Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 10, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trunnion Girder Concrete Repairs at Jennings Randolph Lake Dam

Awarded
W912DR18B0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The Trunnion Girder Concrete Repairs at Jennings Randolph Lake Dam project, managed by the Department of Defense W2SD Endist Baltimore, involves repairing deteriorated concrete surfaces on six trunnion girders and applying a waterproof coating system to the trunnion platforms in the emergency spillway area of Garrett County, Maryland. The scope of work includes the removal and replacement of hand railings and light posts, the capping of security conduits, and the use of Ground Penetrating Radar to locate steel reinforcements before demolition. Technical requirements specify the use of Type K Shrinkage-Compensating Concrete and No. 4 Fiber Reinforced Polymer bars for the new concrete caps, followed by the application of an elastomeric polymer modified cementitious waterproof coating. The contractor is responsible for providing all labor, materials, equipment, and transportation necessary to complete the project according to government specifications. A critical operational requirement is the sequencing of work to ensure at least two tainter gates remain operable at all times for high water event management. The project timeline includes the submission of pre-work documents within 30 calendar days of the Notice to Proceed, with a total construction duration of approximately 180 calendar days.

General Info

Contract Value

$191,648.98

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MD, USA

Set-Aside

NONE

Award Issued Date

Documents

2

W912DR18B0010_061418.pdf

PDF

W912DR18B0010_BID_ABSTRACT_071718.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts2 people available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA
Contacts
Vincent GierContract Specialist
Patricia MorrowContracting Officer

Full Description

Show more
Jennings Randolph Lake is located on the MD/WV border in Garrett County, MD and Mineral County WV. It is approximately eight miles upstream of Bloomington, MD, and approximately five miles north of Elk Garden, WV. All of the construction will be in Garrett County, MD. The purpose of this contract is to repair the deteriorated concrete surfaces of the six trunnion girders and apply an elastomeric polymer modified cementitious waterproof coating system to the trunnion platforms for each pier located within the emergency spillway area. The project consists of the demolition, construction and installation of the following: 1. Hand railings, light posts, and associated power conduits to be removed, stored, and replaced after repairs (typical for all trunnion girders). 2. Security conduits to be removed from trunnion girder platform and capped upon the vertical pier above trunnion platform (typical for trunnion girders #1 and #6). 3. Concrete Scanning - Ground Penetrating Radar (GPR): Prior to concrete removal, the concrete surfaces shall be scanned utilizing a hand held ground penetrating radar device in accordance with ASTM D 6432 to identify the depth and location of steel rebar, prestress bars and steel pipe conduit, trunnion yokes and anchor rod assemblies, etc. to ensure that these items are avoided and not disturbed during demolition of existing concrete. 4. Remove and replace concrete cap with Type K Shrinkage-Compensating Concrete to horizontal construction joint (typical for all trunnion girders). 5. Fiber Reinforced Polymer (FRP) Reinforcement: Reinforcement for the new trunnion girder "concrete caps" shall be No. 4 FRP bars spaced at 12-inches on center each way and shall be installed throughout the entire trunnion girder repair area. 6. Apply an elastomeric polymer modified cementitious waterproof coating upon the trunnion platforms located adjacent (just upstream) to the trunnion girders. 7. In order for the dam operator to maintain control of the tainter gates during an unexpected high water event, the Contractor shall sequence his work to ensure that a minimum of two (2) gates are always operable at any given time. 8. For more details see the photographs below. Government Supplied Materials Constructions plans and specifications (solicitation). Project Assumptions Contractor is required to supply all labor, materials, equipment, and transportation to complete the construction of the Government furnished plans and specifications. Contract Deliverable Provide a completed project per the Government furnished plans and specifications.? Submission Requirements and Timeline Provide pre-work submittals within 30 calendar days following Notice to Proceed. Construction duration will be approximately 180 calendar days.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
The Mid-Bay James Island Restoration Phase 2 is a firm fixed price construction project managed by the U.S. Army Corps of Engineers, Baltimore District. Located in Dorchester County, Maryland, this ecosystem restoration effort takes place in a remote area of the middle Chesapeake Bay accessible only by boat. The project has an estimated magnitude of construction between 150 million and 250 million dollars, with an anticipated period of performance of 1095 calendar days from the date of the Notice to Proceed. The scope of work involves three primary features: the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand; the excavation and stockpiling of approximately 650,000 cubic yards of sand from a local borrow area; and the installation of spillway structures for controlled water release. Key material requirements include various weights of armor stone ranging from 450 to 3300 pounds. The contractor is responsible for all labor, equipment, and transportation, and must maintain a Quality Control Manager on-site at all times. Administrative requirements include the submission of bids via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Award evaluations include a 10 percent price preference for HUBZone small business concerns. The contract mandates strict adherence to safety and environmental regulations, including EPA 40 CFR 112 for POL products and EM 385-1-1 for safety and health. Additionally, the contractor must conduct formal partnering sessions within 35 to 45 days of the award and provide necessary performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS