Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transportation and Economic Corridors - Invitation to Bid - TND0025604 - Filtration System Upgrade - Gull Lake Pump House

Closed
AB-2025-07738International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, was posted on November 10, 2026, with a response deadline of December 4, 2026. The opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The scope of work involves comprehensive sewer infrastructure improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of sanitary sewer pipes ranging from 6 to 30 inch PVC and 18 to 24 inch DIP, the construction of standard and doghouse manholes, and the execution of 24-inch diameter DIP trenchless crossings with associated launch and receiving shafts. Additional requirements include the fit out of a CSO regulator, outfall installation, and site work such as clearing 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must also provide specialized services including SWPPP implementation and maintenance, geotechnical instrumentation and monitoring, and railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes, as well as the abandonment of existing pipes and manholes. Interested firms should contact John Connelly at Cleary Construction for bid documents and to discuss subcontracting opportunities.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 23 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system, with specific technical requirements including AC paving, pipe and fitting installation, jack and bore operations, cold planing, demolition, potholing, welding, and the implementation of SWPPP. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, as well as other certified partners such as MBE, SBE, WBE, SBRA, and LSAF. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the provided bid documents and agency specifications.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract involves the filtration system upgrade at the Gull Lake Pump House located in Alberta, managed by the Transportation and Economic Corridors agency under the Government of Canada. The tender was made available on December 16, 2025, with a closing date for submissions on February 4, 2026. A mandatory pre-bid meeting and site inspection are scheduled for January 7, 2026. All tenders must be submitted via email before 2:01 PM local time. The scope of work includes a wide range of construction activities such as site clearing, topsoil handling, seeding, demolition, erosion control, fencing, culvert installation, pipe and fitting supply, riprap placement, concrete, metal, mechanical, electrical work, and the installation of specialized structures such as precast manholes and steel building systems. Contractors are responsible for supplying all materials necessary for the work. The project requires substantial performance by September 30, 2026, with total completion expected by October 30, 2026. Approximate quantities for various earthworks, piping, fencing, and structural components are detailed, alongside several lump sum provisions covering specialized construction divisions and equipment. The contact person for inquiries is Jennifer Johnstone, Project Procurement Officer, who can be reached via email. The contract emphasizes compliance with special provisions related to water management and erosion control, highlighting the comprehensive nature of the filtration system upgrade.

General Info

Upgrade filtration system at Gull Lake Pump House, Alberta; submit tenders by Feb 4, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Transportation and Economic Corridors
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Jennifer JohnstoneContracting Authority

Full Description

Show more
Tender available date: Tuesday, December 16, 2025. Tender closing date: Wednesday, February 04, 2026 (revised Addendum No. 2) Pre-Bid Meeting and Site Inspection: Wednesday, January 07, 2026 at 10:00 am local time at the Gull Lake Pump House. Project Inquiries: Jennifer Johnstone, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: contact@example.gov TENDERS will only be received by email at contact@example.gov, before 2:01:00 P.M., for construction of the following work: TND0025604 FILTRATION SYSTEM UPGRADE GULL LAKE PUMP HOUSE APPROXIMATE QUANTITIES: 1 lump sum Care of Water (Special Provisions) 1 lump sum Site Clearing and Grubbing 900 m3 Topsoil and Subsoil Stripping 1000 m3 Topsoil and Subsoil Placement 3000 m2 Drill Seeding 1 lump sum Relocation of Existing Temporary Structures 1 lump sum Demolition of Existing Office Structure 1 lump sum Erosion and Sedimentation Control 30 m Demolition of Existing barbed Wire Fence 30 m Supply and Install of Barbed Wire Fence 1 lump sum Existing Stainless Steel Discharge Pipe 1 lump sum Removal of Existing CSP Culvert 2000 m3 Authorized Waste Excavation 750 m3 Authorized placement of Impervious Fill Zone 1A 15 m Supply and Install 300 mm CSP Culvert 35 m Supply and Install 500 mm CSP Culvert 2 each Supply and Install Pro-Eco-Lite Headwall 125 m3 Supply and Placement of Road Gravel Zone 4B 125 m3 Supply and Placement of Gravel Zone 4C 75 m Supply and Install 150 mm PVC 1 lump sum Supply and Install Stailess Steel Pipe and Fittings at Inlet Wall 125 m Supply and Install 250 mm PVC 25 m3 Supply and Placement of Coarse Riprap Bedding 5B 25 m3 Authorized Supply and Placement of Riprap Zone 6A 2 each Supply and Install Type 5A Precast Manhole 1 lump sum Division 3 - Concrete 1 lump sum Division 5 - Metals 1 lump sum Division 7 - Thermal And Moisture Protection 1 lump sum Division 8 - Openings 1 lump sum Division 9 - Finishes 1 lump sum Division 11 - Crane 1 lump sum Division 11 - Equipment 1 lump sum Division 13 - Special Construction 1 lump sum Division 13 - Steel Building Systems 1 lump sum Division 15 - Mechanical 1 lump sum Division 16 - Electrical Contractor to supply all materials. Substantial Performance of the Work – September 30, 2026. Total Performance of the Work – October 30, 2026.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS