Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 30, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tree Clearing on Chalk Island

Awarded
W9128F18Q0072Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
Airway Aesthetics Maintenance
Solicitation # 2027-0081
The City of El Paso is soliciting bids under solicitation number 2027-0081 for Airway Aesthetics Maintenance, primarily supporting the Streets and Maintenance Department. The scope of work is divided into two primary service groups: Group I, which consists of regular monthly maintenance, and Group II, which covers bi-annual turbine and sculpture maintenance. Qualified bidders must demonstrate specific experience in aesthetics maintenance and the implementation of traffic control during service operations. The evaluation process includes a review of contract experience from the past five years and a scoring matrix based on the level of medical insurance and benefits provided to employees. The solicitation process includes a non-mandatory pre-bid conference on October 28, 2026, with a question deadline of November 4, 2026. Bids are due by 2:00 P.M. on November 18, 2026, with a public bid opening following shortly after. The anticipated contract award date is February 2027. Required submission documents include a Non-Collusion and Business Disclosure Affidavit, an Indebtedness Affidavit for contracts exceeding 25,000 dollars, Form 1295 for disclosure of interested parties, and a W-9 form. Additionally, vendors must certify compliance with Texas Government Code regarding boycotts of Israel and energy companies, and confirm that no organizational changes or departures of key personnel are expected within the next twelve months.
City Of El Paso

POSTED

about 8 hours ago

DEADLINE

in 29 days
NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and over 35 buildings, requiring the contractor to provide all labor, equipment, and materials for mowing, string trimming, edging, and cleanup. Turf must be maintained between 3 and 4 inches in height, and any identified deficiencies must be corrected within 48 hours at no additional cost. The contract consists of an initial one-year term with options for four additional one-year renewals, contingent upon funding and satisfactory performance. This is a small business set-aside opportunity open to various SBA-certified categories, including VOSB, SDVOSB, WOSB, and HUBZone small businesses. Award will be granted to the responsible offeror who is technically acceptable and provides the lowest price. Technical acceptability requires evidence of Kentucky state registration and licensure, verification of eligibility via the SAM portal, and the submission of a detailed technical proposal, safety program, and equipment list. Contractors must adhere to the Federal Acquisition Regulation and Davis-Bacon Act labor standards, including the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. Additionally, contractors must provide proof of insurance and the ability to secure performance and payment bonding. All quotes must be submitted electronically to the designated purchasing email by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 561730
New
MI 2026-10 Landscaping Services
Solicitation # MI 2026-10
Adams and Associates, Inc., operating on behalf of the U.S. Department of Labor, is soliciting bids for landscaping services at the Miami Job Corps Center in Florida. The scope of work involves the maintenance of a 15-acre lot, including lawn cutting for the school front and outer perimeter, weed killer treatment for planting beds and sidewalks, bush trimming, and the maintenance of baseball and volleyball fields. The period of performance is scheduled from November 1, 2026, to October 31, 2027. Bids must be submitted by October 23, 2026, and will be evaluated based on the most responsible bidder rather than the lowest cost alone. Eligible vendors must be registered in SAM.gov with a valid Unique Entity ID and possess all necessary business and employee licenses for the State of Florida. Required bid documentation includes a vendor questionnaire, W9, Authority to Commit, and a list of references for those without prior experience with the Center. Contractors must maintain comprehensive general liability insurance of $1,000,000 per occurrence, along with workers compensation and automobile liability insurance. The contract is subject to the Service Contract Act and Davis-Bacon Act, requiring adherence to specific wage determinations and payroll submission for service incidents exceeding $2,500. Additionally, personnel must comply with strict security protocols, including searches and a no-fraternization policy with students. Payment terms are NET 30 days from the date of invoice.
Miami Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 2 days
NAICS: 561730
New
SLED
Jeff/Bessemer Co DHR FY27 Lawn Care
Solicitation # SRC0000037228
Solicitation SRC0000037228 is a request for quotes for FY27 lawn care services for the DHR Jefferson County Bessemer office located at 2014 1st Avenue North, Bessemer, Alabama. The contract covers the period from October 2026 through September 30, 2027, with the possibility of annual renewals for up to five years or until a total contract cost of 25,000 dollars is reached. The scope of work includes grass cutting, weed eating shrub beds, trimming and spraying around buildings and fences, blowing clippings from paved areas, and removing debris from the property. The scope specifically excludes the replacement of pine straw and the spraying of beds. A required site visit is scheduled for October 23, 2026, from 8:00 am to 4:00 pm. Responses must be submitted electronically through the Alabama Buys portal by October 26, 2026, at 4:15 pm. Evaluation will be based on pricing, cost realism, and price reasonableness, and the state may request professional licenses and certificates of insurance after the bid opening. Payment terms are net 30 days, paid in arrears upon completion of service. Compliance requirements include E-Verify documentation within five calendar days of notification, registration with the Alabama Secretary of State for foreign entities, and certifications regarding non-collusion and tax compliance. The sole venue for any litigation or dispute resolution is the City of Montgomery, Alabama.
DHR Jefferson County Main Office

POSTED

about 8 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This fixed-price, performance-based contract awarded by the U.S. Army Corps of Engineers Omaha District requires the cutting and removal of trees, shrubs, and woody vegetation at the Gavins Point Project in Cedar County, Nebraska. The primary objectives are to maintain dam and facility infrastructure integrity and ensure public safety along roadways. The scope of work is divided into two main areas: Unit 1, covering approximately 0.75 acres of steep and rocky terrain on Chalk Island, and Unit 2, covering approximately 1,805 linear feet along the south and west roadside between the Power Plant and Picnic Area. The contractor is responsible for providing all labor, equipment, and EPA-approved herbicides. Key requirements include cutting stumps to no more than two inches above the ground, removing all debris from government property, and applying chemical treatments to stumps within one hour of cutting, excluding coniferous trees. All personnel handling chemicals must hold a valid State of Nebraska Commercial Pesticide Applicator License. The period of performance runs from August 15, 2018, to October 31, 2018, with a mandate to complete all services within 15 business days of commencement. Performance is measured by a 100 percent inspection rate, a minimum 90 percent kill-rate for treated vegetation, and the timely submission of daily Pesticide Application Records.

General Info

Contract Value

$49,525

NAICS

561730 - Landscaping Services

Place of Performance

NE, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Contract W9128F18P0096 - Tree Clearing on Chalk Island

PDF, High priority: read this firstaward
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Monica DwyerPurchasing Agent

Full Description

Show more
PERFORMANCE WORK STATEMENT (PWS) Tree Clearing on Chalk Island & surrounding area USACE, Gavins Point Project 1.0 General Information. 1.1 Background. The Gavins Point Project is a Multi-Purpose Civil Works Water Resources Development Project operated by the U.S. Army Corps of Engineers (USACE), Omaha District. The objective of this contract is to cut and remove all trees indicated within the designated work units. Trees and woody vegetation are required to be controlled as described in this PWS for dam and facility infrastructure integrity and for public safety purposes along roadways. 1.1.1 Place of Performance. The Gavins Point Project is located approximately five (5) miles west, and two (2) miles south of Yankton, South Dakota in Cedar County, Nebraska. The Gavins Point Project Administration Office is located at 55245 State Highway 121, Crofton, Nebraska. All work units under this contract are located in Cedar County, Nebraska. 1.2 Scope of Work. This is a non-personal services contract to provide control of trees, shrubs, and woody vegetation established on Chalk Island and along the roadway (Crest Rd.) from the Powerhouse to State Highway 121. Vegetative control will include the cutting of and removal of vegetation in accordance with contract specifications. Some areas will require the use of a chemical pesticide/herbicide application following the vegetation removal. Stumps from vegetation removed shall remain in place for erosion control purposes, however no stumps cut shall exceed a height of two (2") inches above the existing ground surface. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government. This is a fixed priced, performance based service contract where the government defines and measures desired outcomes, while contractor methods are generally not constrained or directed. 1.3 Period of Performance. The Contractor shall have from August 15, 2018 until October 31, 2018 to complete all services in accordance with contract specifications, after receiving notice of contract award. Once work commences by the Contractor, the Contractor shall have fifteen (15) business days to complete all required services under this contract. The time state for completion includes final cleanup of the premises and removal of all Contractor's equipment, materials and supplies. If adverse weather conditions or any other unforeseen circumstances prevent the completion of the contract work within the allotted time frame, the Contactor shall be required to document and submit in writing to the Contracting Officer a request for contract time extension which must document the cause(s) for the contracted work not being completed on time. Approval of any contract extension shall be at the discretion of the Contracting Officer. 1.4 Contractor Personnel 1.4.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.4.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor's own payroll. 1.4.1.1 All Contractor personnel involved with the application of chemical pesticides/herbicides shall possess and maintain a valid State of Nebraska Commercial Pesticide Applicator License with the appropriate pesticide certification classification(s) during the period(s) of performance of this contract. 1.4.1.2 The Contractor shall ensure that all personnel are skilled in and capable of performing the work under this contract. The Contractor shall ensure all personnel are trained and have working knowledge of the specific vehicles, equipment, supplies and chemicals they will use/operate and the tasks they are to perform. The Contractor shall ensure that all personnel shall have the ability to correctly identify all target species at all growth stages and be able to successfully avoid chemical spray contact or drift, or cutting/removal to non-target species. All Contractor personnel shall perform chemical pesticide/herbicide applications in accordance with label requirements in respect to weather and seasonal conditions. 1.4.1.3 Work areas under this contract are located on steep slopes and hillsides, therefore extreme caution and care shall be exercised by the Contractor and all Contractor personnel performing work under this contract. The Contractor shall be responsible for insuring proper use of any and all safety equipment necessary by all personnel to perform work under this agreement in a safe and responsible manner. The Contractor shall be responsible for furnishing any and all safety equipment and/or supplies under this contract that will be used by Contractor personnel. 1.4.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor. 1.5 Quality Control. The Contractor shall designate, in writing, an employee who shall serve as the contact for matters involving quality and performance or nonperformance of the required work stated in this PWS. The employee(s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to insure that the required work is performed in accordance with the standards contained herein. The contractor shall furnish the above written designation to the GR no later than the first day of work. The contractor shall include the name(s), address(s), and telephone number(s) of the responsible individual(s). 1.6 Quality Assurance. 1.6.1 The Government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections in a manner that will not delay the work. 1.6.2 If any of the services do not conform to contract requirements, the Government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed. 1.6.2.1 Upon verification of a validated customer complaint or corrective action report, the Contracting Officer will notify the contractor that they are required to re-perform specific services. The contractor is required to re-perform services within a 24-hour notice from the Contracting Officer. 1.6.3 The Government may take action, if the contractor fails to perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements. The Government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that related to the performance of such service or (2) terminate the contract in whole or in part 1.6.4 The Contractor is responsible to replace/repair any damage to government property due to negligence, at his or her own cost. The Government may take action, if the contractor fails to replace/repair any damage to government property. The Government may by contract, or otherwise, replace/repair damaged government property and charge to the contractor any cost incurred by the government to replace/repair any damage. 1.7 Hours of Operation. The contractor is responsible for conducting business between the hours of sunrise and sunset, Monday thru Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. Work may be permitted outside of regular business hours if approved by the GR in advance. 1.8 Pre-Work Meeting. Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting with the Government Representative (GR). The Meeting shall discuss the work requirements, scheduling, submittal process, review of the Activity Hazard Analysis (AHA), and Abbreviated Accident Prevention Plan (AAP). At least one (1) week prior to commencing work, the Contractor shall coordinate their proposed work schedule with the COR. 1.9. Submittals. Prior to commencement of services, the Contractor shall submit the following documents to the Government Point of Contact for review and approval: a. Activity Hazard Analysis (AHA); b. Abbreviated Accident Prevention Plan (APP) c. List of who will perform work on this contract; d. Proof of Insurance for Contractors and Subcontractors e. Photocopies of state-issued Commercial Pesticide Applicator License for all pesticide applicators. 1.10 Standards and Regulations. The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following: a. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2-316.pdf?ver=2013-08-22-104526-670) b. Engineering Manual (EM) 385-1-1 (USACE - Safety and Health Requirements Manual), dated November 2014; http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf c. Occupational Safety and Health Standards (29 CFR 1910); d. Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), https://www.epa.gov/enforcement/federal-insecticide-fungicide-and-rodenticide-act-fifra-and-federal-facilities; e. National Pollutant Discharge Elimination System (NPDES), https://www.epa.gov/npdes. 1.10.1 Activity Hazard Analysis (AHA). The contractor shall prepare the AHA in accordance with Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare the AHA IAW Figure 1-2. Note: Contractors and other individual employer's typically use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools. The government considers equivalent to, and acceptable substitutes for, the USACE's AHA provided the data collected is the same as that required by the AHA, commensurate with the type of services the contractor is performing. 1.10.2 Abbreviated Accident Prevention Plan (APP). EM 385-1-1 in its entirety may be too complex for the type of work performed under these contracts; contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific abbreviated Accident Prevention Plan (APP). The contractor shall prepare the APP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The contractor shall sign and submit the APP for approval prior to the start of work onsite. 1.11 Physical Security. The Contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials. Specific security conditions may change based on threats to national defense, and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times, as applicable. 1.12 Antiterrorism/Operation Security Requirements 1.12.1 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes. 1.13 Pesticide Application Laws and Regulations. The Contractor shall comply with all Federal and State of Nebraska pesticide application laws and regulations, including all pesticide/herbicide label guidelines and manufacturer's recommendations. Only U.S. Environmental Protection Agency (EPA)-approved pesticides and herbicides authorized for use in the State of Nebraska may be used in this contract. The application of any restricted-use pesticides/herbicides is not permitted under this contract. 1.14 Insurance. The Contractor shall be fully insured against any potential damages or liabilities related to the work specified herein. The Contractor is responsible for any damage to Government and/or private/personal property such as, but not limited to: turf, roads, fences, signs, guardrails, vehicles, etc. 1.15 Environmental Protection. The Contractor shall perform all work in such a manner as to minimize the polluting of air, water, or land, and shall within reasonable limits control noise and properly dispose of solid waste materials and other pollutants. 1.15.1 Protection of Resources. The Contractor shall not pollute rivers, ponds, or other water bodies with fuels, oils, herbicides, or other harmful materials. The Contractor shall investigate and comply with all Federal, State and Municipal Laws and Regulations concerning pollution of rivers and streams. 1.15.2 Spillage. Special measures must be taken by the Contractor to prevent pesticides/herbicides, fuels, oils, and other chemicals from entering public waters. If any spillage occurs, the Contractor shall remove the material and restore the area to the original condition prior to contamination. If soil contamination occurs, the contaminated ground shall be excavated and disposed of as directed by the Contracting Officer, and replaced with suitable fill material, compacted and finished with topsoil and planted as required to reestablish vegetation all at the expense of the contractor. 1.15.2.1 Notification of Chemical Spills. The Contractor shall immediately notify the COR of any chemical or hazardous material spillage. 1.15.3 Disposal. Disposal of all materials shall be at appropriate, authorized and legal locations and removed off of Government Property. Disposal of any materials, wastes, effluent, trash, garbage, oil, grease, chemicals, etc., in areas adjacent to rivers and streams is not permitted. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to the original condition prior to contamination. If necessary, contaminated ground shall be excavated and disposed of as directed by the Contracting Officer, and replaced with suitable fill material, compacted and finished with topsoil and planted as required to reestablish vegetation all at the expense of the contractor. 1.15.4 Protection of Non-Target Species. The Contractor shall not deface, injure, kill, or otherwise destroy non-target species, or any vegetation outside of the designated work units. Care shall be exercised at all times by the contractor to minimize damage to non-target species from the required work. 1.15.5 Prevention of spread of Noxious Weeds. The Contractor shall clean all equipment and vehicles prior to entering Government property. Equipment and vehicles shall have no visible soils, roots, vegetative material, seeds, or other debris that could potentially contain seeds. 1.16 Payment 1.16.1 The Government will make payment within thirty (30) days upon completion of all services, after the Government has inspected and accepted the services, and the Government has reviewed, approved, and processed the Contractor's invoice. The Contractor shall submit the invoice to the COR and/or any other person that has been designated in the contract to receive the invoice. 1.16.2 The contractor must provide the contractor's name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper. The contractor shall submit the invoice upon completion of all services to the COR, in accordance with the period of performance stated in the CLIN. 2.0 Definitions. The following definitions and descriptions apply wherever the word(s) or phrase(s) is/are stated in this PWS: Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service. Government Representative (GR): means an individual designated as the person to perform specific technical or administrative functions. Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise. Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement. 3.0 Government Furnished Items and Services 3.1 General. The Government will not furnish any supplies, equipment, labor, facilities, materials, utilities, storage, or services required to perform work under this contract that are not listed under Section 3 of this PWS. 4.0 Contractor Furnished Items and Responsibilities 4.1 General. The Contractor shall furnish all supplies, equipment, labor, facilities, materials, utilities, storage, and services required to perform work under this contract that are not listed under Section 3 of this PWS. 4.2 Supplies. The Contractor shall furnish all supplies for successful completion of all contract specifications, including but not limited to: chemical pesticides/herbicides, pesticide application supplies, fuel, oil, chain, chainsaw supplies and first aid supplies, etc. to successfully complete the requirements of this contract. 4.2.1 Chemical Herbicide. The Contractor shall furnish a chemical herbicide adequate for proper chemical treatment for stumps following cutting operations. All chemical pesticides/herbicides shall be EPA-approved for use in the State of Nebraska. Restricted-use pesticides are not authorized to be used under this contract. 4.3 Equipment. The Contractor shall furnish all necessary equipment, including but not limited to: vehicles, spraying equipment, handsaws, chainsaws, pole saws, spraying equipment, fall-protection/safety equipment, etc. to successfully complete the requirements of this contract. 4.4 Materials. The Contractor shall furnish all necessary materials including, but not limited to: insurance, permits, licenses, work plan, accident prevention plan, quality control, pesticide application records (PARs), invoices, etc. to successfully complete the requirements of this contract. 4.5 Utilities. The Contractor shall furnish all necessary utilities, including, but not limited to: Contractor's own water source for tank-mixing purposes, etc. to successfully complete the requirements of this contract. 