Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Trenching, Conduit and Ground-well Installation

Active
19JM3727Q0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The US Embassy in Kingston, Jamaica, is soliciting proposals for a firm fixed price contract to perform infrastructure support work, specifically trenching, conduit, and ground-well installation at various locations within the embassy compound. The scope of work includes identifying and marking underground utilities, performing trenching across multiple identified locations, and installing Schedule 80 PVC conduit with a minimum 24-inch cover, transitioning to rigid galvanized steel above grade. The contractor is responsible for providing all labor, equipment, and supervision, including a qualified English-speaking supervisor with at least two years of experience. All work must adhere to strict technical standards, including the 2014 National Electrical Code, 2015 International Fire Code, 2019 OBO Design Standards, and the 1990 Americans with Disabilities Act. The anticipated period of performance is 21 days following the issuance of a Notice to Proceed, with work performed Monday through Friday during standard business hours. Award will be granted to the lowest priced, acceptable, and responsible quoter who meets all technical and organizational requirements. Eligible offerors must maintain active registration in the System for Award Management (SAM.gov) and provide proof of Local Insurance and Defense Base Act (DBA) insurance. Proposals must be submitted in PDF format and include a performance bar chart and a detailed business management and technical proposal outlining the firm's experience and past performance over the last three years. Final acceptance is contingent upon the work being completed in a satisfactory manner and the restoration of all work areas to pre-construction conditions.

General Info

US Embassy Kingston seeks a contractor for infrastructure trenching and conduit installation.

NAICS

238910 - Site Preparation Contractors

Place of Performance

Kingston, JM-02, JAM

Set-Aside

NONE

Documents

1

19JM3727Q0002 Trenching and Conduit Installation

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of State → US Embassy Kingston
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Office AddressWASHINGTON, DC, 20520, USA
Contacts
U.S. Embassy Kingston Procurement Office

Full Description

Show more

Description


The United Stated Embassy in Kingston is requesting proposals for Trenching, Conduit And Ground-Well Installation in various locations on the Embassy compound. The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job


Infrastructure Support System - Handhole / Underground Conduit System


Trenching


  • Nine locations have been identified requiring trench work.
  • Thirteen locations have been identified requiring trench work.
  • Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment.
  • If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding.

Trenching from Handholes


  • The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings.

Conduit


  • Existing conduit shall remain in place unless the drawings specifically direct removal or modification.
  • Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater.
  • All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends.
  • Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers.
  • The Contractor shall install pull lines in all new conduit runs.

Soil and Backfill Materials


Soil Materials


The Contractor shall provide all labor and materials for soil and backfill, where required.


  • Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter.
  • Asphalt/Concrete Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
  • Base Gravel: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
  • Sand Cushion: ASTM C 33 fine aggregate, natural or manufactured sand.

Placement and Compaction


  • Place backfill and fill in layers not exceeding:
    • 8 inches (203 mm) loose thickness for heavy compaction equipment;
    • 4 inches (102 mm) loose thickness when compacted by hand-operated tampers.
  • Place backfill and fill evenly to the required elevations, uniformly along their full length.
  • Compact soil materials to not less than the following percentages of maximum dry unit weight per ASTM D 1557:
    • Under lawns or unpaved areas: scarify and re-compact top 6 inches (152 mm) below subgrade and compact each layer to 85%.
    • Utility trenches: compact each layer of initial and final backfill to 85%.

Anticipated Period of Performance: a base period of twenty-one (21) days after contract award


Eligibility and Registration


Offerors must hold an active registration in the System for Award Management (SAM.gov) when they submit a proposal and at award.


Local Insurance and Defense Based Act (DBA) Insurance.


A site visit has been scheduled for Friday, November 06, 2026 at 10 a.m.


Offeror interested in attending must email contact@example.gov with the caption ‘TRENCHING - SITE VISIT’. To ensure access you are required to be approved prior to the visit. You are to provide the full names of the attendees, the vehicle information to include make, model, color and plate number of the vehicle being driven. The email must be sent no later than Wednesday, November 04, 2026 by 2 pm.


Completed proposal are to be email to contact@example.gov in PDF format by the deadline stipulated. 

Similar Contracts

Same NAICS industry code

More opportunities from Department Of State → US Embassy Kingston

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS