Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Trenchless Pipe Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves specialized underground utility installation for prime contractors working on California Department of Transportation highway projects. The scope of work focuses on the delivery and installation of 42 inch welded steel pipelines utilizing trenchless boring and jacking equipment. The solicitation is categorized under NAICS code 237990 and was posted on September 21, 2026. Interested parties must submit their responses by the deadline of November 10, 2026.

General Info

Subcontract for 42-inch steel pipeline installation on Caltrans projects; deadline November 10, 2026.

Documents

This scope was carved out of 02-0J5904.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Replace AC Surf, RHMA overlay, drainage, curb ramps, & electrical.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs specialized underground utility installation for prime contractors on Caltrans highway projects. Installs 42" welded steel pipe using trenchless boring and jacking equipment. Delivers installed underground steel pipeline.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 10 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 11 hours ago

DEADLINE

in about 1 year
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Alameda County In Berkeley And Albany From Heinz Avenue To 0.1 Mile South Of Contra Costa County Line
Solicitation # 04-2Y3014
Solicitation 04-2Y3014 is a construction project issued by the California Department of Transportation for work on State Highway 123 in Alameda County, specifically within Berkeley and Albany from Heinz Avenue to 0.1 mile south of the Contra Costa County Line. With an estimated value of 22 million dollars, the project scope encompasses comprehensive infrastructure improvements including the construction of sidewalks, curb ramps, asphalt and concrete pavement, and the installation of electrical and drainage systems. Additional requirements include earthwork involving barium contaminated soil, landscape planting, erosion control, and the installation of site furnishings such as bus shelters, bike racks, and trash receptacles. The project also necessitates a robust traffic control system, temporary barrier systems, and the implementation of a Lead Compliance Plan and a Stormwater Pollution Prevention Plan. Bids must be submitted on a unit price basis by December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates compliance with Buy America standards, prevailing wage rates, and specific environmental product declarations for asphalt and concrete. Performance requires a Level 2 Critical Path Method schedule and the designation of a certified on-site safety representative. Contractors must coordinate with various utility owners including PG&E, AT&T, Comcast, and EBMUD, and obtain necessary encroachment permits from the cities of Berkeley and Albany. Job site activities are expected to commence within 55 days of contract approval by the Attorney General.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County At Leggett From 0.1 Mile North Of Route 1 To The Humboldt County Line Near Piercy
Solicitation # 01-0J9904
Solicitation 01-0J9904 is a construction project issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project scope covers the segment from 0.1 mile north of Route 1 at Leggett to the Humboldt County line near Piercy, specifically between Post Mile T91.3 and T106.8. Key work activities include the placement of hot mix asphalt, replacement of signs, and improvements to drainage systems. The estimated cost for the project is 24 million dollars, with a required bid range of 140 to 200 working days. Bids are set to open on December 10, 2026, and job site activities must commence within 55 days of contract approval by the Attorney General. The contract is governed by 2025 Standard Specifications and Standard Plans, with specific modifications detailed in the Special Provisions across multiple divisions, including earthwork, surfacing, structures, and electrical work. Performance is subject to strict environmental and technical constraints, such as limiting work within drainage channels to the period between June 15 and October 15. Compliance requirements include Buy America/Build America standards, prevailing wage rates as determined by the California Department of Industrial Relations, and specific certifications for small businesses and Disabled Veteran Business Enterprises. Additionally, the contractor must designate an on-site safety representative and adhere to rigorous quality assurance standards for concrete and electrical components.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS