TUBE ASSEMBLY, METAL
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract is for the procurement of 11 metal tube assemblies under solicitation SPE7M4-26-T-291N, with a delivery requirement of 120 days and FOB origin terms. The contract mandates strict adherence to Defense Logistics Agency technical and quality requirements referenced from the DLA Master List, with all components subject to Qualified Products Lists or Qualified Manufacturers Lists as applicable. First article testing is required for three units, but the approved first article cannot be shipped as a new part, and the number of units specified for testing is definitive. The product must not contain any ozone-depleting chemicals, and any substitute chemicals require prior approval. All packaging must comply with ASTM D3951 and MIL-STD-129, with palletization following DLA packaging guidelines, and the DLA Master List takes precedence over ASTM standards. Inspection and acceptance occur at the origin, with zero non-conformances required in sampling under MIL-STD-1916 or comparable zero-based plans, assigning verification levels based on attribute criticality. The contract is a total small business set-aside under NAICS code 331210, and offerors must certify compliance with all QPL/QML requirements, submitting only approved components. One line item specifies the supply of 10 units at a unit price of $11.00, while a separate line item for one unit is designated solely for the first article test, priced at $1.00, with no separate charge assumed if not quoted. The first article test requirement is governed by FAR clause 52.209-3, and if waived, no payment shall be made for that line. Delivery is directed to the DLA Distribution facility in New Cumberland, Pennsylvania, with no quantity variance permitted. The contract prohibits the use of government identification on rejected supplies and requires tailored higher-level quality requirements applicable to both manufacturers and non-manufacturers. All documentation, including assembly drawings, reference specifications dated October 2, 2019, and the original revision dated November 25, 2009, must be strictly followed. The contract does not allow for the use of non-compliant materials or methods, and full and open competition was conducted under a small business set-aside. The point of contact for inquiries is Lorenzo Rankins at the Department of Defense’s Fluid Handling Division.
General Info
Agency
NAICS
Place of Performance
2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
TUBE ASSEMBLY, METAL
CONTRACTOR FIRST ARTICLE TESTING APPLIES. 3 EA The approved first Article SHALL NOT serve as a Manufacturing Standard because it CANNOT be shipped in as a New Part.
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
FULL AND OPEN COMPETITION APPLY
ASSEMBLY DRAWING
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
(MANUFACTURERS AND NON-MANUFACTURERS)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS
LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A
SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR
QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN
PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED
MANUFACTURERS LIST (QML)" APPLY.
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
SPE7M4-26-T-291N
SECTION B
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST MEET QPL/QML
REQUIREMENTS. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE
QPL/QML COMPONENTS ONLY FROM SOURCES QUALIFIED ON THE APPLICABLE
QPL(S)/QML(S).
TDP Rev A Gen 1 IAW BASIC DRAWING NR 19207 12496707 REVISION NR D DTD 11/25/2009 PART PIECE NUMBER:
TDP Rev A Gen 1 IAW REFERENCE DRAWING NR 19207 12496707 REVISION NR DTD 10/02/2019 PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7011409578 0001 EA 11.000
NSN/MATERIAL:4710015672452
DELIVERY (IN DAYS):0120
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
W25G1U
SPE7M4-26-T-291N
SECTION B
PR: 7011409578 PRLI: 0001 CONT’D
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Need Ship Date:09/09/2025 Original Required Delivery Date:03/04/2026
CONTRACTOR FIRST ARTICLE TEST THE NUMBER OF UNITS SHOWN SIGNIFIES THE
TEST REQUIREMENT. SEE FAR CLAUSE 52.209-3 CITED IN SECTION A OF THIS
SOLICITATION FOR THE ACTUAL QUANTITY REQUIRED.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0002 0000000000 EA 1.000
NSN/MATERIAL:0001S00000053
DELIVERY (IN DAYS):0060
THIS LINE ITEM SIGNIFIES THE FIRST ARTICLE TEST REQUIREMENT (FAT). SEE
CLAUSES FOR INFORMATION CONCERNING THE FAT REQUIREMENT. OFFERS THAT DO
NOT CITE A PRICE FOR THIS LINE ITEM SHALL BE EVALUATED UNDER THE
ASSUMPTION THAT THERE IS NO SEPARATE CHARGE FOR THE FAT. IN THE EVENT
THE FAT REQUIREMENT IS WAIVED, NO AWARD WILL BE MADE FOR THIS LINE ITEM.
THE NUMBER OF UNITS SHOWN APPEARS AS “1 EA”. THIS QUANTITY SIGNIFIES
THE TEST REQUIREMENT. OFFERORS WILL FIND THE ACTUAL QUANTITY REQUIRED
BY THE GOVERNMENT FOR THE FAT LINE ITEM PER FAR 52.209-3 OR 52.209-4 IN
SECTION A OF THIS SOLICITATION.
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
SPE7M4-26-T-291N
SECTION B
PR: PRLI: CONT’D
ACCEPTANCE POINT: ORIGIN
Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000
SPE7M4-26-T-291N NSN/Part Number: 4710-01-567-2452 Quantity: 11 EA Purchase Request: 7011409578QTY: 11 Delivery: 120 days ADO
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → FLUID HANDLING DIVISION
Same awarding agency