Treated Water interonnection Agreement between The City of Poway and the City of San Diego

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This interagency agreement between the City of San Diego and the City of Poway establishes two potable water emergency connections designed to improve redundancy for the City of Poway's drinking water system. This initiative stems from a settlement agreement with the California State Water Resources Control Board and the Division of Drinking Water. The City of San Diego's drinking water system serves as the sole adjacent system capable of providing this connection, which is intended exclusively for supplying water to Poway during emergency situations. The project has been certified as exempt from the California Environmental Quality Act under sections relating to existing facilities and the construction of small structures. The project involves two specific interconnection sites located within the Sabre Springs and Rancho Bernardo Community Plan Areas of Council District 5. The first site at Pomerado Road and Avenida La Valencia will utilize a 10-inch meter, with both design and construction phases expected to be completed in Fiscal Year 2025. The second site at Poway Road and Springhurst Drive will utilize an 8-inch meter; design for this location is slated for completion in Fiscal Year 2027, with construction following in Fiscal Year 2028. The City of San Diego Public Utilities Department serves as the lead agency for this agreement.

General Info

San Diego and Poway agree to two emergency potable water connections by 2028.

Agency

California → City of San Diego

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

NOE Treated Water Interconnection Agreement Poway and San Diego

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Laila NasrawiCivil Senior Engineer
Tiffany SmithSenior Planner

Full Description

Show more
An interagency agreement between the City of San Diego and the City of Poway to provide two potaMe water emergency connections to the City of Poway. The City of Poway is requesting these emergency connections due to a settlement agreement with the California State Water Resources Control Board (SWRCB) and the Division of Drinking Water (DDW). These two potable water emergency connections will improve redundancy for the City of Poway's drinking water system. The City of San Diego's drinking water system is the only system adjacent to City of-Poway that can provide this type of connection. The sole purpose of these connections is to supply water from the City of San Diego's drinking water system to the City of Poway's drinking water system in emergency situations. At the Poway Road & Springhurst Drive emergency connection, an 8-inch meter will be nsed to measure any water provided to Poway from San Diego. Design for this interconnection by the City of Poway is expected to be completed in Fiscal Year 2027 and Construction is expected In Fiscal Year 2028. At the Pomerado Road & Avenida La Valencia emergency Interconnection, a 10-inch meter will be used to measure any water provided to Poway from San Diego. Design foi: this interconnection by the City of Poway is expected to be completed in Fiscal Year 2025 and Construction is expected in Fiscal Year 2025.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 12 hours ago

DEADLINE

in about 20 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS