Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Trash Full Capture Projects (W14230102/W14230104)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sacramento is initiating the Trash Full Capture Projects, identified by project numbers W14230102 and W14230104, to comply with Central Valley Regional Water Board requirements. The primary objective is to prevent the discharge of trash larger than 5 mm into receiving waters by installing three manufacturer-prefabricated, Water Board-certified trash capture systems. These systems will be placed at existing concrete-lined stormwater channels at three strategically selected locations: Site 144 at the Interstate 80 North Ditch near Phillipi Way and Rio Linda Boulevard, Site 151 west of Exposition Parkway south of Slobe Avenue, and Site 157 at the Interstate 80 South Ditch east of Western Avenue. The project is classified as a forecast with a posted date of September 30, 2026, and is managed by the City of Sacramento in California. According to the Notice of Exemption filed on September 29, 2026, the project is exempt from the California Environmental Quality Act under Categorical Exemption Section 15301 for Existing Facilities. Key points of contact for the project include Senior Planner Charles Tschudin and Senior Engineer Bryan Mahoney.

General Info

Sacramento will install three trash capture systems to prevent stormwater pollution in channels.

Agency

California → City of Sacramento

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Sacramento
Office AddressN/A
Contacts
Charles TschudinSenior Planner
Bryan MahoneySenior Engineer

Full Description

Show more
The City of Sacramento is proposing to construct three full trash capture systems as part of the Trash Full Capture Project (project) within the greater Sacramento area to comply with the Central Valley Regional Water Board's (Water Board) requirements to prevent the discharge of trash greater than 5 mm into receiving waters through the implementation of certified Full Capture Systems. The three project sites were selected based on engineering, hydraulic. and trash capture feasibility analyses. They intend to provide full trash capture within the designated watersheds: Site 144 at the Interstate 80 (1-80) North Ditch approximately 170 feet east of the intersection of Phillipi Way and Rio Linda Boulevard. Site 151 located approximately 150 feet west of Exposition Parkway south of Slobe Avenue. and Site 157 at the 1-80 South Ditch approximately 700 feet east of Western Avenue The site improvements consist of the installation of a Water Board certified, manufacturer-prefabricated trash capture system at existing concrete lined stormwater channels.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include traffic control, SWPPP, construction surveying, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is managing the solicitation for this project and is specifically seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support various specialty trades. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding portal. Primary points of contact for coordination and outreach are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 11 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, concluding with by-pass pumping, testing, and commissioning. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and the total of unit price products. Bids must include a bid bond, MWBE documentation, and a completed bid form. The contract is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Payment is processed monthly via applications for payment, with a 30-day due date following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of open and covered concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements involve the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, and modifications to sluice and slide gates. The project also entails installing platforms for access, rerouting sump pump discharge lines, performing excavation and trench work, and conducting surveying around the reactors. This solicitation is specifically targeting Small Business, Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified subcontractors, with a particular emphasis on DBE, MBE, WBE, and SBE firms. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Quotes are due by November 17, 2026, at 2:00 PM PT, and must include the subcontractor's bond rate and any redlines to the Garney Standard Purchase Order and Subcontract forms.
Garney Pacific, Inc.

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS