TRINITY RIVER AUTHORITY: ROCRWS Phase 2 Expansion CMAR - PP#4 - Electrical Equipment Procurement & Utility Relocation

Active
6ab6bc17d7403d11954afd8fState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Trinity River Authority of Texas is soliciting bids for Work Package No. 4 of the Red Oak Creek Regional Wastewater System expansion project in Irving, Texas. This specific package focuses on electrical equipment procurement and utility relocation as part of the early site work required to prepare for the next phase of expansion. The broader project aims to increase the system capacity from 6.0 MGD to 12.0 MGD through a two-phase approach. Phase 1, which is currently under construction, involves expanding capacity to 8.0 MGD by adding peak flow storage tanks, expanding aeration basins, and installing a new pump at Lift Station No. 2. Phase 2, with work packages expected in 2027 and 2028, will further increase capacity to 12.0 MGD. This phase includes the construction of a new administration and lab building, influent pump station modifications to increase firm capacity to 42 MGD, and the addition of new UV disinfection and filtration facilities. Responses for this solicitation are due by October 22, 2026.

General Info

Bids for Red Oak Creek electrical procurement and utility relocation due October 22, 2026.

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTrinity River Authority of Texas (TRA)
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Clayton Thompson

Full Description

Show more
WORK PACKAGE No. 4 - ELECTRICAL EQUIPMENT PROCUREMENT AND UTILITY RELOCATION Scope Package 3 Early Site Work and Utility Relocation to prepare the site for the next phase of expansion. See Contract Documents for specific scope included in this Package. Work of this Project generally includes expansion of the Red Oak Creek Regional Wastewater System from 6.0 MGD to 12.0 MGD. The project will include two Phases, Phase 1 Expansion from 6.0 to 8.0 MGD is needed as the first priority (currently under construction), followed by Phase 2 Expansion from 8.0 to 12.0 MGD (work packages expected in 2027 and 2028). More specifically, the Work includes, but is not limited to, construction of the following: PHASE 1 6.0 to 8.0 MGD Expansion 1. Add 2ea Peak Flow Storage Tanks (7MG each), including yard piping, odor control system, electrical, instrumentation and controls. 2. Expand existing Aeration Basin 1C to match existing Train 2 operation. 3. Modify Aeration Basins 1A, 1B, 1C and 2 4. Modify Influent Splitter Box 5. Add a 7.5 MGD pump at Lift Station No. 2 inlcuding connection to existing header, piping and valves. PHASE 2 8.0 to 12.0 MGD Expansion 1. Add a new Administration/Lab Building adjacent to the existing building 2. Add a new influent coarse screen facility and all necessary underground utility modifications 3. Influent Pump Station Modifications to increase the firm capacity from 15 MGD to 42 MGD 4. Add a third drum screen and a third grit removal unit at the Headworks Facility 5. Add additional aeration basin (new trains), secondary clarifiers, RAS/WAS Pump Station and supporting facilities 6. Add clarifier influent and effluent splitter box 7. Add new UV disinfection and Filtration Facilities to handle a capacity up to 42 MGD

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40ft x 8ft steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the US Virgin Islands to support forensic science technicians. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and the integration of climate control via split-system A/C units, R-11 insulation, vinyl flooring, and LED lighting. Security requirements specify steel doors with Cypher locks and security windows, while safety compliance requires the installation of 5-pound ABC fire extinguishers. The contractor is responsible for connecting the units to the nearest electrical circuit using 2-inch PVC or uPVC conduit and must ensure all materials comply with the Buy America Act. The contract is a firm-fixed-price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between $250,000 and $300,000. The total period of performance is 364 calendar days from the Notice to Proceed, with a project schedule due within 15 days of that notice. Award is based on the lowest total evaluated price, though proposals are evaluated on technical approach and safety and quality control plans. Administrative requirements include the use of the Invoice Processing Platform for payments, submission of certified payroll per wage determination VI20260001, and strict adherence to DHS security protocols, including the signing of non-disclosure agreements and completion of cybersecurity training for personnel.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
Management and Training Corporation, operating the Earle C. Clements Job Corps Center in Morganfield, Kentucky, is soliciting bids for a fixed-price, single lump sum contract to replace existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling. The project involves removing retired aerial fiber lines and splice boxes from utility poles and building 2436, and installing new 12 strand single mode aerial fiber to provide network connectivity between the building 2436 network closet and the building 2443 maintenance office. The contractor is responsible for providing all labor, equipment, and materials, including Belden FS3L0024NS fiber or an equivalent brand, fiber supports, enclosures, adapter panels, and lift rentals. Bids are due by October 5, 2026, and will be evaluated based on overall best value. To be considered, bidders must complete a physical site visit, submit a bid breakout, and provide a bid bond guarantee, cashier's check, or money order. Performance and payment bonds from a surety with at least an A- rating are required if the base bid is $25,000 or greater. The contract is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Awardees must comply with federal regulations, including the Davis-Bacon Act for prevailing wages, FAR clauses regarding the combating of trafficking in persons, and strict government guidelines for the protection of sensitive and proprietary information.
Earle C. Clements Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Trinity River Authority of Texas (TRA)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS