Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

TRINITY RIVER AUTHORITY: ROCRWS Phase 2 Expansion CMAR - PP#3 - Early Site Work & Utility Relocation

Active
6ab29661e16629b408f9b794State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Trinity River Authority of Texas is soliciting bids for Work Package No. 3, focusing on early site work and utility relocation to prepare for the expansion of the Red Oak Creek Regional Wastewater System. The overall project aims to increase system capacity from 6.0 MGD to 12.0 MGD through two distinct phases. Phase 1, which is currently under construction, focuses on expanding capacity to 8.0 MGD via the addition of peak flow storage tanks, aeration basin modifications, and pump upgrades at Lift Station No. 2. Phase 2 will expand the system further to 12.0 MGD with work packages expected in 2027 and 2028. This phase includes the construction of a new administration and lab building, an influent coarse screen facility, and significant modifications to the influent pump station to increase firm capacity to 42 MGD. Additional scope involves adding a third drum screen and grit removal unit, new aeration basins, secondary clarifiers, and new UV disinfection and filtration facilities. The project is located in Irving, Texas, with responses due by October 22, 2026.

General Info

Trinity River Authority seeks bids for Red Oak Creek wastewater system site work.

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTrinity River Authority of Texas (TRA)
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Clayton Thompson

Full Description

Show more
WORK PACKAGE No. 3 - EARLY SITE WORK AND UTILITY RELOCATION Scope Package 3 Early Site Work and Utility Relocation to prepare the site for the next phase of expansion. See Contract Documents for specific scope included in this Package. Work of this Project generally includes expansion of the Red Oak Creek Regional Wastewater System from 6.0 MGD to 12.0 MGD. The project will include two Phases, Phase 1 Expansion from 6.0 to 8.0 MGD is needed as the first priority (currently under construction), followed by Phase 2 Expansion from 8.0 to 12.0 MGD (work packages expected in 2027 and 2028). More specifically, the Work includes, but is not limited to, construction of the following: PHASE 1 6.0 to 8.0 MGD Expansion 1. Add 2ea Peak Flow Storage Tanks (7MG each), including yard piping, odor control system, electrical, instrumentation and controls. 2. Expand existing Aeration Basin 1C to match existing Train 2 operation. 3. Modify Aeration Basins 1A, 1B, 1C and 2 4. Modify Influent Splitter Box 5. Add a 7.5 MGD pump at Lift Station No. 2 inlcuding connection to existing header, piping and valves. PHASE 2 8.0 to 12.0 MGD Expansion 1. Add a new Administration/Lab Building adjacent to the existing building 2. Add a new influent coarse screen facility and all necessary underground utility modifications 3. Influent Pump Station Modifications to increase the firm capacity from 15 MGD to 42 MGD 4. Add a third drum screen and a third grit removal unit at the Headworks Facility 5. Add additional aeration basin (new trains), secondary clarifiers, RAS/WAS Pump Station and supporting facilities 6. Add clarifier influent and effluent splitter box 7. Add new UV disinfection and Filtration Facilities to handle a capacity up to 42 MGD

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive water infrastructure installation managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope also encompasses electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The project emphasizes the inclusion of minority, women, and disadvantaged business enterprises, offering assistance with bonding, insurance, and materials to maximize their participation.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity targeting DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the use of consortia for larger contract portions. Eligible subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors must agree to the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company. The prime contractor may require payment and performance bonds totaling 100 percent of the bid, with bond premiums reimbursed up to a maximum of 1.5 percent. The primary point of contact for this solicitation is Matt Metoyer, Estimating Manager.
W.A. Rasic Construction Company

POSTED

about 4 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Trinity River Authority of Texas (TRA)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS