Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Turbine Runner Inspection & Damage Assessment

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 12 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves conducting thorough inspections and non-destructive testing of hydroelectric turbine runners to detect cavitation damage and material deterioration. The scope includes producing detailed technical assessment reports based on the findings. This subcontract is designated as a Total Small Business Set-Aside under FAR 19.5, with a focus on services classified under NAICS code 541330. Issued by the Department of the Interior's Pacific Northwest Region (PN 6615), the contract was posted on June 1, 2026, with a response deadline of June 12, 2026. The work will be performed at a location identified by the zip code 59919, although specific city and state details are not provided. The opportunity emphasizes engaging qualified small business entities to provide expertise in evaluating the structural integrity and operational condition of turbine components critical to hydroelectric power generation.

General Info

Perform inspections and non-destructive testing of hydroelectric turbine runners; small business set-aside.

Agency

Department Of The Interior → Pacific Nw Region Pn 6615View Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

ID, 59919

Set-Aside

SBA

Documents

This scope was carved out of 140R1026B0003.

The full solicitation package (23 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Z--Hungry Horse Power Plant Turbine Runner Cavitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pacific Nw Region Pn 6615
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Pacific Nw Region Pn 6615
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform detailed inspection and non-destructive testing (NDT) of hydroelectric turbine runners to identify cavitation damage and material degradation, and produce technical assessment reports.

More opportunities from Department Of The Interior → Pacific Nw Region Pn 6615

Same awarding agency

NAICS: 237990
New
Federal
Y--Conconully Dam, WA, Safety of Dams Modification
Solicitation # 140R1026R0004
The Department of the Interior, Bureau of Reclamation, is conducting market research via a Sources Sought notice and Industry Day invitation for the Conconully Dam Seismic Modification project in Conconully, Washington. The project aims to reduce seismic risk through critical infrastructure improvements, including deep soil mixing of foundation materials, the construction of a stability berm, and extensive outlet works modifications. Key technical tasks involve rock excavation, the installation of a new outlet works valve house, grout and concrete encasement of piping, and the implementation of fiber optic sensing cables and relief wells. The project also requires the management of bypass pumping or siphon flows to maintain in-channel requirements during the non-irrigation season, as the dam must remain operational throughout construction. The government anticipates a Rough Order of Magnitude value between 80 million and 100 million dollars, with a projected period of performance of approximately three years. The target solicitation date is set for late Fiscal Year 2027 or early Fiscal Year 2028. Work must adhere to strict technical standards, including ACI 318, ACI 350, AISC 360, and AWS D1.1, with a heavy emphasis on field verification of existing conditions and government approval for any material substitutions or design modifications. This current notice is for planning purposes only and does not constitute a formal request for proposals or a commitment to award a contract.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS