Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on August 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trinity River Authority Technical Proposal CRWS Chlorine and Sulfur Dioxide Containment Building

Closed
3110.2163State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 8 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves a comprehensive scope of work focused on the demolition, modification, and construction related to the chlorine and sulfur dioxide handling facilities at the Trinity River Authority's site in Texas. Key activities include demolishing existing railcar unloading stations, abandoned sulfur dioxide storage areas, and various effluent and drainage structures. The project also entails modifying multiple contact basins, buildings, pump stations, and associated piping systems to enhance operational efficiency and safety. Additionally, new containment buildings for chlorine and sulfur dioxide, a supplemental chlorine storage facility, and a plant service water pump station will be constructed, along with stormwater management infrastructure, site grading, paving, and electrical and instrumentation systems, including transformers and generators. The project is valued between five and fifteen million dollars and is scheduled for response submission by October 7, 2025. It is managed by the Trinity River Authority of Texas, with primary contact Theodore Chan. The work aims to upgrade and expand the existing chemical handling and water treatment facilities, ensuring improved safety, environmental compliance, and operational capacity. The solicitation is open for qualified contractors to submit proposals through the designated platform, with detailed project information available online.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTrinity River Authority of Texas
Contacts1 person available
OfficeN/A

Full Description

Show more
The Project scope includes the following major items:
Demolition of Chlorine and Sulfur Dioxide Railcar Unloading Stations and Visual Barriers Abandoned Sulfur Dioxide Bulk Storage and Containment Area Demolition of Dechlorination Drainage Box Demolition of Effluent Filters 17-30 Chlorination Shed Modification of Chlorine Contact Basin Influent Box and Channel Modification of Chlorine Contact Basins Modification of Dechlorination Effluent Channel Modification of Chlorine Building Modification of Dechlorination Building Modification of Pump Station 13 Chlorination Building Modification of Pump Station 13A Wet Well Modification of Pump Station 13B Wet Well Modification of Chlorine solution injections to Effluent Filters Modification of Effluent Filters 15 and 16 Modification of Pump Station 14 Construction of new Chlorine and Sulfur Dioxide Containment Building Construction of Supplemental Chlorine Storage Building Construction of Dedicated Plant Service Water Pump Station 14A Construction of Stormwater Pump Station 27 Site work, grading, paving, stormwater drainage, and roads Chemical solution, plant water (W1, W2, W3, and W5), drain, storm water, and natural gas piping Electrical and instrumentation with associated substation transformers and generator

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS