Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Trail Feasibility Study – Engineering & Conceptual Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Pennsylvania → Community PlanningView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

PA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-67-106.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Valley Forge Gateway Trail Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Community Planning
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Community Planning
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop conceptual engineering drawings, evaluate trail alignment options, and assess grading, drainage, and structural needs.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. This professional services contract involves the design, bidding support, and engineering services during construction for a new municipal groundwater production well to replace and abandon the existing Corydon well. The project is divided into two phases: Phase 1 focuses on technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and matching existing vertical turbine equipment. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction and a negotiated fee for professional services. Proposals are due by September 1, 2026, via the PlanetBids portal. Award selection is based on demonstrated competence and professional qualifications, with weighted factors including relevant experience (25 percent), project approach (25 percent), scope and schedule (20 percent), innovation (10 percent), cost (10 percent), and overall proposal quality (10 percent). The contract is set aside for various small business categories, including Disadvantaged Business Enterprises (DBE). Compliance requirements are extensive, incorporating the Build America Buy America Act for domestic content, the Iran Contracting Act for proposals over one million dollars, and various federal regulations including 2 CFR Part 200 and the Department of Treasury ASAP payment system. The project is scheduled to start on November 2, 2026. Required submittals include a Preliminary Design Report, a detailed cost proposal broken down by task, and various certifications regarding lobbying, debarment, and the use of domestic iron and steel.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Pennsylvania → Community Planning

Same awarding agency

NAICS: 541715
New
SLED
Valley Forge Gateway Trail Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)
Solicitation # 26-67-106
The Delaware Valley Regional Planning Commission (DVRPC) is soliciting proposals for the Valley Forge Gateway Trail Feasibility Study, specifically focusing on Segment 7 to link the Village at Valley Forge with the Chester Valley Trail. This project involves evaluating trail alignments, crossing major infrastructure such as Route 202 and I-76 ramps, assessing environmental and regulatory constraints, and conducting public engagement. Key deliverables include a final feasibility study report, conceptual engineering drawings, a public engagement plan, and an implementation strategy. All work must be completed by June 30, 2028, and must comply with NEPA, ADA, and Title VI nondiscrimination standards. The procurement follows a best-value trade-off selection process in accordance with the Brooks Act, meaning cost is not a factor in the initial evaluation. Proposals are scored based on technical approach and project understanding (40%), professional qualifications (30%), commitment to sustainability and equity (15%), and the ability to perform within the schedule (15%). Submissions must be uploaded via the OpenGov portal by October 14, 2026, in two separate PDF volumes: a technical proposal and an administrative budget proposal. The lead consultant must be prequalified by DVRPC, and while the DBE subcontracting goal has been removed, disadvantaged business enterprises are still afforded full and fair opportunity to bid.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

about 21 hours ago

DEADLINE

in 2 months
View Details