This Solicitation opportunity from Pennsylvania was posted on January 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trench Paving Restoration Project In Association With The Water System Improvements 25-2

Closed
PennBid: 168192State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves extensive trench excavation, paving, and restoration work primarily focused on water main installations and roadway repairs within Pennsylvania, specifically for the Warminster Municipal Authority. The scope includes excavating and paving a total of approximately 22,000 linear feet of trenches at a 6-inch depth, along with the installation of water service laterals, and restoring various state highways with specific pavement layers and markings. An optional add-on covers temporary trench paving and additional excavation work, with multiple mobilizations planned. Bidders must submit detailed proposals using prescribed forms, accompanied by certified checks or bid bonds, and demonstrate compliance with Pennsylvania’s prevailing wage laws, employment verification, and responsible contractor requirements, including the use of qualified journeyperson workers. All work must adhere to PennDOT standards, and the successful bidder will be required to furnish performance and payment bonds or equivalent financial guarantees totaling 100% of the contract value. The project emphasizes safety, nondiscrimination, and legal employment practices, with the contract award based on the lowest responsible bid, though the authority retains the right to reject any or all bids or modify the scope. Bids will be reviewed over a 60-day period, with the main construction activities scheduled to commence in the fall of 2025. The overall project aims to improve water infrastructure and roadway conditions while ensuring compliance with all relevant federal, state, and local regulations.

General Info

Agency

Pennsylvania → Warminster Municipal Authority, Bucks County, PA

Place of Performance

PA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Warminster Municipal Authority, Bucks County, PA
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Warminster Municipal Authority, Bucks County, PA
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Base Contract will generally include the 6-inch depth of permanent longitudinal water main trench excavation and paving of eleven roadways (20,700 LF/3,340 tons); 6-inch depth of permanent water service lateral trench excavation and paving (1,300 LF/178 tons). The Base Contract will also include State Highway SR 0263 restoration of 8-inch depth H.E.S. concrete base course, 2 inches of 9.5 mm wearing course, and State Highway SR 2038 restoration of 5 inches 25 mm base course, 2.5 inches 19 mm binder course, and 1.5 inches 9.5 mm wearing course. The replacement of all pavement markings and traffic control of State and Township Roadways. Alternate/Add-On No. 1 will generally include 2-inch depth of temporary longitudinal and lateral trench paving (22,000 LF/1,250 tons). Alternate/Add-On No. 1 will also include 2-inch depth of trench excavation, traffic control of Township Roads, and 6 each mobilizations. All bids must include lump sum or unit prices to be considered for award by the Authority at their option after review of the bid amounts. Bids must be made on the forms furnished by the Authority and must be accompanied by a certified check, bank draft, or bid bond issued by a surety company licensed to conduct business in the Commonwealth of Pennsylvania, in the amount of at least ten percent (10%) of the total price bid made payable to the Authority. All work and materials shall be in accordance with PennDOT Standards and Specifications. Bids must be accompanied by a completed Bid Form, Bidder’s Qualification Statement, electronic copy of Bid Bond, executed Non-Collusion Affidavit, Public Works Verification Form, and fully executed Contractor/Subcontractor Responsibility Certification Form which certifies that the Contractor and Subcontractors meet the requirements of Warminster Municipal Authority’s First Amended Responsible Contractor Resolution No. 24-1. As a result, journeyperson worker(s) who have successfully completed a Class A Apprenticeship Program or apprentices registered in such a program of the craft labor are required to construct the project. Failure to submit fully completed and executed Forms may be considered justification for rejection of the bid. The bidder’s attention is called to the fact that the Pennsylvania Prevailing Wage Act and the Pennsylvania Public Works Employment Verification Act apply to this Contract if the estimated cost of the project is in excess of $25,000. The successful bidder shall pay no less than the wage rates determined for the project area as set forth in the Contract Documents. The successful bidder must also ensure that employees, subcontractors and applicants for employment are (a) not discriminated against because of their race, color, religion, sex or national origin, or on any other basis on which discrimination is prohibited by any applicable federal, state or local laws and, (b) legally authorized to work in the United States. The project is subject to the terms of the Public Works Employment Verification Act (Act 127 of 2012). Completed and signed “Public Works Employment Verification Form” is required as a precondition to the award of the Contract and is to be submitted as part of the submission of the bid. The successful bidder will be required to furnish separate bonds with corporate surety issued by companies authorized to do business in the Commonwealth of Pennsylvania on the prescribed forms dated the date of the Contract, or separate Federal or Commonwealth chartered lending institution irrevocable letters of credit in a form accepted and approved by the Authority, or separate restrictive or escrow accounts with such lending institutions pursuant to an escrow agreement accepted and approved by the Authority, each equal to one hundred percent (100%) of the Contract amount, to secure (a) the faithful performance and maintenance of the Contract; and (b) the prompt payment of materials and labor. Bidders are advised that all applicable provisions of the Occupational Safety and Health Act (Public Law 91-596, dated December 29, 1970, latest revision) shall be strictly adhered to on this project. Award of Contract, if a contract be awarded, will be to the lowest responsible bidder, but the Authority reserves the unqualified right to reject any or all bids and to waive any informalities. The Authority also reserves the right to delete any “item” or portion of an “item” contained in the Contract at its discretion, once bids are received. Prior to awarding the Contract, bids may be held by the Authority for a period not to exceed sixty (60) days from the date of the bid opening for the purpose of reviewing the bids and investigating the qualifications of bidders. During this period, no bid may be withdrawn. Please note, the base bid portion of the contract is not anticipated to be performed until the Fall of 2025.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS