Trenchless Steel Pipe Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of large-diameter welded steel pipe culverts for prime contractors on Caltrans District 2 projects. The scope of work focuses on the use of trenchless methods, specifically the jacking and pushing of 60-inch welded steel pipes. A critical technical requirement is the execution of full bead, airtight, and continuous welding of all pipe joints to ensure structural integrity. To qualify for this work, all welders must be certified under AWS D1.1 and maintain strict compliance with section 19-16. The project falls under NAICS code 238910 and is managed through the California Department of Transportation. Interested parties must submit their responses by the deadline of December 2, 2026.

General Info

Subcontract for Caltrans District 2 trenchless steel pipe installation; AWS D1.1 certification required.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 02-0J53U4.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cold plane and place HMA, replace culverts and replace delineation.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs large-diameter welded steel pipes for prime contractors on Caltrans District 2 projects using trenchless methods. Performs jacking and pushing of 60" welded steel pipe and executes full bead, airtight, continuous welding of pipe joints. Requires welders qualified under AWS D1.1 and compliance with section 19-16. Delivers installed 60" welded steel pipe culverts.

Similar Contracts

Same NAICS industry code

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
Solicitation 08-1N8804 is a construction project issued by the California Department of Transportation for work on a state highway in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and involves the installation of hot mix asphalt, imported borrow, and signal and lighting systems. Key technical deliverables include the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and the integration of network equipment at the Inland Empire Transportation Management Center. The estimated cost of the project is 3,530,000 dollars, with bids required on a unit price basis. The contract mandates strict adherence to Buy America standards per 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing manufacturer certificates of compliance and ensuring hardware meets NEMA TS-1/TS-2 and IEEE 802.3 standards. Environmental and safety requirements include MASH compliance for highway safety features and certifications from a registered civil engineer or professional geologist regarding pH and lead levels in local materials. Additionally, the project requires the payment of prevailing wages as determined by the California Department of Industrial Relations and includes specific submittal requirements for Disabled Veteran Business Enterprise quotes. Final acceptance is contingent upon the successful completion of physical, performance, and functional tests, including specific network metrics such as latency and packet loss.
Highway, Street, and Bridge Construction

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS