This Solicitation opportunity from Department Of Defense was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
TUBE ASSEMBLY, METAL
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation SPE7M4-26-Q-0806, issued by the Defense Logistics Agency Fluid Handling Division, is for the procurement of 49 metal tube assemblies (NSN 4710-00-283-4999). The contract requires delivery within 360 days after receipt of order to DLA Distribution Red River in Texarkana, Texas. Performance is subject to strict quality and security standards, including SAE AS9100 higher-level quality requirements, CMMC Level 2 certification via a Third-Party Assessment Organization, and compliance with ITAR or EAR export controls. All invoicing must be processed electronically through Wide Area WorkFlow. A critical component of this contract is the First Article Testing (FAT) requirement. The contractor must provide three first article parts, two of which count toward the production quantity and one additional part for destructive testing. Testing and inspection must adhere to LPF-QAR-003, with required test plans and reports preferably submitted in PDF format on ISO-10149 compliant CD-ROMs. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129. Inspection is conducted at the source, while acceptance typically occurs at the destination. Additional special requirements include DPAS rating prioritization and strict hazard warning labeling per DFARS 252.223-7001.
General Info
Place of Performance
10TH STREET AND K AVENUE, TEXARKANA, TX, 75507-5000, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)
TEST PLAN REQUIRED
TEST REPORT REQUIRED
CONTRACTOR FIRST ARTICLE REQUIRED First Article Quantity is 3 parts: -2 parts will be part of production quantity -1 part will be in addition to production quantity Block 9.B First article test requirements shall be per LPF-QAR-003 and the following: -a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003. -b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly. -c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003. -NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format. Block 10. Disposition of First Articles: -1 First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for Manufacturers and Non-Manufacturers
RD002, COVERED DEFENSE INFORMATION APPLIES
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
SPE7M4-26-Q-0806
SECTION B
SUPPLY/SERVICE: 4710-00-283-4999 CONT'D
RQ032: EXPORT CONTROL OF TECHNICAL DATA
This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.
The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. NSN/Part Number: 4710-00-283-4999 Quantity: 49 EA Delivery: 360 days ADO
More opportunities from Department Of Defense → FLUID HANDLING DIVISION
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