4.6 Storage. The Contractor shall furnish all necessary storage for all Contractor-furnished equipment, supplies, and materials. The Government shall not be liable for damage, theft, or vandalism of contractor-furnished equipment, supplies, and materials. 5.0 Specific Tasks 5.1 Basic Services. The Contractor shall provide services for successful control and removal of all target vegetation without damaging and/or killing non-target vegetation within the designated areas on project lands as specified within this PWS. Chemical pesticide/herbicide application rates and mixtures shall be to ensure the target species is successfully killed. All trees, limbs, branches, and related debris shall be removed from Government property upon completion of vegetative removal. The designated work units shall have successful vegetation control as directed and in accordance with the contract specifications. To minimize the impacts to land resources, public visitors and project operations, the Contractor shall limit the number of vehicles used to access the work sites. The number of vehicles, routes to work units, and parking of vehicles shall be directed by the GR at the pre-work conference. 5.2 Work Unit Descriptions and Requirements. The following describes each unit in approximate size, general conditions, and the target vegetation species for vegetative control, as described in each section. 5.2.1 Unit 1 - Chalk Island - approx. 0.75 acres +/-. This area includes the sloped areas on the west and east slopes of Chalk Island, located between the Gavins Point Project Powerhouse and the spillway bridge deck. This includes all areas from the mowed turf at top of the island to the base of the island where the turf area begins near the cement walls surrounding the island. The western portion is between the guard rails and the cement walls above Lewis and Clark Lake. Most trees and shrubs range from 1-8" inches in diameter with a few over 10". This unit is sloped with steep terrain, with loose rock and footings, with some cliff ledges present, above typically swift-moving and turbulent water below. All work operations in this area shall be completed in a safe and responsible manner at all times and exercise extreme caution near slopes, hillsides and above the water by the Contractor and all contractor personnel. Many of the areas within this work unit are not accessible by vehicles (including off-road vehicles such as ATV's) and will require hand-cutting/trimming and chemical pesticide/herbicide applications by use of hand-operated spraying equipment in many instances. 5.2.1.1 The Contractor shall cut down and remove all trees/shrubs/woody vegetation located in Unit 1, with the exception of the existing sumac and grassy vegetation. Trees/shrubs/woody vegetation shall be cut in a manner so that no stumps exceed more than two inches (2") above than the existing ground surface, and no limbs or branches shall remain. All existing sumac shall remain on slopes and not be cut or chemically treated. All other non-target vegetation (all non-woody vegetation) shall remain (sumac should remain and not be cut or treated, however all woody vegetation growing within sumac including cedar trees and other trees shall be cut and treated). 5.2.1.2 The Contractor shall chemically treat each cut tree/shrub/woody vegetation stump within unit 1 with the chemical herbicide, no more than one (1) hour following cutting of the tree/shrub/woody vegetation in order to successfully kill the target species. All stumps shall be marked with dye to mark each tree stump upon each chemical treatment. Coniferous trees such as Eastern Red Cedar shall not be chemically treated after being cut. 5.2.2 Unit 2 - South/West Roadside between Power Plant and Picnic Area - approx. 1,805 linear ft. by 18 linear ft. This area includes the south and west slopes along the roadway. All trees, shrubs, and woody vegetation shall be cut-down, from the asphalt road surface road stripe to five (5') linear feet from the road stripe, and all trees, shrubs, and woody vegetation shall be cut-down from the slope base to twelve (12') linear feet from the start of the upward slope. Stumps shall remain, but no stumps shall exceed a height of more than two (2") inches higher than the existing ground surface, with no branches or limbs remaining. See Technical Exhibit 3 for a diagram showing these specifications. The trees, shrubs, and woody vegetation vary in size with most present ranting from 1-8" in diameter, with few exceeding 10" in diameter. The Contractor shall chemically treat each cut tree/shrub/woody vegetation stump within unit 2 with the chemical herbicide, no more than one (1) hour following cutting of the tree/shrub/woody vegetation in order to successfully kill the target species. All stumps shall be marked with blue dye to mark each tree stump upon each chemical treatment. Coniferous trees such as Eastern Red Cedar shall not be chemically treated after being cut. 5.2.3 Removal/Disposal of Trees, limbs and related debris from Government Property. It is the responsibility of the Contractor properly dispose of all trees, limbs, branches, and any other vegetative debris or material of off of Government property - and secure a proper disposal location. The Contractor is permitted to chip and/or mulch any trees, limbs or related debris on Government property, however all chipped/mulched material shall be removed from Government property. All materials shall be transported and disposed of in accordance with all applicable laws and regulations. 5.2.4 Pesticide/Herbicide Applications. A Pesticide Application Record (PAR) must be completed daily on-site for each chemical pesticide/herbicide application and submitted to the GR no more than ten (10) days following the application and prior to submittal of invoice for payment. The Contractor shall identify weather conditions before commencing with any chemical pesticide/herbicide applications, and continue to monitor weather conditions throughout the course of the application. Manufacturer's label direction and warnings relative to temperature, wind, or other weather conditions shall be strictly adhered to. The Contractor shall immediately stop application of chemical herbicide if weather conditions may adversely impact the application and commence operations when weather conditions are favorable. Chemical herbicide applications shall not take place when precipitation is expected before the herbicide formulation is rainfast. If treatment is followed by rain before the application is rainfast as specified on the chemical's label, the area shall be retreated at the Contractor's expense. Care shall be exercised at all times by the contractor to protect desirable (non-target) vegetation from damage from wind drift or other means. 5.3 Inspection and Acceptance of Contractor Performance. The Contractor shall notify the GR a minimum of 48-hours prior to completion of work within each work unit to conduct the final inspection. The Contractor shall be required to meet with the GR at the final inspection on-site within each work unit to ensure the services have been provided successfully to the contract and all contract specifications have been achieved. The Contractor shall not remove his/her equipment, materials and supplies from the designated work unit until directed by the GR following final inspection of the work unit. The Government will not accept an invoice for payment from the Contractor until all work activities have been completed in all units and after successful final inspection. 6.0 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. Performance Objective Standard Performance Threshold Method of Surveillance PRS # 1. The Contractor shall successfully cut and remove all target vegetation and properly dispose of all vegetation and related debris. The contractor shall provide for tree cutting services in accordance with the PWS, specifically Section 5. Zero deviation from standard. Direct Observation. 100% Inspection. PRS # 2 The contractor shall successfully chemically treat all tree stumps indicated with an approved chemical herbicide. The contractor shall provide for chemical treatment in accordance with the PWS, specifically Section 5, and avoid chemical drift or application of chemical to non-target species. The Contractor shall achieve a minimum kill-rate of 90% of all target vegetation following chemical application. Direct Observation. 100% Inspection. PRS # 3 The contractor shall submit a completed Pesticide Application Report (PAR), upon completion each chemical treatment within 10 days of application. The contractor shall provide a complete and accurate PAR in accordance with the PWS. Zero deviation from standard Direct Observation. 100% Inspection. 7.0 Separate Attachments 7.1 Work Unit 1 - Chalk Island 7.2 Work Unit 2 - South Slope 7.3 Gavins Point Location Map ? TECHNICAL EXHIBIT 1 TRIMMING SPECIFICATION DIAGRAMS FOR ALONG ROADWAYS UNIT 2 TECHNICAL EXHIBIT 2 PESTICDE APPLICATION RECORD (PAR) DISTRICT __Omaha___ Date: ___________________ LOCATION _______________________ PROJECT __Gavins Point Project___ U.S. ARMY CORPS OF ENGINEERS Address: _PO Box 710___________ PEST CONTROL PROGRAM City: _Yankton, SD 57078_____ POST-APPLICATION DOCUMENTATION FORM Phone: _(402) 667-7873_________ CONTRACTOR ______________________ APPLICATOR _________________________ Address: _____________________________ Address: ______________________________ City: _____________________________ City: ______________________________ Phone: _____________________________ Phone: ______________________________ TARGET PEST _ ________________________________ ___________ Date of Application Time of Application Air Temp Relative Humidity Cloud Cover Wind Speed Wind Direction Acreage Treated : DESCRIPTION OF TREATED AREA ____________________________________________________ ____________________________________________________________________________________ PESTICIDE INFORMATION PESTICIDE (TRADE NAME) ___________________________________________________________ FORM APPLIED _____________________________________________________________________ ACTIVE INGREDIENTS _______________________________________________________________ ____________________________________________________________________________________ EPA REGISTRATION NUMBER ________________________________________________________ EPA CLASSIFICATION _______________________________________________________________ APPLICATION INFORMATION HOW THE PESTICIDE WAS MIXED ____________________________________________________ APPLICATION RATE _________________________________________________________________ AMOUNT APPLIED ____________________________________________________...

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS