Tulelake Irrigation District Infrastructure Modernization Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tulelake Irrigation District Infrastructure Modernization Project is a presolicitation initiative led by the USDA Natural Resources Conservation Service under the Watershed Protection and Flood Prevention Act. Located in Tulelake, California, the project aims to enhance agricultural water management, energy efficiency, and delivery reliability for 924 patron accounts as well as the Tule Lake and Lower Klamath National Wildlife Refuges. The preferred modernization alternative involves upgrading pumps and motors at 28 locations, implementing variable frequency drives, and installing SCADA and automation equipment across 74 sites. These improvements are designed to reduce operational spills and maintenance costs while ensuring minimal ground disturbance by remaining within existing rights-of-way. The total estimated cost for the project is 16,302,000 dollars, with 12,533,000 dollars requested through PL 83-566 funding. A Draft Watershed Plan-Environmental Assessment was prepared in September 2026 to fulfill NEPA requirements, concluding that an environmental impact statement is not necessary. A public review period for the assessment was scheduled from October 1 to October 31, 2026. Coordination for the project involves multiple agencies, including the USDA, the U.S. Fish and Wildlife Service, and the Bureau of Reclamation.

General Info

Agency

California Agriculture, United States Department of

Place of Performance

Tulelake, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Agriculture, United States Department of
Contacts4 people available
OfficeN/A
Organization / Agency
California Agriculture, United States Department of
Office AddressN/A
Contacts
Dylan HickeyState Environmental Compliance Coordinator
Brad KirbyDistrict Manager
Ken GriggsProject Leader, Klamath Basin National Wildlife Refuge Complex
Heather CasillasDeputy Area Manager

Full Description

Show more
Tulelake Irrigation District (TID), with NRCS as lead federal agency under the Watershed Protection and Flood Prevention Act (PL 83-566), proposes to modernize District infrastructure to improve agricultural water management and energy efficiency. The Preferred (Modernization) Alternative would upgrade pumps at 28 locations (pump and motor replacement, variable frequency drives, SCADA upgrades, and traveling screens) and install SCADA and automation equipment at 74 sites. Ground disturbance would be minimal and confined to existing rights-of-way. TThe project would improve delivery reliability to 924 patron accounts, Tule Lake NWR, and Lower Klamath NWR, and reduce operational spills and O&M costs.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Bids must be submitted using the EJCDC C-410 Bid Form and must include a bid bond. The successful contractor will be required to provide performance and payment bonds and proof of insurance. Performance is governed by EJCDC standard general and supplementary conditions, with substantial completion determined through joint inspections by the owner, contractor, and engineer. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the City of Belmont.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Requested services and supplies specifically include lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and bypass pumping. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, ahead of the project bid date on November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS