Earle C. Clements Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 13 days
View Details
NAICS: 238210
New
Los Angeles Job Corps Egress Lighting
Solicitation # Emergency Egress Lighting
Management & Training Corporation (MTC) is soliciting bids for a subcontracting opportunity to provide emergency egress lighting services at the Los Angeles Job Corps center warehouse located at 424-426 Towne Avenue, Los Angeles, California. The project requires the contractor to furnish and install four emergency egress lighting fixtures: two near the primary front exit doors, one on the storage area wall, and one on the mezzanine level. The scope of work includes all necessary labor, supervision, materials, equipment, and electrical wiring to ensure the installation complies with applicable life safety, fire, and electrical codes. The contractor is also responsible for testing battery backup systems and emergency illumination functions, as well as performing final site cleanup. This is a small business set-aside opportunity under NAICS code 238210, with a size standard of 19 million dollars. Bidders must submit a lump sum fee, a completed supplier packet including a W-9 and self-certification form, proof of insurance, and three references by September 25, 2026. Award selection will be based on best value as determined by MTC. The contract is subject to Service Contract Labor Standards under Wage Determination SCLS 2015-5613 Revision 31 and requires compliance with various FAR clauses, including those regarding the combating of trafficking in persons and the protection of sensitive government information. Invoicing should be submitted on a weekly or bi-weekly basis, and the center is exempt from sales tax under the Workforce Investment Act.
MTC Los Angeles Job Corps

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238210
New
SLED
On-Call Electrical Maintenance Services
Solicitation # RFP-OPS26-012
Western Municipal Water District has issued Request for Proposals RFP-OPS26-012 for on-call and scheduled electrical maintenance services to support district facilities, including pump stations, well sites, lift stations, and water and wastewater treatment plants. The contract is intended as a Firm Fixed Price agreement with a three-year base period and two optional one-year extensions. Qualified proposers must hold a California C-10 Electrical Contractor license and be registered with the DIR. The scope of work encompasses low voltage electrical work under 600v and standby power system services, divided into planned work with a 3 to 5 business day lead time and emergency response requiring 24/7/365 availability with a maximum 24-hour on-site arrival time. All work must adhere to the National Electrical Code, NFPA 70E arc flash safety standards, and OSHA/Cal-OSHA regulations. Proposals are due by October 19, 2026, via the PlanetBids Vendor Portal and will be evaluated based on a weighted criteria of work plan (30 points), qualifications and experience (30 points), key personnel (20 points), and cost (20 points). The selected contractor will be paid on a time and materials or lump sum basis, with payments made within 30 days of receiving a detailed invoice. Key requirements include compliance with California Labor Code prevailing wage laws for public works projects over 1,000 dollars, maintaining comprehensive insurance naming Western Water as an additional insured, and providing a one-year guarantee on all labor and materials. Performance will take place across a 527-square mile area of Riverside County, California.
Western Municipal Water District

POSTED

about 12 hours ago

DEADLINE

in 27 days
View Details

More opportunities from California → City of El Centro

Same awarding agency

NAICS: 237310
New
SLED
ATP Cycle 6 Improvements Project
Solicitation # 20260922003
The ATP Cycle 6 Improvements Project, solicitation number 20260922003, is a public works contract issued by the City of El Centro, California, Department of Public Works. The project focuses on roadway and intersection enhancements, specifically targeting the installation of new curbs, gutters, sidewalks, and concrete curb ramps. Key project locations include Main Street between Solana Drive and LaBrucherie Road, and State Street at the 14th Street intersection. Major deliverables include the installation of a Rectangular Rapid Flashing Beacon (RRFB), high visibility crosswalks, and general ADA improvements adhering to CalTAS 2025 and ADAAG standards. The contract mandates a 120-calendar day completion timeline, with liquidated damages set at 1,000 dollars per day for delays. Technical requirements specify the use of thermoplastic for traffic striping and a minimum concrete compressive strength of 4,000 psi. All work must comply with the Greenbook, Caltrans Standard Specifications, and the California Manual on Uniform Traffic Control Devices. Payment for traffic control is structured as a lump sum, with 35 percent paid after installation, 35 percent at the second pay request, and the final 30 percent upon completion. Contractors are required to provide performance and payment bonds and maintain all federal and state labor law postings at the project site.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS