Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TRINITY RIVER AUTHORITY: ROCRWS Phase 2 Expansion CMAR - PP#6 - Aeration Blower Equipment Procurement (RFP)

Closed
6ab6cb10d7403d11954afdd5State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
FAN, VANEAXIAL
Solicitation # SPE8E9-27-Q-0113
Solicitation SPE8E9-27-Q-0113 is a fixed-price, small business set-aside procurement issued by the DLA Troop Support Construction and Equipment MRO Service I for two vane-axial fans (NSN 4140-00-554-8187). The required equipment must be AC, 440 volts, 60 cycles, and three-phase, adhering to the MIL-PRF-18953 Rev C technical specifications and Qualified Products List (QPL) requirements. The items are designated as critical application items, and the manufacturer must be QPL approved at the time of contract award. Delivery is required within 60 days after order (ADO) to DLA Distribution San Diego, with inspection and acceptance occurring at the destination. The contract mandates strict packaging and marking standards, requiring compliance with MIL-PRF-18953 Rev C, MIL-STD-129, and DLA packaging requirements RP001. Contractors are instructed to avoid plastics for wrapping or cushioning where possible. The procurement includes several critical regulatory clauses, including prohibitions on the intentional addition of mercury, requirements for sustainable products, and adherence to the Buy American and Balance of Payments Program. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing and payment processing. Security and data protections are governed by DFARS clauses regarding Controlled Unclassified Information (CUI) and the prohibition of contracting with entities that lobby for Chinese military companies.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 333413
New
Federal
PASSAGE WAY FAN, EXHAUST
Solicitation # 70ZU0127P21005B00
The United States Coast Guard Surface Forces Logistics Center is seeking quotations for 18 axial exhaust passage way fans, identified by NSN 2930-33-215-1651 and OEM part number CMP/MAR-820-2T, manufactured by SODECA S.A. This is a total small business set-aside procurement to be awarded as a firm fixed price purchase order on a best value basis, considering technical requirements, delivery timelines, and price. To be eligible for award, vendors must be authorized distributors of Novenco products and provide valid documentation of this status with their quotation. Strict packaging and preservation requirements are mandatory, as standard commercial packaging is unacceptable. Items must be individually preserved and packaged according to MIL-STD-2073-1E Method 10 using specific ASTM-approved wood-cleated panel-board, heavy-duty screwed wooden boxes, or double-wall fiberboard boxes. Any crates exceeding 50 lbs must be skid-mounted or palletized for forklift use. Delivery is F.O.B. Destination to the Surface Forces Logistics Center in Baltimore, Maryland. Quotes must be submitted via email to Courtney Gustin by November 17, 2026, at 10:00 am Eastern time, and must include the specific solicitation number 70ZU0127P21005B00 in the subject line along with required corporate entity disclosures and FAR 52.212-3 representations and certifications.
CG-SEA-C21

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Trinity River Authority of Texas is soliciting bids for Package No. 6, focusing on the procurement of aeration blower equipment for the Red Oak Creek Regional Wastewater System expansion in Irving, Texas. This procurement is part of a larger two-phase project designed to increase the system's capacity from 6.0 MGD to 12.0 MGD. While Phase 1 focuses on the initial expansion to 8.0 MGD and is currently under construction, this specific package supports the Phase 2 expansion, which is scheduled for 2027 and 2028. The broader scope of the project includes significant infrastructure upgrades such as the addition of a new administration and lab building, an influent coarse screen facility, and modifications to the influent pump station to increase firm capacity to 42 MGD. Additional work involves installing a third drum screen and grit removal unit, new aeration basins, secondary clarifiers, and UV disinfection and filtration facilities. Responses for this specific equipment procurement are due by October 22, 2026.

General Info

Trinity River Authority seeks aeration blower bids for Red Oak Creek expansion by 2026.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTrinity River Authority of Texas (TRA)
Contacts1 person available
OfficeN/A

Full Description

Show more
PACKAGE No. 6 - AERATION BLOWER EQUIPMENT PROCURMENT (RFP) Scope Package 3 Early Site Work and Utility Relocation to prepare the site for the next phase of expansion. See Contract Documents for specific scope included in this Package. Work of this Project generally includes expansion of the Red Oak Creek Regional Wastewater System from 6.0 MGD to 12.0 MGD. The project will include two Phases, Phase 1 Expansion from 6.0 to 8.0 MGD is needed as the first priority (currently under construction), followed by Phase 2 Expansion from 8.0 to 12.0 MGD (work packages expected in 2027 and 2028). More specifically, the Work includes, but is not limited to, construction of the following: PHASE 1 6.0 to 8.0 MGD Expansion 1. Add 2ea Peak Flow Storage Tanks (7MG each), including yard piping, odor control system, electrical, instrumentation and controls. 2. Expand existing Aeration Basin 1C to match existing Train 2 operation. 3. Modify Aeration Basins 1A, 1B, 1C and 2 4. Modify Influent Splitter Box 5. Add a 7.5 MGD pump at Lift Station No. 2 inlcuding connection to existing header, piping and valves. PHASE 2 8.0 to 12.0 MGD Expansion 1. Add a new Administration/Lab Building adjacent to the existing building 2. Add a new influent coarse screen facility and all necessary underground utility modifications 3. Influent Pump Station Modifications to increase the firm capacity from 15 MGD to 42 MGD 4. Add a third drum screen and a third grit removal unit at the Headworks Facility 5. Add additional aeration basin (new trains), secondary clarifiers, RAS/WAS Pump Station and supporting facilities 6. Add clarifier influent and effluent splitter box 7. Add new UV disinfection and Filtration Facilities to handle a capacity up to 42 MGD

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS