Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TRANSFORMER, POWER

Closed
SPE7M5-26-T-411LFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This solicitation, issued by the Department of Defense Active Devices Division under solicitation number SPE7M5-26-T-411L, is for the procurement of 19 power transformers, identified by NSN 5950-00-686-1685. The contract requires delivery within 28 days after receipt of order, with the place of performance located in San Diego, California. Because this is a restricted source item, it requires engineering source approval from the government design control activity. Alternate offerors must provide extensive documentation per MIL-T-31000, including all manufacturing drawings, process operation sheets, and identification of critical process sources. Additionally, a shock extension report according to MIL-S-901 is required. If original equipment manufacturer drawings are unavailable, the offeror must submit a detailed engineering analysis report or a comprehensive reverse engineering procedure for review by the engineering support activity. Compliance with DLA packaging requirements and specific configuration change management protocols is also mandatory.

General Info

DoD seeks 19 power transformers for San Diego delivery within 28 days.

NAICS

334413 - Semiconductor and Related Device Manufacturing

Place of Performance

3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USA

Set-Aside

NONE

Documents

1

Request for Quotations SPE7M5-26-T-411L

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → ACTIVE DEVICES DIVISION
Contacts1 person available
OfficeUSA
Office AddressUSA

Full Description

Show more
TRANSFORMER,POWER
TRANSFORMER, POWER
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
ALTERNATE OFFEROR REQUIREMENTS:
THE FOLLOWING DOCUMENTATION IS REQUIRED IN
ACCORDANCE WITH MIL-T-31000. (A) ALL DRAWINGS
AND SPECIFICATIONS REQUIRED FOR MANUFACTURE.
(B) PROCESS/OPERATION SHEETS WHICH DESCRIBE
IN DETAIL EACH CRITICAL PROCESS AND ASSOCIATED
INSPECTION/ACCEPTANCE CRITERIA. (C)
IDENTIFICATION OF SOURCES WHO WILL PERFORM
CRITICAL PROCESSES/OPERATIONS, INCLUDING
SOURCES OF FORGINGS AND CASTINGS. (D) IF
AVAILABLE COPIES OF PURCHASE ORDERS FROM THE
ITEM. (E) A SHOCK EXTENSION REPORT IN
ACCORDANCE WITH MIL-S-901 AND IN A FORMAT AS
SPECIFIED IN DI-ENVR-80706 IS REQUIRED.
IF THE OEM'S DETAILED DRAWINGS ARE NOT
AVAILABLE, THE OFFEROR MUST SUPPLY AN
ENGINEERING ANALYSIS REPORT WHICH DETAILS HOW
THEIR DRAWINGS WERE DEVELOPED. ADDITIONALLY,
IF REVERSE ENGINEERING WAS USED, THE COMPLETE
PROCEDURE WILL BE REPORTED INCLUDING: NUMBER
OF SAMPLES, METHODS AND MEASURES USED, ALL DATA
COMPILED, RATIONALE FOR DIMENSION TOLERANCE
DEVIATION, AND RATIONALE FOR ACCEPTANCE. THIS
DATA WILL BE FORWARDED TO THE ENGINEERING
SUPPORT ACTIVITY FOR NSN/Part Number: 5950-00-686-1685 Quantity: 19 EA Purchase Request: 7016086144QTY: 19 Delivery: 28 days ADO

More opportunities from Department Of Defense → ACTIVE DEVICES DIVISION

Same awarding agency

NAICS: 335313
New
DIBBS
CIRCUIT BREAKER
Solicitation # SPE7M5-26-T-284C
Solicitation SPE7M5-26-T-284C is a small business set-aside request for quotations issued by the DLA Land and Maritime Active Devices Division for the procurement of 81 circuit breakers, part number MS24510-B-10 (NSN 5925012225033). The items are designated as critical application hardware and must be manufactured by a qualified QPL source, as commercial equivalents are strictly prohibited. Technical compliance is required according to SAE AS24510, AS58091, and TDP Rev A Gen 1, as well as the DLA Master List of Technical and Quality Requirements. Delivery is required within 166 days after order, with a need ship date of December 23, 2026, and a final required delivery date of January 27, 2027. The destination for inspection and acceptance is DLA Distribution Warner Robins in Georgia. Packaging must adhere to MIL-STD-129 and DLA requirement RP001, with specific prohibitions against the intentional addition of mercury and the use of Class I ozone-depleting chemicals. The contract incorporates various FAR and DFARS clauses, including requirements for CMMC Level 2 certification, NIST SP 800-171 assessment, and compliance with the Buy American Act and Berry Amendment. All quotes must be submitted via the DIBBS system. Payment and receiving reports are to be processed electronically through the Wide Area WorkFlow system.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS