Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TRINITY RIVER AUTHORITY: ROCRWS Phase 2 Expansion CMAR - PP#3 - Early Site Work & Utility Relocation

Closed
6ab29661e16629b408f9b794State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Trinity River Authority of Texas is soliciting bids for Package 3 of the Red Oak Creek Regional Wastewater System expansion in Irving, Texas. This specific scope focuses on early site work and utility relocation necessary to prepare the facility for subsequent expansion phases. The overarching project aims to increase the system capacity from 6.0 MGD to 12.0 MGD through a two-phase approach. While Phase 1 focuses on increasing capacity to 8.0 MGD via peak flow storage tanks, aeration basin modifications, and pump upgrades, Phase 2 will further expand capacity to 12.0 MGD through the construction of a new administration building, influent screen facilities, and enhanced disinfection and filtration systems. This solicitation, identified by number 6ab29661e16629b408f9b794, was posted on September 25, 2026, with a response deadline of October 22, 2026. The project falls under NAICS code 237110 for heavy and civil engineering construction. Interested parties should coordinate with the primary point of contact, Clayton Thompson, regarding the CMAR delivery method for these early site works.

General Info

Bids for Red Oak Creek wastewater expansion early site work and utility relocation.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTrinity River Authority of Texas (TRA)
Contacts1 person available
OfficeN/A

Full Description

Show more
Scope Package 3 Early Site Work and Utility Relocation to prepare the site for the next phase of expansion. See Contract Documents for specific scope included in this Package. Work of this Project generally includes expansion of the Red Oak Creek Regional Wastewater System from 6.0 MGD to 12.0 MGD. The project will include two Phases, Phase 1 Expansion from 6.0 to 8.0 MGD is needed as the first priority (currently under construction), followed by Phase 2 Expansion from 8.0 to 12.0 MGD (work packages expected in 2027 and 2028). More specifically, the Work includes, but is not limited to, construction of the following: PHASE 1 6.0 to 8.0 MGD Expansion 1. Add 2ea Peak Flow Storage Tanks (7MG each), including yard piping, odor control system, electrical, instrumentation and controls. 2. Expand existing Aeration Basin 1C to match existing Train 2 operation. 3. Modify Aeration Basins 1A, 1B, 1C and 2 4. Modify Influent Splitter Box 5. Add a 7.5 MGD pump at Lift Station No. 2 inlcuding connection to existing header, piping and valves. PHASE 2 8.0 to 12.0 MGD Expansion 1. Add a new Administration/Lab Building adjacent to the existing building 2. Add a new influent coarse screen facility and all necessary underground utility modifications 3. Influent Pump Station Modifications to increase the firm capacity from 15 MGD to 42 MGD 4. Add a third drum screen and a third grit removal unit at the Headworks Facility 5. Add additional aeration basin (new trains), secondary clarifiers, RAS/WAS Pump Station and supporting facilities 6. Add clarifier influent and effluent splitter box 7. Add new UV disinfection and Filtration Facilities to handle a capacity up to 42 MGD

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS