Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trench Shield Equipment

Closed
W911WN25QA012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333120
New
DIBBS
RETRACTOR ASSEMBLY, WEA
Solicitation # SPE8EF-27-T-0173
Solicitation SPE8EF-27-T-0173 is a fixed-price request for quotations issued by the Defense Logistics Agency for the procurement of 119 units of Retractor Assembly, Weapon Cradle Adapter, identified by NSN 1740-01-140-7583. This is a critical application item that must adhere to specific source control drawings, requiring offerors not listed as approved sources to obtain OEM approval. The contract specifies a delivery period of 145 days, with a need ship date of April 4, 2027, and an original required delivery date of October 7, 2027. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, specifically the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The procurement incorporates stringent technical and quality standards, including the DLA Master List of Technical and Quality Requirements, which takes precedence over ASTM D3951 packaging standards. All shipments must be marked and labeled according to MIL-STD-129 and palletized per RP001. Compliance requirements include CMMC Level 2 Self-Assessment, NIST SP 800-171 DoD assessment requirements, and adherence to the Buy American Act and Berry Amendment. Administrative processing, including invoicing and receiving reports, must be conducted through the Wide Area WorkFlow system. This solicitation is not a small business set-aside.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

about 18 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract involves supplying a two-sided aluminum trench shielding system, commonly known as a trench box, designed for construction and excavation safety. The system must consist of stackable, buildable panels measuring two feet in height and ten feet in length, with the capability to reach a maximum height of eight feet when assembled. It includes components such as tongue and groove panels, corner posts, adjustable telescoping spreaders, and a pin and keeper fastening system for quick assembly and disassembly. The trench box must be lightweight, not exceeding 3,000 pounds, and equipped with lifting lugs for safe transportation. It should also allow for the addition of panels at open ends to accommodate various trench sizes. Delivery is required within 60 days of contract award, FOB destination to a specified location in Saltsburg, PA, with packaging to prevent damage during transit. The vendor must provide an operation and maintenance manual, spare parts list, and offer a one-year warranty on materials and workmanship. Additionally, manufacturer training on proper use and construction of the system is mandated. Technical inquiries can be directed to designated contacts, and quotes are exclusively accepted through the UNISON platform, emphasizing the small business set-aside status under NAICS code 333120.

General Info

Solicitation for aluminum trench shielding system by US Army Corps of Engineers, delivery in 60 days.

NAICS

333120 - Construction Machinery Manufacturing

Place of Performance

Saltsburg, PA, 15681, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Apr 2, 2025 to Apr 7, 2025. Set-aside added: Total Small Business Set-Aside (FAR 19.5).

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts

Full Description

Show more
QUOTES WILL ONLY BE ACCEPTED THROUGH UNISON Specification for Buildable Trench shielding System GENERAL REQUIREMENTS. These specifications establish the requirements to furnish a two-sided aluminum buildable panel trench shielding system. The shielding system, also known as a trench box, must be comprised of tongue and grove panels, corner posts, and an adjustable strut system. The system needs to be held together by pin and keeper system for easy set up and break down. The buildable panel box system must have panels two foot in height by ten foot long and be stackable up to eight foot in total height. The panel box requires four eight-foot-long corner posts, four telescoping spreaders having an adjustable range between 36 inches to 48 inches. The buildable panel box system must be secured by easily removable pins and keepers rated for use in the requested application. The trench box must have the ability to add panels to the open ends of the trench shoring system. The total weight of the buildable panel box system must not exceed 3,000 lbs. and must be movable using securely installed lifting lugs at the corners of the system. Training from the manufacturer on the proper use and construction of the trench shielding system is required. 1.1 The trench shielding system will be delivered to US Army Corps of Engineers 1665 Auen Road Saltsburg, PA 15681-8127 with the following salient characteristics: Panel Box Pins - multiple required for box assembly Panel Box Keepers (used to keep pins in place) Telescoping spreaders - 36 inches to 48 inches Panel Box Lifting Lugs - Mounted on top of box corners 96 Aluminum Corner Posts Aluminum Box Panels (2'X10) 2.0 SUBMITTALS. The vendor is required to submit one (1) copy of the Operation and Maintenance Manual, Owner's Manual, and Spare Parts List to the delivery location. 3.0 TECHNICAL QUESTIONS. Technical questions may be directed to Scott Bartholomew at +1 (555) 000-0000 or William Andree at +1 (555) 000-0000 during normal business hours of operation. 4.0 WARRANTY. The two-sided aluminum buildable panel trench shielding system shall have a manufacturer's warranty for material and/or workmanship for a period of one year from date of delivery. 5.0 DELIVERY. The two-sided aluminum buildable panel trench shielding system shall be crated, boxed, or otherwise packaged to the extent necessary to prevent damage during shipment. All costs for repair and or replacement of damaged parts during transportation and delivery is the responsibility of the vendor. 5.1 TIME OF DELIVERY. The Government requires delivery of the two-sided aluminum buildable panel trench shielding system within 60 days after the date of a written notice of contract award. 5.2 PLACE OF DELIVERY. The two-sided aluminum buildable panel trench shielding system supplied under this contract as specified in section 1.1 shall be delivered F.O.B. destination, transportation charges prepaid, to the following location: William Andree - Conemaugh River Lake 1665 Auen Road Saltsburg, PA 15681-8127 Telephone +1 (555) 000-0000 QUOTES WILL ONLY BE ACCEPTED THROUGH UNISON

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for a 100% Small Business Set-Aside project to replace the structural standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project, categorized under NAICS 238160, has a rough estimate between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of the existing roof system, box gutters, scuppers, and lightning protection, as well as the refurbishment of up to 95 linear feet of cold-formed metal sub-framing. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall, sealing and insulating the concrete roof slab to R-30, and installing a new gutter system and a certified, non-penetrating Lightning Protection System compliant with LPI 175, NFPA 780, and UL 96A. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Key personnel requirements include a Project Superintendent and a Quality Control System Manager, each with at least five years of relevant experience, and a Site Safety and Health Officer meeting EM 385-1-1 qualifications. Performance and payment bonds are required if the contract price exceeds $150,000. Final acceptance is contingent upon successful watertightness testing per AAMA 501:2 procedures and the delivery of a UL Master Label or LPI Certificate of Conformance.
Roofing Contractors

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
New
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS